X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074083205002

Well Details

Well ID: 0074083205002
Loading map...
Location: 00/05-32-007-08W4/2
Location Alias: 00/05-32-07-08 W4M
Location Alias 2: 00/05-32-007-08 W4/02
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 08
Section: 32
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PEIGAN 5-32-7-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0104386
License Date: 1983-11-28
License Status: Issued
Spud Date: 1983-12-05
Final Drill Date: 1983-12-09
Well Total Depth: 952.00 m
Surface Hole Latitude: 49.601224
Surface Hole Longitude: -111.061179

For data sources see[1][2]

Well History

Date Event
1983-11-28 Obtained License
1983-12-09 Finished Drilling
1983-12-09 Well Mode changed to Drilled and Cased
1983-12-10 Well Log Performed
1983-12-11 Drill Stem Test Performed
1983-12-11 Well Log Performed
1983-12-12 Production Casing Operation Performed
1983-12-15 Well Log Performed
1983-12-21 Perforation Treatment Performed - Jet Perforation
1983-12-23 Perforation Treatment Performed - Cement Squeeze
1983-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-12-28 Plug Back Performed
1983-12-28 Well Log Performed
1983-12-29 Perforation Treatment Performed - Jet Perforation
1990-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-20 Perforation Treatment Performed - Jet Perforation
1990-02-20 Well Log Performed
1990-02-26 Well Began Production
1990-02-26 Well Fluid changed to Gas
1990-02-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-21 Perforation 936.50 937.00 13
1983-12-23 Cement Squeeze 936.50 937.00 0
1983-12-28 Packing Device Capped w/Cement 933.00 935.00 0
1983-12-29 Perforation 928.50 929.50 13
1990-02-20 Packing Device Capped w/Cement 926.00 926.00 0
1990-02-20 Perforation 912.00 915.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 5974 0.0 0.0 0.0
1991 6042 0.0 0.0 0.0
1992 8708 0.0 0.0 0.0
1993 7999 0.0 0.0 0.0
1994 8625 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 7559 0.0 0.0 0.0
1998 8687 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 7062 0.0 0.0 0.0
2002 8557 0.0 0.0 0.0
2003 8082 0.0 0.0 0.0
2004 8021 0.0 0.0 0.0
2005 7326 0.0 0.0 0.0
2006 8444 0.0 0.0 0.0
2007 8603 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 5548 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 6380 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 2350 0.0 0.0 0.0
2018 8713 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References