X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034081714003

Well Details

Well ID: 0034081714003
Loading map...
Location: 00/14-17-003-08W4/3
Location Alias: 00/14-17-03-08 W4M
Location Alias 2: 00/14-17-003-08 W4/03
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 14-17-3-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0227406
License Date: 1999-10-13
License Status: Suspension
Spud Date: 2000-08-20
Final Drill Date: 2000-08-25
Well Total Depth: 940.00 m
Surface Hole Latitude: 49.216388
Surface Hole Longitude: -111.049463

For data sources see[1][2]

Well History

Date Event
1999-10-13 Obtained License
2000-08-21 Direction Drilling Operation Performed - Deviate
2000-08-21 Surface Casing Operation Performed
2000-08-25 Finished Drilling
2000-08-25 Well Log Performed
2000-08-25 Well Mode changed to Drilled and Cased
2000-08-26 Intermediate Casing Operation Performed
2000-08-26 Rig Released
2000-09-13 Perforation Treatment Performed - Jet Perforation
2000-09-14 Well Log Performed
2000-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-16 Perforation Treatment Performed - Jet Perforation
2000-09-16 Plug Back Performed
2000-09-17 Perforation Treatment Performed - Jet Perforation
2000-09-17 Well Log Performed
2000-09-18 Well Log Performed
2000-09-19 Well Log Performed
2000-11-22 Well Began Production
2000-11-22 Well Fluid changed to Gas
2000-11-22 Well Mode changed to Flowing
2002-12-04 Well Structure changed to Commingled
2006-01-21 Perforation Treatment Performed - Jet Perforation
2006-04-01 Well Fluid changed to Gas
2006-04-01 Well Mode changed to Flowing
2006-07-01 Well Fluid changed to Gas
2006-07-01 Well Mode changed to Suspended
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-08-21 167.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-13 Perforation 881.00 882.00 13
2000-09-16 Packing Device Capped w/Cement 867.00 875.00 0
2000-09-16 Perforation 701.50 702.50 13
2000-09-17 Perforation 635.50 636.50 14
2006-01-21 Perforation 672.00 674.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 959 0.0 0.0 0.0
2001 216 0.0 0.0 0.0
2006 2155 0.0 0.0 0.0
2017 7487 0.0 0.0 0.0
2018 7247 0.0 0.0 0.0

For data sources see[6]

References