X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0054142001000

Well Details

Well ID: 0054142001000
Loading map...
Location: 00/01-20-005-14W4/0
Location Alias: 00/01-20-05-14 W4M
Location Alias 2: 00/01-20-005-14 W4/00
Country: Canada
Province: Alberta
Township: 005
Meridian: 4
Range: 14
Section: 20
County/Municipality: County of Forty Mile No. 8
Well Name: DENISONRESOURCES CONRAD 1-20-5-14
Operator Name: Journey Energy Inc.
License Number: 0121439
License Date: 1986-01-15
License Status: Issued
Spud Date: 1986-02-19
Final Drill Date: 1986-02-22
Well Total Depth: 965.00 m
Surface Hole Latitude: 49.395430
Surface Hole Longitude: -111.847410

For data sources see[1][2]

Well History

Date Event
1986-01-15 Obtained License
1986-02-19 Surface Casing Operation Performed
1986-02-22 Finished Drilling
1986-02-22 Well Log Performed
1986-02-22 Well Mode changed to Drilled and Cased
1986-02-23 Drill Stem Test Performed
1986-02-23 Well Log Performed
1986-02-24 Production Casing Operation Performed
1986-02-24 Rig Released
1986-03-31 Well Log Performed
1986-04-01 Well Log Performed
1986-04-02 Perforation Treatment Performed - Jet Perforation
1986-04-04 Well Began Production
1986-04-04 Well Fluid changed to Crude Oil
1986-04-04 Well Mode changed to Pumping
2009-10-04 Perforation Treatment Performed - Chemical Squeeze
2009-10-04 Perforation Treatment Performed - Jet Perforation
2009-10-05 Well Log Performed
2009-10-06 Well Log Performed
2009-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-08 Well Log Performed
2010-07-01 Well Began Injection
2010-07-01 Well Fluid changed to Water
2010-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-04-02 Perforation 917.00 919.50 13
2009-10-04 Perforation 917.00 919.50 17
2009-10-04 Chemical Squeeze 917.00 919.50 0
2009-10-07 Acid Treatment 917.00 919.50 0
2009-10-08 Acid Treatment 917.00 919.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6371 0.0 0.0 0.0
1987 7563 0.0 0.0 0.0
1988 8495 0.0 0.0 0.0
1989 8556 0.0 0.0 0.0
1990 7642 0.0 0.0 0.0
1991 8544 0.0 0.0 0.0
1992 8698 0.0 0.0 0.0
1993 8711 0.0 0.0 0.0
1994 8699 0.0 0.0 0.0
1995 8669 0.0 0.0 0.0
1996 8725 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8682 0.0 0.0 0.0
1999 8681 0.0 0.0 0.0
2000 8773 0.0 0.0 0.0
2001 8706 0.0 0.0 0.0
2002 8617 0.0 0.0 0.0
2003 8574 0.0 0.0 0.0
2004 8768 0.0 0.0 0.0
2005 8631 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8683 0.0 0.0 0.0
2009 8492 0.0 0.0 0.0
2010 2671 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References