X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014283114000

Well Details

Well ID: 0014283114000
Loading map...
Location: 00/14-31-001-28W4/0
Location Alias: 00/14-31-01-28 W4M
Location Alias 2: 00/14-31-001-28 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 28
Section: 31
County/Municipality: Cardston County
Well Name: LOYAL ENERGY LOOKOUT 14-31-1-28
Operator Name: Loyal Energy (canada) Operating Ltd.
License Number: 0016716
License Date: 1959-02-12
License Status: Issued
Spud Date: 1959-03-17
Final Drill Date: 1959-09-10
Well Total Depth: 3855.10 m
Surface Hole Latitude: 49.082584
Surface Hole Longitude: -113.735000

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-12 Obtained License
1959-05-16 Drill Stem Test Performed
1959-05-17 Drill Stem Test Performed
1959-07-27 Drill Stem Test Performed
1959-07-30 Drill Stem Test Performed
1959-08-02 Drill Stem Test Performed
1959-08-06 Drill Stem Test Performed
1959-08-10 Drill Stem Test Performed
1959-08-15 Drill Stem Test Performed
1959-08-23 Drill Stem Test Performed
1959-09-06 Drill Stem Test Performed
1959-09-10 Finished Drilling
1959-09-11 Drill Stem Test Performed
1959-09-21 Perforation Treatment Performed - Open-Hole Completion
1959-09-21 Production Casing Operation Performed
1959-10-10 Perforation Treatment Performed - Jet Perforation
1959-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-25 Perforation Treatment Performed - Jet Perforation
1959-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-11-09 Perforation Treatment Performed - Jet Perforation
1959-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-19 Perforation Treatment Performed - Jet Perforation
1959-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-15 Perforation Treatment Performed - Condensate Squeeze
1959-12-18 Perforation Treatment Performed - Acid Wash - No Pressure
1959-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-06-14 Well Mode changed to Drilled and Cased
1963-08-21 Well Began Production
1963-08-21 Well Fluid changed to Gas
1963-08-21 Well Mode changed to Flowing
1971-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-12 Perforation Treatment Performed - Jet Perforation
1976-12-31 Well Fluid changed to Gas
1976-12-31 Well Mode changed to Suspended
1992-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-17 Plug Back Performed
2006-07-17 Well Fluid changed to Gas
2006-07-17 Well Mode changed to Abandoned Zone
2006-08-05 Perforation Treatment Performed - Jet Perforation
2006-10-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-21 Open Hole/Barefoot Completion 3770.40 3855.10 0
1959-11-09 Perforation 3689.30 3714.90 13
1959-11-14 Acid Treatment 3689.30 3714.90 0
1959-11-15 Acid Treatment 3689.30 3714.90 0
1959-11-19 Acid Treatment 3689.30 3714.90 0
1959-11-19 Perforation 3668.30 3681.70 13
1959-11-23 Acid Treatment 3668.30 3681.70 0
1959-12-15 Condensate Squeeze 3668.30 3681.70 0
1959-12-18 Acid Wash 3668.30 3681.70 0
1959-12-20 Acid Treatment 3668.30 3681.70 0
1971-10-21 Acid Treatment 3689.30 3714.90 0
1959-10-10 Perforation 3781.30 3804.20 7
1971-10-27 Acid Treatment 3668.30 3681.70 0
1973-07-12 Perforation 3689.30 3714.90 13
1992-02-05 Acid Treatment 3668.30 3714.90 0
2006-07-17 Packing Device Capped w/Cement 3635.00 3643.00 0
2006-08-05 Perforation 3322.50 3328.50 17
2006-10-06 Fracture 3322.50 3328.50 0
1959-10-17 Acid Treatment 3781.30 3804.20 0
1959-10-19 Acid Treatment 3781.30 3804.20 0
1959-10-25 Perforation 3742.90 3753.60 13
1959-10-25 Perforation 3719.80 3738.70 13
1959-10-31 Acid Treatment 3719.80 3753.60 0
1959-11-01 Acid Treatment 3719.80 3753.60 0
1959-11-09 Packing Device Capped w/Cement 3716.70 3718.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 8097 0.0 0.0 0.0
1971 6009 0.0 0.0 0.0
1972 7547 0.0 0.0 0.0
1973 8160 0.0 0.0 0.0
1974 8308 0.0 0.0 0.0
1975 8382 0.0 0.0 0.0
1976 7199 0.0 0.0 0.0

For data sources see[5]

References