X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024121403022

Well Details

Well ID: 0024121403022
Loading map...
Location: 02/03-14-002-12W4/2
Location Alias: 02/03-14-02-12 W4M
Location Alias 2: 02/03-14-002-12 W4/02
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 12
Section: 14
County/Municipality: County of Warner No. 5
Well Name: CNRL 102 PHILP 3-14-2-12
Operator Name: Canadian Natural Resources Limited
License Number: 0318207
License Date: 2004-11-03
License Status: Issued
Spud Date: 2004-11-10
Final Drill Date: 2004-11-12
Well Total Depth: 822.00 m
Surface Hole Latitude: 49.116572
Surface Hole Longitude: -111.510348

For data sources see[1][2]

Well History

Date Event
2004-11-03 Obtained License
2004-11-11 Surface Casing Operation Performed
2004-11-12 Direction Drilling Operation Performed - Deviate
2004-11-12 Finished Drilling
2004-11-12 Well Mode changed to Drilled and Cased
2004-11-13 Production Casing Operation Performed
2004-11-13 Rig Released
2004-11-13 Well Log Performed
2004-11-22 Perforation Treatment Performed - Jet Perforation
2004-11-22 Well Log Performed
2005-03-03 Well Log Performed
2005-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-04 Perforation Treatment Performed - Jet Perforation
2005-03-04 Plug Back Performed
2005-03-08 Perforation Treatment Performed - Fractured
2005-03-12 Perforation Treatment Performed - Jet Perforation
2005-03-15 Perforation Treatment Performed - Fractured
2009-06-02 Well Began Production
2009-06-02 Well Fluid changed to Gas
2009-06-02 Well Mode changed to Flowing
2019-06-01 Well Fluid changed to Gas
2019-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-11-12 266.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-22 Perforation 789.50 790.50 13
2005-03-04 Packing Device Capped w/Cement 777.00 785.00 0
2005-03-04 Perforation 375.50 377.50 17
2005-03-04 Perforation 381.00 382.00 17
2005-03-08 Fracture 375.50 382.00 0
2005-03-12 Perforation 194.00 196.00 17
2005-03-12 Perforation 268.50 270.50 17
2005-03-15 Fracture 194.00 270.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5086 0.0 0.0 0.0
2010 8700 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8757 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8725 0.0 0.0 0.0
2016 8781 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 744 0.0 0.0 0.0

For data sources see[6]

References