X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0045011506000

Well Details

Well ID: 0045011506000
Loading map...
Location: 00/06-15-004-01W5/0
Location Alias: 00/06-15-04-01 W5M
Location Alias 2: 00/06-15-004-01 W5/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 5
Range: 01
Section: 15
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL 16 WATERTON 5-15-4-1
Operator Name: Shell Canada Limited
License Number: 0020342
License Date: 1961-01-27
License Status: Issued
Spud Date: 1961-02-02
Final Drill Date: 1961-06-03
Well Total Depth: 3692.00 m
Surface Hole Latitude: 49.295759
Surface Hole Longitude: -114.063375

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-27 Obtained License
1961-05-13 Production Casing Operation Performed
1961-05-28 Drill Stem Test Performed
1961-06-03 Finished Drilling
1961-06-03 Well Mode changed to Drilled and Cased
1961-06-13 Perforation Treatment Performed - Jet Perforation
1961-06-15 Perforation Treatment Performed - Condensate Squeeze
1961-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-09 Well Began Production
1962-06-09 Well Fluid changed to Gas
1962-06-09 Well Mode changed to Flowing
1973-02-05 Well Fluid changed to Gas
1973-02-05 Well Mode changed to Suspended
1974-11-20 Well Fluid changed to Gas
1974-11-20 Well Mode changed to Flowing
1975-02-01 Well Fluid changed to Gas
1975-02-01 Well Mode changed to Suspended
1976-11-23 Well Fluid changed to Gas
1976-11-23 Well Mode changed to Flowing
2015-10-22 Well Fluid changed to Gas
2015-10-22 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-13 Perforation 3527.50 3530.50 7
1961-06-13 Perforation 3530.80 3533.90 7
1961-06-13 Perforation 3533.90 3536.90 7
1961-06-13 Perforation 3537.20 3540.30 7
1961-06-15 Condensate Squeeze 3527.50 3540.30 0
1961-06-29 Acid Treatment 3527.50 3540.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 5557 0.0 0.0 0.0
1974 790 0.0 0.0 0.0
1975 315 0.0 0.0 0.0
1976 933 0.0 0.0 0.0
1977 4867 0.0 0.0 0.0
1978 8270 0.0 0.0 0.0
1979 8227 0.0 0.0 0.0
1980 8760 0.0 0.0 0.0
1981 8248 0.0 0.0 0.0
1982 8186 0.0 0.0 0.0
1983 8529 0.0 0.0 0.0
1984 8079 0.0 0.0 0.0
1985 7184 0.0 0.0 0.0
1986 8467 0.0 0.0 0.0
1987 8418 0.0 0.0 0.0
1988 8614 0.0 0.0 0.0
1989 8629 0.0 0.0 0.0
1990 4113 0.0 0.0 0.0
1991 262 0.0 0.0 0.0
1992 3040 0.0 0.0 0.0
1993 7578 0.0 0.0 0.0
1994 8403 0.0 0.0 0.0
1995 8577 0.0 0.0 0.0
1996 7980 0.0 0.0 0.0
1997 8560 0.0 0.0 0.0
1998 8271 0.0 0.0 0.0
1999 8687 0.0 0.0 0.0
2000 8484 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 8411 0.0 0.0 0.0
2003 8547 0.0 0.0 0.0
2004 8110 0.0 0.0 0.0
2005 8243 0.0 0.0 0.0
2006 8508 0.0 0.0 0.0
2007 8328 0.0 0.0 0.0
2008 4592 0.0 0.0 0.0
2009 1977 0.0 0.0 0.0
2010 7382 0.0 0.0 0.0
2011 6148 0.0 0.0 0.0
2012 3617 0.0 0.0 0.0
2013 7329 0.0 0.0 0.0
2014 7107 0.0 0.0 0.0
2015 7174 0.0 0.0 0.0
2016 8467 0.0 0.0 0.0
2017 7606 0.0 0.0 0.0
2018 7978 0.0 0.0 0.0
2019 7431 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-06-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References