If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0045023606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.339717,"lon":-114.149084,"icon":""}]} |
Location: 00/06-36-004-02W5/0 | |
Location Alias: 00/06-36-04-02 W5M | |
Location Alias 2: 00/06-36-004-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 004 | |
Meridian: 5 | |
Range: 02 | |
Section: 36 | |
County/Municipality: Municipal District of Pincher Creek No. 9 | |
Well Name: SHELL 4 WATERTON 6-36-4-2 | |
Operator Name: Shell Canada Limited | |
License Number: 0014985 | |
License Date: 1958-03-14 | |
License Status: RecCertified | |
Spud Date: 1958-06-02 | |
Final Drill Date: 1959-01-03 | |
Well Total Depth: 4277.00 m | |
Surface Hole Latitude: 49.339717 | |
Surface Hole Longitude: -114.149084 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-03-14 | Obtained License |
1959-01-03 | Finished Drilling |
1959-01-05 | Well Log Performed |
1959-01-12 | Production Casing Operation Performed |
1959-01-26 | Perforation Treatment Performed - Open-Hole Completion |
1959-01-30 | Perforation Treatment Performed - Bullet Perforation |
1959-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-26 | Perforation Treatment Performed - Selective Bullet Perforations |
1959-02-27 | Perforation Treatment Performed - Selective Bullet Perforations |
1959-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-03-13 | Perforation Treatment Performed - Cement Plug |
1959-03-25 | Perforation Treatment Performed - Jet Perforation |
1959-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-06-09 | Well Mode changed to Drilled and Cased |
1961-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1961-05-30 | Perforation Treatment Performed - Jet Perforation |
1961-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-06-27 | Well Fluid changed to Gas |
1990-06-27 | Well Mode changed to Testing |
1990-06-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-06-28 | Plug Back Performed |
1990-06-28 | Well Fluid changed to Gas |
1990-06-28 | Well Log Performed |
1990-06-28 | Well Mode changed to Abandoned |
1990-07-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-01-26 | Open Hole/Barefoot Completion | 4087.40 | 4277.00 | 0 |
1959-02-26 | Selective Bullet Perforations | 3810.00 | 3871.00 | 0 |
1959-02-26 | Selective Bullet Perforations | 3931.90 | 3931.90 | 0 |
1959-02-27 | Selective Bullet Perforations | 3613.40 | 3618.00 | 0 |
1959-02-27 | Selective Bullet Perforations | 3621.00 | 3630.20 | 0 |
1959-02-27 | Selective Bullet Perforations | 3672.80 | 3678.90 | 0 |
1959-02-27 | Selective Bullet Perforations | 3651.50 | 3665.20 | 0 |
1959-02-27 | Selective Bullet Perforations | 3683.50 | 3683.50 | 0 |
1959-02-28 | Acid Treatment | 3613.40 | 3931.90 | 0 |
1959-03-13 | Cement Plug | 3911.20 | 3983.70 | 0 |
1959-03-25 | Perforation | 3614.90 | 3624.10 | 13 |
1959-01-30 | Bullet Perforation | 3936.20 | 3943.50 | 7 |
1959-03-27 | Acid Treatment | 3614.90 | 3624.10 | 0 |
1959-03-31 | Acid Treatment | 3614.90 | 3624.10 | 0 |
1959-04-03 | Acid Treatment | 3614.90 | 3624.10 | 0 |
1959-04-09 | Acid Treatment | 3614.90 | 3624.10 | 0 |
1961-05-29 | Packing Device Capped w/Cement | 3579.00 | 3579.00 | 0 |
1961-05-30 | Perforation | 3547.90 | 3550.90 | 7 |
1961-05-30 | Perforation | 3532.30 | 3535.40 | 7 |
1961-05-30 | Perforation | 3494.80 | 3501.50 | 7 |
1961-05-30 | Perforation | 3456.40 | 3462.80 | 7 |
1961-06-04 | Acid Treatment | 3456.40 | 3550.90 | 0 |
1959-02-12 | Acid Treatment | 4087.40 | 4277.00 | 0 |
1961-06-09 | Acid Treatment | 3456.40 | 3550.90 | 0 |
1990-06-28 | Packing Device Capped w/Cement | 3428.60 | 3436.60 | 0 |
1990-06-28 | Packing Device Capped w/Cement | 2662.00 | 2670.00 | 0 |
1959-02-13 | Acid Treatment | 3936.20 | 3943.50 | 0 |
1959-02-20 | Acid Treatment | 3936.20 | 3943.50 | 0 |
1959-02-26 | Selective Bullet Perforations | 3689.90 | 3703.30 | 0 |
1959-02-26 | Selective Bullet Perforations | 3706.40 | 3721.60 | 0 |
1959-02-26 | Selective Bullet Perforations | 3736.80 | 3742.90 | 0 |
1959-02-26 | Selective Bullet Perforations | 3764.30 | 3803.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]