X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024200214000

Well Details

Well ID: 0024200214000
Loading map...
Location: 00/14-02-002-20W4/0
Location Alias: 00/14-02-02-20 W4M
Location Alias 2: 00/14-02-002-20 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 20
Section: 02
County/Municipality: Cardston County
Well Name: GRYPHON HZ REAGAN 14-2-2-20
Operator Name: Gryphon Petroleum Corp.
License Number: 0471298
License Date: 2014-11-12
License Status: Amended
Spud Date: 2014-11-30
Final Drill Date: 2014-12-12
Well Total Depth: 2790.00 m
Surface Hole Latitude: 49.083841
Surface Hole Longitude: -112.580793

For data sources see[1][2]

Well History

Date Event
2014-11-12 Obtained License
2014-12-01 Surface Casing Operation Performed
2014-12-02 Direction Drilling Operation Performed - Deviate
2014-12-04 Direction Drilling Operation Performed - Horizontal
2014-12-07 Production Casing Operation Performed
2014-12-12 Finished Drilling
2014-12-12 Well Mode changed to Drilled and Cased
2014-12-13 Well Log Performed
2014-12-14 Perforation Treatment Performed - Open-Hole Completion
2014-12-14 Rig Released
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Drilling and Completing
2015-05-01 Well Began Production
2015-05-01 Well Fluid changed to Crude Oil
2015-05-01 Well Mode changed to Pumping
2019-11-04 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-30 Bonanza Drilling Inc. FOUR N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-02 514.00 Deviate (5 - 79 degrees)
2014-12-04 1334.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-14 Open Hole/Barefoot Completion 1411.00 2790.00 0
2019-11-04 Bridge Plug, No Cement 1575.00 1575.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5671 0.0 0.0 0.0
2016 8194 0.0 0.0 0.0
2017 7007 0.0 0.0 0.0
2018 7314 0.0 0.0 0.0
2019 5701 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 No Incident Encountered 0.00 0.00
2015-02-11 No Incident Encountered 0.00 0.00
2019-11-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References