X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034081206000

Well Details

Well ID: 0034081206000
Loading map...
Location: 00/06-12-003-08W4/0
Location Alias: 00/06-12-03-08 W4M
Location Alias 2: 00/06-12-003-08 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 12
County/Municipality: County of Forty Mile No. 8
Well Name: CVE PENDOR 6-12-3-8
Operator Name: Cenovus Energy Inc.
License Number: 0033623
License Date: 1968-02-08
License Status: RecCertified
Spud Date: 1968-03-04
Final Drill Date: 1968-03-10
Well Total Depth: 970.20 m
Surface Hole Latitude: 49.193777
Surface Hole Longitude: -110.961563

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-02-08 Obtained License
1968-03-10 Drill Stem Test Performed
1968-03-10 Finished Drilling
1968-03-11 Drill Stem Test Performed
1968-03-12 Production Casing Operation Performed
1968-06-20 Perforation Treatment Performed - Jet Perforation
1969-05-07 Perforation Treatment Performed - Cement Squeeze
1969-05-07 Well Mode changed to Drilled and Cased
1969-05-08 Perforation Treatment Performed - Jet Perforation
1974-06-10 Well Began Production
1974-06-10 Well Fluid changed to Gas
1974-06-10 Well Mode changed to Flowing
1977-05-19 Well Fluid changed to Gas
1977-05-19 Well Mode changed to Suspended
1986-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-08 Perforation Treatment Performed - Jet Perforation
1986-10-08 Plug Back Performed
1986-10-08 Well Fluid changed to Gas
1986-10-08 Well Mode changed to Abandoned Zone
1987-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-02-09 Perforation Treatment Performed - Jet Perforation
1987-02-09 Plug Back Performed
1987-02-12 Perforation Treatment Performed - Jet Perforation
1987-02-18 Perforation Treatment Performed - Fractured
1992-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-23 Plug Back Performed
1992-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-06-20 Perforation 630.90 632.20 13
1987-02-09 Packing Device Capped w/Cement 508.00 516.00 0
1987-02-09 Perforation 330.70 331.70 13
1987-02-09 Perforation 349.50 350.50 13
1987-02-12 Perforation 323.10 326.10 13
1987-02-18 Fracture 323.10 326.10 0
1992-09-23 Packing Device Capped w/Cement 306.00 314.00 0
1969-05-07 Cement Squeeze 630.90 632.20 0
1969-05-08 Perforation 656.50 657.80 10
1986-10-08 Packing Device Capped w/Cement 617.00 625.00 0
1986-10-08 Perforation 524.20 526.00 13
1986-10-08 Perforation 527.80 529.70 13
1986-10-08 Perforation 532.10 533.30 13
1986-10-08 Perforation 537.00 537.60 13
1986-10-08 Perforation 538.80 539.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 4070 0.0 0.0 0.0
1976 25 0.0 0.0 0.0
1977 335 0.0 0.0 0.0

For data sources see[5]

References