X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064050206000

Well Details

Well ID: 0064050206000
Loading map...
Location: 00/06-02-006-05W4/0
Location Alias: 00/06-02-06-05 W4M
Location Alias 2: 00/06-02-006-05 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 05
Section: 02
County/Municipality: County of Forty Mile No. 8
Well Name: CITY OF MEDH MANYB 6-2-6-5
Operator Name: City Of Medicine Hat
License Number: 0150750
License Date: 1991-11-25
License Status: Suspension
Spud Date: 1991-12-17
Final Drill Date: 1991-12-19
Well Total Depth: 1230.00 m
Surface Hole Latitude: 49.440546
Surface Hole Longitude: -110.578854

For data sources see[1][2]

Well History

Date Event
1991-11-25 Obtained License
1991-12-18 Surface Casing Operation Performed
1991-12-19 Finished Drilling
1991-12-19 Well Mode changed to Drilled and Cased
1991-12-20 Production Casing Operation Performed
1991-12-20 Well Log Performed
1991-12-21 Rig Released
1992-02-28 Well Log Performed
1992-04-07 Perforation Treatment Performed - Jet Perforation
1992-04-07 Well Log Performed
1992-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-14 Perforation Treatment Performed - Chemical Squeeze
1992-04-20 Perforation Treatment Performed - Jet Perforation
1992-04-20 Perforation Treatment Performed - Remedial Casing
1992-04-21 Perforation Treatment Performed - Jet Perforation
1992-04-21 Perforation Treatment Performed - Remedial Casing
1992-05-14 Well Began Production
1992-05-14 Well Fluid changed to Crude Oil
1992-05-14 Well Mode changed to Pumping
1992-07-16 Perforation Treatment Performed - Jet Perforation
1992-07-16 Perforation Treatment Performed - Selective Bullet Perforations
1998-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-08 Plug Back Performed
1998-08-08 Well Fluid changed to Crude Oil
1998-08-08 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-07 Perforation 1221.00 1223.50 13
1998-08-08 Packing Device Capped w/Cement 1207.00 1215.00 0
1992-04-10 Acid Treatment 1221.00 1223.50 0
1992-04-14 Chemical Squeeze 1221.00 1223.50 0
1992-04-20 Perforation 246.70 247.00 56
1992-04-20 Remedial Casing Cementing 246.70 247.00 0
1992-04-21 Perforation 187.00 187.30 20
1992-04-21 Remedial Casing Cementing 187.00 187.30 0
1992-07-16 Selective Bullet Perforations 1213.00 1213.00 0
1992-07-16 Perforation 1221.60 1222.80 2

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5223 0.0 0.0 0.0
1993 480 0.0 0.0 0.0
1995 6161 0.0 0.0 0.0
1996 4784 0.0 0.0 0.0
1997 4804 0.0 0.0 0.0
1998 2208 0.0 0.0 0.0

For data sources see[5]

References