X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034093316002

Well Details

Well ID: 0034093316002
Loading map...
Location: 00/16-33-003-09W4/2
Location Alias: 00/16-33-03-09 W4M
Location Alias 2: 00/16-33-003-09 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 09
Section: 33
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 16-33-3-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0117822
License Date: 1985-09-23
License Status: Issued
Spud Date: 1985-10-05
Final Drill Date: 1985-10-07
Well Total Depth: 738.00 m
Surface Hole Latitude: 49.257797
Surface Hole Longitude: -111.154406

For data sources see[1][2]

Well History

Date Event
1985-09-23 Obtained License
1985-10-05 Surface Casing Operation Performed
1985-10-07 Finished Drilling
1985-10-07 Well Mode changed to Drilled and Cased
1985-10-08 Drill Stem Test Performed
1985-10-08 Well Log Performed
1985-10-09 Production Casing Operation Performed
1985-10-09 Rig Released
1985-12-09 Perforation Treatment Performed - Jet Perforation
1985-12-11 Perforation Treatment Performed - Jet Perforation
1985-12-12 Perforation Treatment Performed - Jet Perforation
1986-10-11 Perforation Treatment Performed - Fractured
1999-05-06 Well Log Performed
1999-05-07 Perforation Treatment Performed - Jet Perforation
1999-05-18 Perforation Treatment Performed - Cement Squeeze
1999-05-18 Plug Back Performed
1999-05-20 Perforation Treatment Performed - Jet Perforation
1999-05-20 Well Mode changed to Drilled and Cased
1999-05-21 Perforation Treatment Performed - Fractured
1999-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-06 Plug Back Performed
1999-06-10 Well Began Production
1999-06-10 Well Fluid changed to Gas
1999-06-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-09 Perforation 625.00 625.50 13
1999-05-20 Perforation 528.00 529.00 7
1999-05-21 Fracture 528.00 529.00 0
1999-06-06 Packing Device Capped w/Cement 607.00 615.00 0
1985-12-09 Perforation 628.00 628.50 13
1985-12-11 Perforation 625.00 625.50 13
1985-12-11 Perforation 628.00 628.50 13
1985-12-12 Perforation 628.00 628.50 13
1986-10-11 Fracture 625.00 628.50 0
1999-05-07 Perforation 567.00 570.00 7
1999-05-18 Cement Squeeze 567.00 570.00 0
1999-05-20 Perforation 524.00 526.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4677 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8058 0.0 0.0 0.0
2002 8675 0.0 0.0 0.0
2003 8691 0.0 0.0 0.0
2004 8762 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8606 0.0 0.0 0.0
2008 8757 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References