X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0065030911000

Well Details

Well ID: 0065030911000
Loading map...
Location: 00/11-09-006-03W5/0
Location Alias: 00/11-09-06-03 W5M
Location Alias 2: 00/11-09-006-03 W5/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 03
Section: 09
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL WATERTON 7-9-6-3
Operator Name: Shell Canada Limited
License Number: 0129430
License Date: 1987-10-20
License Status: Amended
Spud Date: 1987-11-21
Final Drill Date: 1988-04-21
Well Total Depth: 3595.00 m
Surface Hole Latitude: 49.459304
Surface Hole Longitude: -114.354760

For data sources see[1][2]

Well History

Date Event
1987-10-20 Obtained License
1987-12-05 Surface Casing Operation Performed
1988-01-02 Kick Occurred
1988-01-09 Direction Drilling Operation Performed - Deviate
1988-01-11 Kick Occurred
1988-02-06 Lost Circulation Occurred
1988-03-09 Well Log Performed
1988-03-10 Well Log Performed
1988-03-12 Intermediate Casing Operation Performed
1988-03-29 Well Log Performed
1988-04-21 Finished Drilling
1988-04-22 Well Log Performed
1988-04-25 Liner Casing Operation Performed
1988-04-28 Well Log Performed
1988-04-29 Rig Released
1988-06-08 Perforation Treatment Performed - Jet Perforation
1988-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-13 Perforation Treatment Performed - Fractured
1988-06-30 Well Mode changed to Drilled and Cased
1995-09-22 Well Began Production
1995-09-22 Well Fluid changed to Gas
1995-09-22 Well Mode changed to Flowing
1996-04-20 Perforation Treatment Performed - Jet Perforation
1996-04-21 Perforation Treatment Performed - Jet Perforation
1996-04-22 Perforation Treatment Performed - Jet Perforation
1996-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-29 Well Log Performed
1996-12-06 Well Log Performed
1997-08-15 Perforation Treatment Performed - Cement Plug
1997-08-15 Plug Back Performed
1997-08-15 Well Fluid changed to Gas
1997-08-15 Well Mode changed to Abandoned and Whipstocked
1997-08-17 Well Log Performed
1997-09-07 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-01-09 1757.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-08 Perforation 3359.80 3360.10 13
1988-06-08 Perforation 3420.00 3420.30 13
1988-06-08 Perforation 3422.50 3422.80 13
1988-06-08 Perforation 3423.50 3423.80 13
1988-06-08 Perforation 3425.50 3425.80 13
1988-06-08 Perforation 3426.80 3427.10 13
1988-06-08 Perforation 3428.90 3429.20 13
1988-06-08 Perforation 3430.20 3430.50 13
1988-06-08 Perforation 3431.50 3431.80 13
1988-06-08 Perforation 3432.80 3433.10 13
1988-06-08 Perforation 3434.10 3434.40 13
1988-06-08 Perforation 3370.30 3370.60 13
1988-06-08 Perforation 3443.70 3444.00 13
1988-06-08 Perforation 3447.00 3447.30 13
1988-06-08 Perforation 3450.00 3450.30 13
1988-06-08 Perforation 3454.00 3454.30 13
1988-06-08 Perforation 3459.00 3459.30 13
1988-06-08 Perforation 3468.40 3468.70 13
1988-06-08 Perforation 3469.70 3470.00 13
1988-06-08 Perforation 3472.00 3472.30 13
1988-06-08 Perforation 3473.30 3473.60 13
1988-06-08 Perforation 3475.00 3475.30 13
1988-06-08 Perforation 3371.70 3372.00 13
1988-06-08 Perforation 3373.10 3373.50 13
1988-06-08 Perforation 3374.80 3375.10 13
1988-06-08 Perforation 3377.20 3377.50 13
1988-06-08 Perforation 3378.70 3379.00 13
1988-06-10 Acid Treatment 3359.80 3475.30 0
1988-06-13 Fracture 3359.80 3475.30 0
1996-04-20 Perforation 3447.00 3448.00 7
1996-04-20 Perforation 3449.50 3451.00 7
1996-04-20 Perforation 3453.50 3455.00 7
1996-04-20 Perforation 3459.00 3460.00 7
1988-06-08 Perforation 3389.30 3389.60 13
1996-04-20 Perforation 3464.30 3470.30 7
1996-04-21 Perforation 3412.00 3414.50 7
1996-04-21 Perforation 3419.00 3427.00 7
1996-04-21 Perforation 3427.00 3435.00 7
1996-04-21 Perforation 3443.50 3444.50 7
1996-04-21 Perforation 3464.30 3470.30 7
1996-04-22 Perforation 3369.10 3378.80 7
1996-04-22 Perforation 3386.50 3391.50 7
1996-04-22 Perforation 3458.00 3462.00 7
1996-04-25 Acid Treatment 3359.80 3475.30 0
1988-06-08 Perforation 3390.40 3390.70 13
1997-08-15 Cement Plug 2807.00 3264.00 0
1997-08-15 Cement Plug 2400.00 2804.00 0
1988-06-08 Perforation 3412.00 3412.30 13
1988-06-08 Perforation 3413.70 3414.00 13
1988-06-08 Perforation 3416.80 3417.10 13
1988-06-08 Perforation 3418.80 3419.10 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1459 0.0 0.0 0.0
1996 1923 0.0 0.0 0.0
1997 171 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-01-02 Kick 1602.00 1602.00
1988-01-11 Kick 1851.00 1851.00
1988-02-06 Lost Circulation 2315.00 2317.00

For data sources see[7]

References