X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014251801004

Well Details

Well ID: 0014251801004
Loading map...
Location: 00/01-18-001-25W4/4
Location Alias: 00/01-18-01-25 W4M
Location Alias 2: 00/01-18-001-25 W4/04
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 25
Section: 18
County/Municipality: Cardston County
Well Name: STARCHILD AETNA 1-18-1-25
Operator Name: Starchild Energy Systems Ltd.
License Number: 0309095
License Date: 2004-05-26
License Status: RecCertified
Spud Date: 2005-06-06
Final Drill Date: 2007-08-26
Well Total Depth: 3411.60 m
Surface Hole Latitude: 49.031066
Surface Hole Longitude: -113.328040

For data sources see[1][2]

Well History

Date Event
2004-05-26 Obtained License
2007-08-21 Well Log Performed
2007-08-26 Finished Drilling
2007-08-26 Perforation Treatment Performed - Open-Hole Completion
2007-08-26 Rig Released
2007-08-26 Well Mode changed to Drilled and Cased
2007-09-26 Well Log Performed
2007-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-10 Perforation Treatment Performed - Cement Plug
2007-10-10 Plug Back Performed
2007-10-12 Perforation Treatment Performed - Jet Perforation
2007-10-13 Perforation Treatment Performed - Jet Perforation
2007-10-16 Perforation Treatment Performed - Jet Perforation
2007-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-20 Perforation Treatment Performed - Jet Perforation
2007-10-21 Perforation Treatment Performed - Jet Perforation
2007-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-27 Plug Back Performed
2007-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-28 Plug Back Performed
2007-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-29 Plug Back Performed
2007-10-30 Perforation Treatment Performed - Jet Perforation
2007-10-31 Perforation Treatment Performed - Jet Perforation
2007-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-15 Perforation Treatment Performed - Jet Perforation
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-12-05 Perforation Treatment Performed - Fractured
2008-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-17 Plug Back Performed
2008-04-17 Well Mode changed to Abandoned Zone
2008-04-19 Perforation Treatment Performed - Jet Perforation
2008-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-02 Plug Back Performed
2009-02-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-08-26 Open Hole/Barefoot Completion 3293.00 3411.60 0
2007-10-16 Perforation 3188.00 3189.00 13
2007-10-16 Perforation 3185.50 3186.50 13
2007-10-16 Perforation 3177.50 3180.00 13
2007-10-18 Acid Treatment 3177.50 3198.50 0
2007-10-20 Perforation 3062.50 3068.50 13
2007-10-20 Perforation 3054.00 3058.00 13
2007-10-21 Perforation 3010.00 3016.00 13
2007-10-21 Perforation 2979.00 2981.00 13
2007-10-21 Perforation 2977.00 2978.00 13
2007-10-21 Perforation 2975.30 2975.80 13
2007-10-02 Acid Treatment 3293.00 3411.60 0
2007-10-22 Acid Treatment 2975.30 3016.00 0
2007-10-27 Packing Device Capped w/Cement 3163.00 3171.00 0
2007-10-28 Packing Device Capped w/Cement 3038.00 3046.00 0
2007-10-29 Packing Device Capped w/Cement 2962.00 2970.00 0
2007-10-30 Perforation 2927.50 2933.50 13
2007-10-31 Perforation 2912.50 2915.00 13
2007-10-31 Perforation 2907.00 2909.00 13
2007-10-31 Perforation 2900.50 2906.50 13
2007-11-01 Acid Treatment 2900.50 2906.50 0
2007-11-01 Acid Treatment 2907.00 2915.00 0
2007-10-10 Cement Plug 3273.40 3411.60 0
2007-11-01 Acid Treatment 2927.50 2933.50 0
2007-11-15 Perforation 2946.00 2949.50 13
2007-11-15 Perforation 2941.00 2943.50 13
2007-11-26 Perforation 2892.80 2893.30 17
2007-11-26 Perforation 2885.50 2888.80 17
2007-12-05 Fracture 2885.50 2893.30 0
2008-04-17 Packing Device Capped w/Cement 2825.00 2833.00 0
2008-04-19 Perforation 2506.50 2512.50 17
2008-09-02 Packing Device Capped w/Cement 2492.00 2500.00 0
2007-10-12 Perforation 3230.00 3236.00 13
2007-10-13 Perforation 3210.00 3216.00 13
2007-10-16 Perforation 3197.50 3198.50 13
2007-10-16 Perforation 3195.00 3196.50 13
2007-10-16 Perforation 3193.00 3194.00 13
2007-10-16 Perforation 3190.50 3191.50 13

For data sources see[4]



References