X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074023306002

Well Details

Well ID: 0074023306002
Loading map...
Location: 00/06-33-007-02W4/2
Location Alias: 00/06-33-07-02 W4M
Location Alias 2: 00/06-33-007-02 W4/02
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 02
Section: 33
County/Municipality: Cypress County
Well Name: CVE ELKW 6-33-7-2
Operator Name: Cenovus Energy Inc.
License Number: 0216721
License Date: 1998-07-29
License Status: RecCertified
Spud Date: 1998-08-28
Final Drill Date: 1998-09-01
Well Total Depth: 1294.00 m
Surface Hole Latitude: 49.602034
Surface Hole Longitude: -110.221345

For data sources see[1][2]

Well History

Date Event
1998-07-29 Obtained License
1998-08-28 Lost Circulation Occurred
1998-08-29 Surface Casing Operation Performed
1998-09-01 Finished Drilling
1998-09-01 Production Casing Operation Performed
1998-09-01 Rig Released
1998-09-01 Well Log Performed
1998-09-01 Well Mode changed to Drilled and Cased
1998-10-21 Well Log Performed
1998-10-28 Perforation Treatment Performed - Jet Perforation
1998-10-28 Well Log Performed
1998-10-29 Perforation Treatment Performed - Fractured
1999-09-22 Perforation Treatment Performed - Cement Squeeze
1999-09-22 Plug Back Performed
1999-09-27 Perforation Treatment Performed - Jet Perforation
1999-10-17 Perforation Treatment Performed - Fractured
2003-01-07 Well Log Performed
2003-01-09 Well Fluid changed to Gas
2003-01-09 Well Mode changed to Testing
2003-03-05 Well Log Performed
2003-05-27 Well Log Performed
2003-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-28 Perforation Treatment Performed - Jet Perforation
2003-05-28 Plug Back Performed
2003-05-28 Well Mode changed to Abandoned Zone
2003-06-07 Well Log Performed
2003-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-08 Plug Back Performed
2003-06-09 Perforation Treatment Performed - Jet Perforation
2003-06-14 Well Log Performed
2003-06-15 Perforation Treatment Performed - Jet Perforation
2004-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-17 Plug Back Performed
2004-11-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-28 Perforation 951.00 954.00 13
2003-06-15 Perforation 977.00 981.00 13
2004-11-17 Packing Device Capped w/Cement 1002.00 1010.00 0
2004-11-17 Packing Device Capped w/Cement 967.00 975.00 0
2004-11-17 Packing Device Capped w/Cement 941.00 949.00 0
1998-10-29 Fracture 951.00 954.00 0
1999-09-22 Cement Squeeze 951.00 954.00 0
1999-09-27 Perforation 1244.00 1247.00 13
1999-10-17 Fracture 1244.00 1247.00 0
2003-05-28 Packing Device Capped w/Cement 1234.00 1242.00 0
2003-05-28 Perforation 1064.00 1068.00 17
2003-06-08 Packing Device Capped w/Cement 1052.00 1060.00 0
2003-06-09 Perforation 1015.00 1019.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 72 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-08-28 Lost Circulation 5.00 198.00

For data sources see[6]

References