If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0034293515000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.257381,"lon":-113.799345,"icon":""}]} |
Location: 00/15-35-003-29W4/0 | |
Location Alias: 00/15-35-03-29 W4M | |
Location Alias 2: 00/15-35-003-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 003 | |
Meridian: 4 | |
Range: 29 | |
Section: 35 | |
County/Municipality: Municipal District of Pincher Creek No. 9 | |
Well Name: B.A. PINCHER CREEK 10-35-3-29 | |
Operator Name: 63943 Alberta Ltd. | |
License Number: 0016305 | |
License Date: 1958-11-24 | |
License Status: RecCertified | |
Spud Date: 1958-12-25 | |
Final Drill Date: 1959-04-20 | |
Well Total Depth: 3769.20 m | |
Surface Hole Latitude: 49.257381 | |
Surface Hole Longitude: -113.799345 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-11-24 | Obtained License |
1959-04-08 | Liner Casing Operation Performed |
1959-04-20 | Finished Drilling |
1959-04-20 | Perforation Treatment Performed - Open-Hole Completion |
1959-04-20 | Well Mode changed to Drilled and Cased |
1959-04-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-04-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-05-02 | Perforation Treatment Performed - Condensate Squeeze |
1959-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-05-13 | Perforation Treatment Performed - Fractured |
1959-05-14 | Perforation Treatment Performed - Fractured |
1959-06-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1959-06-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1959-07-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-07-02 | Perforation Treatment Performed - Fractured |
1959-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-12-14 | Well Began Production |
1959-12-14 | Well Fluid changed to Gas |
1959-12-14 | Well Mode changed to Flowing |
1976-12-27 | Well Fluid changed to Gas |
1976-12-27 | Well Mode changed to Suspended |
1984-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-09-15 | Plug Back Performed |
1984-09-15 | Well Fluid changed to Gas |
1984-09-15 | Well Mode changed to Abandoned |
1984-09-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-04-20 | Open Hole/Barefoot Completion | 3697.50 | 3769.20 | 0 |
1959-06-28 | Acid Wash | 3697.50 | 3769.20 | 0 |
1959-07-02 | Fracture | 3697.50 | 3769.20 | 0 |
1959-07-02 | Acid Treatment | 3697.50 | 3769.20 | 0 |
1959-07-11 | Acid Treatment | 3697.50 | 3769.20 | 0 |
1984-09-15 | Packing Device Capped w/Cement | 3671.00 | 3680.00 | 0 |
1959-04-28 | Acid Treatment | 3697.50 | 3769.20 | 0 |
1959-04-29 | Acid Treatment | 3693.30 | 3769.20 | 0 |
1959-05-02 | Acid Treatment | 3693.30 | 3769.20 | 0 |
1959-05-02 | Condensate Squeeze | 3693.30 | 3769.20 | 0 |
1959-05-11 | Acid Treatment | 3693.30 | 3769.20 | 0 |
1959-05-13 | Fracture | 3693.30 | 3769.20 | 0 |
1959-05-14 | Fracture | 3693.30 | 3769.20 | 0 |
1959-06-28 | Hydra Jet Perforation | 3751.50 | 3751.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 1092 | 0.0 | 0.0 | 0.0 |
1971 | 888 | 0.0 | 0.0 | 0.0 |
1972 | 364 | 0.0 | 0.0 | 0.0 |
1973 | 326 | 0.0 | 0.0 | 0.0 |
1974 | 432 | 0.0 | 0.0 | 0.0 |
1975 | 335 | 0.0 | 0.0 | 0.0 |
1976 | 335 | 0.0 | 0.0 | 0.0 |
1978 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]