X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034070510000

Well Details

Well ID: 0034070510000
Loading map...
Location: 00/10-05-003-07W4/0
Location Alias: 00/10-05-03-07 W4M
Location Alias 2: 00/10-05-003-07 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 07
Section: 05
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 10-5-3-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0012344
License Date: 1956-09-24
License Status: Suspension
Spud Date: 1956-12-06
Final Drill Date: 1956-12-13
Well Total Depth: 722.40 m
Surface Hole Latitude: 49.182200
Surface Hole Longitude: -110.909602

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-09-24 Obtained License
1956-12-13 Drill Stem Test Performed
1956-12-13 Finished Drilling
1956-12-13 Well Mode changed to Drilled and Cased
1956-12-14 Well Log Performed
1956-12-17 Drill Stem Test Performed
1956-12-17 Production Casing Operation Performed
1957-07-17 Perforation Treatment Performed - Bullet Perforation
1957-11-11 Well Began Production
1957-11-11 Well Fluid changed to Gas
1957-11-11 Well Mode changed to Flowing
1958-10-08 Perforation Treatment Performed - Cement Squeeze
1958-10-10 Perforation Treatment Performed - Bullet Perforation
1959-09-24 Perforation Treatment Performed - Cement Squeeze
1959-09-24 Well Fluid changed to Gas
1959-09-24 Well Mode changed to Abandoned Zone
1959-09-26 Perforation Treatment Performed - Bullet Perforation
1959-09-29 Perforation Treatment Performed - Fractured
1961-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-02-28 Perforation Treatment Performed - Jet Perforation
2007-02-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-07-17 Bullet Perforation 624.20 625.10 26
1958-10-08 Cement Squeeze 624.20 625.10 0
1958-10-10 Bullet Perforation 623.60 624.50 26
1959-09-24 Cement Squeeze 623.60 624.50 0
1959-09-26 Bullet Perforation 653.20 655.60 10
1959-09-29 Fracture 653.20 655.60 0
1961-10-13 Acid Treatment 653.20 655.60 0
2007-02-28 Perforation 639.00 643.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References