X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0065010516002

Well Details

Well ID: 0065010516002
Loading map...
Location: 00/16-05-006-01W5/2
Location Alias: 00/16-05-06-01 W5M
Location Alias 2: 00/16-05-006-01 W5/02
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 01
Section: 05
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL CDN-SUP WATERTON 16-5-6-1
Operator Name: Shell Canada Limited
License Number: 0085720
License Date: 1980-09-18
License Status: Issued
Spud Date: 1980-10-15
Final Drill Date: 1981-08-26
Well Total Depth: 5026.00 m
Surface Hole Latitude: 49.444418
Surface Hole Longitude: -114.101541

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-18 Obtained License
1980-12-23 Drill Stem Test Performed
1981-01-06 Drill Stem Test Performed
1981-08-26 Finished Drilling
1981-09-01 Liner Casing Operation Performed
1981-09-12 Perforation Treatment Performed - Jet Perforation
1981-09-20 Perforation Treatment Performed - Jet Perforation
1981-09-27 Perforation Treatment Performed - Fractured
1981-10-01 Perforation Treatment Performed - Fractured
1981-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-02 Perforation Treatment Performed - Jet Perforation
1981-10-02 Well Mode changed to Drilled and Cased
1981-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-14 Perforation Treatment Performed - Selective Jet Perforations
1982-06-17 Perforation Treatment Performed - Selective Jet Perforations
1982-06-22 Perforation Treatment Performed - Selective Jet Perforations
1982-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-27 Perforation Treatment Performed - Selective Jet Perforations
1982-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-29 Perforation Treatment Performed - Fractured
1982-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-09 Perforation Treatment Performed - Remedial Casing
1989-08-26 Perforation Treatment Performed - Remedial Casing
1989-08-27 Perforation Treatment Performed - Remedial Casing
1989-09-12 Perforation Treatment Performed - Fractured
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-06-29 Well Log Performed
1993-06-30 Perforation Treatment Performed - Jet Perforation
1993-06-30 Well Log Performed
1993-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-04-23 Perforation Treatment Performed - Cement Plug
2019-04-23 Perforation Treatment Performed - Jet Perforation
2019-04-23 Plug Back Performed
2019-04-30 Perforation Treatment Performed - Cement Squeeze
2019-05-01 Perforation Treatment Performed - Jet Perforation
2019-05-02 Perforation Treatment Performed - Cement Squeeze
2019-05-03 Perforation Treatment Performed - Cement Squeeze
2019-05-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-12 Perforation 4411.00 4417.00 13
1981-09-27 Fracture 3376.00 3388.00 0
1981-10-01 Fracture 3376.00 3388.00 0
1981-10-02 Perforation 3376.00 3388.00 13
1981-10-02 Acid Treatment 3376.00 3388.00 0
1981-10-05 Acid Treatment 3376.00 3388.00 0
1982-06-14 Selective Jet Perforations 2800.00 2800.00 0
1982-06-14 Selective Jet Perforations 2800.00 2800.00 0
1982-06-17 Selective Jet Perforations 2800.00 2800.00 0
1982-06-22 Selective Jet Perforations 2097.00 2097.00 0
1982-06-24 Acid Treatment 2800.00 2800.00 0
1981-09-12 Perforation 4418.00 4424.00 13
1982-06-27 Selective Jet Perforations 2600.00 2600.00 0
1982-06-28 Acid Treatment 2600.00 2600.00 0
1982-06-29 Fracture 2800.00 2800.00 0
1982-06-30 Acid Treatment 2800.00 2800.00 0
1982-07-05 Acid Treatment 2600.00 2600.00 0
1982-07-09 Remedial Casing Cementing 2800.00 2800.00 0
1989-08-26 Remedial Casing Cementing 2600.00 2600.00 0
1989-08-27 Remedial Casing Cementing 2097.00 2097.00 0
1989-09-12 Fracture 4411.00 4446.00 0
1993-06-29 Perforation 4456.00 4463.70 7
1981-09-12 Perforation 4427.00 4431.00 13
1993-06-29 Perforation 4463.80 4474.10 7
1993-06-29 Perforation 4476.10 4484.30 7
1993-06-30 Perforation 4484.50 4494.80 7
1993-07-20 Acid Treatment 4411.00 4494.80 0
2019-04-23 Cement Plug 4385.00 4525.00 0
2019-04-23 Perforation 4367.30 4372.00 17
2019-04-30 Cement Squeeze 4367.30 4372.00 0
2019-05-01 Perforation 4170.00 4173.00 17
2019-05-01 Perforation 4080.00 4082.00 17
2019-05-02 Cement Squeeze 4080.00 4173.00 0
1981-09-12 Perforation 4432.00 4436.00 13
2019-05-03 Perforation 3911.00 3915.00 17
2019-05-03 Perforation 3907.00 3911.00 17
2019-05-03 Cement Squeeze 3907.00 3915.00 0
1981-09-12 Perforation 4437.00 4439.00 13
1981-09-12 Perforation 4440.00 4446.00 13
1981-09-20 Perforation 3376.00 3378.00 13
1981-09-20 Perforation 3379.00 3384.00 13
1981-09-20 Perforation 3385.50 3388.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-18 No Incident Encountered 0.00 0.00
2019-04-17 No Incident Encountered 0.00 0.00
2019-04-23 No Incident Encountered 0.00 0.00
2019-04-30 No Incident Encountered 0.00 0.00
2019-05-01 No Incident Encountered 0.00 0.00
2019-05-02 No Incident Encountered 0.00 0.00
2019-05-03 No Incident Encountered 0.00 0.00
2019-04-24 No Incident Encountered 0.00 0.00

For data sources see[5]

References