X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034161909020

Well Details

Well ID: 0034161909020
Loading map...
Location: 02/09-19-003-16W4/0
Location Alias: 02/09-19-03-16 W4M
Location Alias 2: 02/09-19-003-16 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 16
Section: 19
County/Municipality: County of Warner No. 5
Well Name: D3EXP 15B-24 HZ FERGUSON 9-19-3-16
Operator Name: Granite Oil Corp.
License Number: 0474528
License Date: 2015-02-09
License Status: Amended
Spud Date: 2015-02-26
Final Drill Date: 2015-03-11
Well Total Depth: 3415.00 m
Surface Hole Latitude: 49.229063
Surface Hole Longitude: -112.168111

For data sources see[1][2]

Well History

Date Event
2015-02-09 Obtained License
2015-02-27 Direction Drilling Operation Performed - Deviate
2015-02-28 Surface Casing Operation Performed
2015-03-03 Direction Drilling Operation Performed - Horizontal
2015-03-03 Well Log Performed
2015-03-11 Finished Drilling
2015-03-11 Well Log Performed
2015-03-11 Well Mode changed to Drilled and Cased
2015-03-19 Liner Casing Operation Performed
2015-03-19 Production Casing Operation Performed
2015-03-19 Rig Released
2015-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-27 Well Began Production
2015-03-27 Well Fluid changed to Crude Oil
2015-03-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-02-27 187.00 Deviate (5 - 79 degrees)
2015-03-03 1399.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-25 Multi-Stage Fracture 3371.20 3371.30 0
2015-03-25 Multi-Stage Fracture 2833.50 2833.60 0
2015-03-25 Multi-Stage Fracture 2775.90 2776.00 0
2015-03-25 Multi-Stage Fracture 2720.10 2720.20 0
2015-03-25 Multi-Stage Fracture 2650.30 2650.40 0
2015-03-25 Multi-Stage Fracture 2591.30 2591.40 0
2015-03-26 Multi-Stage Fracture 2532.80 2532.90 0
2015-03-26 Multi-Stage Fracture 2481.70 2481.80 0
2015-03-26 Multi-Stage Fracture 2410.80 2410.90 0
2015-03-26 Multi-Stage Fracture 2354.10 2354.20 0
2015-03-26 Multi-Stage Fracture 2296.30 2296.40 0
2015-03-25 Multi-Stage Fracture 3314.30 3314.40 0
2015-03-26 Multi-Stage Fracture 2241.20 2241.30 0
2015-03-26 Multi-Stage Fracture 2171.00 2171.10 0
2015-03-26 Multi-Stage Fracture 2113.00 2113.10 0
2015-03-26 Multi-Stage Fracture 2057.20 2057.30 0
2015-03-26 Multi-Stage Fracture 1998.90 1999.00 0
2015-03-26 Multi-Stage Fracture 1928.10 1928.20 0
2015-03-26 Multi-Stage Fracture 1871.70 1871.80 0
2015-03-26 Multi-Stage Fracture 1814.30 1814.40 0
2015-03-26 Multi-Stage Fracture 1759.20 1759.30 0
2015-03-26 Multi-Stage Fracture 1690.10 1690.20 0
2015-03-25 Multi-Stage Fracture 3255.60 3255.70 0
2015-03-26 Multi-Stage Fracture 1634.50 1634.60 0
2015-03-26 Multi-Stage Fracture 1575.90 1576.00 0
2015-03-26 Multi-Stage Fracture 1519.60 1519.70 0
2015-03-26 Multi-Stage Fracture 1461.50 1461.60 0
2015-03-25 Multi-Stage Fracture 3197.00 3197.10 0
2015-03-25 Multi-Stage Fracture 3137.90 3138.00 0
2015-03-25 Multi-Stage Fracture 3079.20 3079.30 0
2015-03-25 Multi-Stage Fracture 3008.30 3008.40 0
2015-03-25 Multi-Stage Fracture 2950.80 2950.90 0
2015-03-25 Multi-Stage Fracture 2892.40 2892.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-25 2015-03-26 1,283 532 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 11.4164 N/A
N2 7727-37-9 100 20.8689 N/A
non-hazardous ingredients Not Available 100 11.4164 N/A
water Not Available 100 30.5685 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 20.0326 N/A
FCB-1 Trican Breaker severely refined mineral oil Trade Secret 100 0.0511 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0842 N/A
water Not Available 100 0.0842 N/A
FC-1 Trican Surfactant isopropanol 67-63-0 100 0.7812 N/A
N.N.N-dimethyl-1-octadecanamine 124-28-7 100 0.7812 N/A
N.N.N-dimethyl-1-octadecanamine-HCL 1613-17-8 100 0.7812 N/A
N.N.N-trimethyl-1-octadecaminium chloride 112-03-8 100 0.7812 N/A
FC-2 Trican Surfactant organic salt 9292 100 0.6833 N/A
water Not Available 100 0.6833 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6540 0.0 0.0 0.0
2016 8434 0.0 0.0 0.0
2017 8408 0.0 0.0 0.0
2018 8645 0.0 0.0 0.0
2019 574 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-21 No Incident Encountered 0.00 0.00
2015-03-31 No Incident Encountered 0.00 0.00

For data sources see[8]

References