X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064150402002

Well Details

Well ID: 0064150402002
Loading map...
Location: 00/02-04-006-15W4/2
Location Alias: 00/02-04-06-15 W4M
Location Alias 2: 00/02-04-006-15 W4/02
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 15
Section: 04
County/Municipality: County of Warner No. 5
Well Name: STRATEGIC CONRAD 2-4-6-15
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0030249
License Date: 1966-03-16
License Status: Suspension
Spud Date: 1966-03-17
Final Drill Date: 1966-03-21
Well Total Depth: 920.20 m
Surface Hole Latitude: 49.437753
Surface Hole Longitude: -111.964685

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-16 Obtained License
1966-03-21 Finished Drilling
1966-03-21 Well Mode changed to Drilled and Cased
1966-03-22 Production Casing Operation Performed
1966-05-24 Perforation Treatment Performed - Jet Perforation
1966-05-26 Perforation Treatment Performed - Cement Squeeze
1966-05-28 Perforation Treatment Performed - Jet Perforation
1966-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-23 Perforation Treatment Performed - Jet Perforation
1978-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-01 Well Began Injection
1978-12-01 Well Fluid changed to Water
1978-12-01 Well Type changed to Injection
1993-04-15 Perforation Treatment Performed - Cement Squeeze
1993-04-15 Plug Back Performed
1993-04-16 Perforation Treatment Performed - Jet Perforation
1993-06-15 Well Fluid changed to Water
1993-06-15 Well Mode changed to Closed
1993-06-15 Well Type changed to Injection
1993-06-22 Well Fluid changed to Water
1993-06-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-05-24 Perforation 899.50 900.10 7
1993-04-16 Perforation 899.50 902.80 13
1966-05-26 Cement Squeeze 899.50 900.10 0
1966-05-28 Perforation 899.50 899.80 7
1966-05-28 Perforation 868.70 869.30 7
1966-05-30 Acid Treatment 868.70 899.80 0
1978-11-23 Perforation 912.00 913.50 7
1978-11-23 Perforation 914.40 916.80 7
1978-11-25 Acid Treatment 912.00 916.80 0
1993-04-15 Cement Squeeze 912.00 916.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-04-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References