X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034070510002

Well Details

Well ID: 0034070510002
Loading map...
Location: 00/10-05-003-07W4/2
Location Alias: 00/10-05-03-07 W4M
Location Alias 2: 00/10-05-003-07 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 07
Section: 05
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 10-5-3-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0012344
License Date: 1956-09-24
License Status: Suspension
Spud Date: 1956-12-06
Final Drill Date: 1956-12-13
Well Total Depth: 722.40 m
Surface Hole Latitude: 49.182200
Surface Hole Longitude: -110.909602

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-09-24 Obtained License
1956-12-13 Drill Stem Test Performed
1956-12-13 Finished Drilling
1956-12-13 Well Mode changed to Drilled and Cased
1956-12-14 Well Log Performed
1956-12-17 Drill Stem Test Performed
1956-12-17 Production Casing Operation Performed
1957-07-17 Perforation Treatment Performed - Bullet Perforation
1958-10-08 Perforation Treatment Performed - Cement Squeeze
1958-10-10 Perforation Treatment Performed - Bullet Perforation
1959-09-24 Perforation Treatment Performed - Cement Squeeze
1959-09-26 Perforation Treatment Performed - Bullet Perforation
1959-09-26 Well Began Production
1959-09-26 Well Fluid changed to Gas
1959-09-26 Well Mode changed to Flowing
1959-09-29 Perforation Treatment Performed - Fractured
1961-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-07-16 Well Fluid changed to Gas
1983-07-16 Well Mode changed to Flowing
2007-02-28 Perforation Treatment Performed - Jet Perforation
2007-02-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-07-17 Bullet Perforation 624.20 625.10 26
1958-10-08 Cement Squeeze 624.20 625.10 0
1958-10-10 Bullet Perforation 623.60 624.50 26
1959-09-24 Cement Squeeze 623.60 624.50 0
1959-09-26 Bullet Perforation 653.20 655.60 10
1959-09-29 Fracture 653.20 655.60 0
1961-10-13 Acid Treatment 653.20 655.60 0
2007-02-28 Perforation 639.00 643.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1457 0.0 0.0 0.0
1969 6296 0.0 0.0 0.0
1970 8634 0.0 0.0 0.0
1971 8751 0.0 0.0 0.0
1972 6461 0.0 0.0 0.0
1973 8500 0.0 0.0 0.0
1974 8540 0.0 0.0 0.0
1975 8615 0.0 0.0 0.0
1976 8511 0.0 0.0 0.0
1977 8410 0.0 0.0 0.0
1978 5036 0.0 0.0 0.0
1979 6207 0.0 0.0 0.0
1980 8239 0.0 0.0 0.0
1981 1627 0.0 0.0 0.0
1983 4105 0.0 0.0 0.0
1984 8714 0.0 0.0 0.0
1985 8743 0.0 0.0 0.0
1986 8269 0.0 0.0 0.0
1987 5009 0.0 0.0 0.0
1988 5060 0.0 0.0 0.0
1989 8032 0.0 0.0 0.0
1990 4451 0.0 0.0 0.0
1991 7109 0.0 0.0 0.0
1992 4660 0.0 0.0 0.0
1993 6989 0.0 0.0 0.0
1994 6765 0.0 0.0 0.0
1995 8378 0.0 0.0 0.0
1996 8534 0.0 0.0 0.0
1997 8479 0.0 0.0 0.0
1998 8754 0.0 0.0 0.0
1999 8710 0.0 0.0 0.0
2000 8536 0.0 0.0 0.0
2001 8699 0.0 0.0 0.0
2002 8520 0.0 0.0 0.0
2003 8681 0.0 0.0 0.0
2004 8547 0.0 0.0 0.0
2005 8030 0.0 0.0 0.0
2006 8616 0.0 0.0 0.0
2007 7681 0.0 0.0 0.0
2008 8639 0.0 0.0 0.0
2009 8423 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7775 0.0 0.0 0.0
2019 384 0.0 0.0 0.0

For data sources see[5]

References