Well ID: 0044133016002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.333379,"lon":-111.733028,"icon":""}]} |
Location: 00/16-30-004-13W4/2 | |
Location Alias: 00/16-30-04-13 W4M | |
Location Alias 2: 00/16-30-004-13 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 004 | |
Meridian: 4 | |
Range: 13 | |
Section: 30 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: SWORD CONRAD 16-30-4-13 | |
Operator Name: Journey Energy Inc. | |
License Number: 0385679 | |
License Date: 2007-11-27 | |
License Status: Abandoned | |
Spud Date: 2007-12-07 | |
Final Drill Date: 2007-12-10 | |
Well Total Depth: 931.00 m | |
Surface Hole Latitude: 49.333379 | |
Surface Hole Longitude: -111.733028 |
Date | Event |
---|---|
2007-11-27 | Obtained License |
2007-12-08 | Surface Casing Operation Performed |
2007-12-10 | Finished Drilling |
2007-12-10 | Well Log Performed |
2007-12-10 | Well Mode changed to Drilled and Cased |
2007-12-11 | Well Log Performed |
2007-12-12 | Production Casing Operation Performed |
2007-12-12 | Rig Released |
2007-12-22 | Perforation Treatment Performed - Jet Perforation |
2008-01-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-05 | Plug Back Performed |
2008-01-06 | Perforation Treatment Performed - Jet Perforation |
2008-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-07 | Plug Back Performed |
2008-01-08 | Perforation Treatment Performed - Jet Perforation |
2008-01-09 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2008-01-09 | Plug Back Performed |
2008-01-09 | Well Mode changed to Abandoned Zone |
2009-12-18 | Well Abandoned |
2009-12-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-12-22 | Perforation | 908.50 | 916.50 | 13 |
2008-01-05 | Packing Device Capped w/Cement | 895.00 | 903.00 | 0 |
2008-01-06 | Perforation | 658.00 | 664.00 | 13 |
2008-01-07 | Packing Device Capped w/Cement | 645.50 | 653.50 | 0 |
2008-01-08 | Perforation | 619.00 | 622.00 | 13 |
2008-01-09 | Packing Dev Cpd w/Res-Gyp Cem | 611.00 | 614.00 | 0 |
For data sources see[4]