X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074091610003

Well Details

Well ID: 0074091610003
Loading map...
Location: 00/10-16-007-09W4/3
Location Alias: 00/10-16-07-09 W4M
Location Alias 2: 00/10-16-007-09 W4/03
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 09
Section: 16
County/Municipality: County of Forty Mile No. 8
Well Name: CVE 40MILE 10-16-7-9
Operator Name: Cenovus Energy Inc.
License Number: 0050319
License Date: 1974-07-03
License Status: RecCertified
Spud Date: 1974-07-04
Final Drill Date: 1974-07-10
Well Total Depth: 995.20 m
Surface Hole Latitude: 49.562379
Surface Hole Longitude: -111.161907

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-07-03 Obtained License
1974-07-07 Blow Occurred
1974-07-10 Blowout Occurred
1974-07-10 Finished Drilling
1974-07-11 Drill Stem Test Performed
1974-07-12 Drill Stem Test Performed
1974-07-12 Production Casing Operation Performed
1974-07-29 Perforation Treatment Performed - Jet Perforation
1978-08-10 Perforation Treatment Performed - Cement Squeeze
1978-08-12 Perforation Treatment Performed - Jet Perforation
1978-08-13 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-13 Perforation Treatment Performed - Jet Perforation
1988-10-25 Perforation Treatment Performed - Jet Perforation
1988-10-25 Well Log Performed
1988-10-25 Well Mode changed to Drilled and Cased
1994-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-09 Plug Back Performed
1994-08-09 Well Log Performed
1994-08-09 Well Mode changed to Abandoned Zone
1994-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-29 Perforation 939.40 940.00 10
1978-08-10 Cement Squeeze 939.40 940.00 0
1978-08-12 Perforation 938.20 938.80 10
1978-08-13 Perforation 938.80 939.10 13
1981-03-13 Packing Device Capped w/Cement 923.20 931.20 0
1981-03-13 Perforation 678.20 679.10 11
1988-10-25 Perforation 715.60 717.50 13
1994-08-09 Packing Device Capped w/Cement 667.00 675.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-07-07 Blow 939.00 939.00
1974-07-10 Blowout 937.60 937.60

For data sources see[5]

References