X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014210515000

Well Details

Well ID: 0014210515000
Loading map...
Location: 00/15-05-001-21W4/0
Location Alias: 00/15-05-01-21 W4M
Location Alias 2: 00/15-05-001-21 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 21
Section: 05
County/Municipality: Cardston County
Well Name: NATIONAL DEL BONITA #3
Operator Name: National Petroleum Corporation Limited
License Number: 0006878
License Date: 1953-08-06
License Status: RecCertified
Spud Date: 1953-08-21
Final Drill Date: 1953-11-02
Well Total Depth: 1938.50 m
Surface Hole Latitude: 49.011993
Surface Hole Longitude: -112.774451

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-06 Obtained License
1953-10-11 Drill Stem Test Performed
1953-10-21 Drill Stem Test Performed
1953-10-27 Drill Stem Test Performed
1953-11-01 Liner Casing Operation Performed
1953-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-01 Perforation Treatment Performed - Acid Wash - No Pressure
1953-11-01 Perforation Treatment Performed - Open-Hole Completion
1953-11-02 Finished Drilling
1953-11-30 Perforation Treatment Performed - Cement Plug
1953-12-01 Perforation Treatment Performed - Acid Wash - No Pressure
1953-12-01 Perforation Treatment Performed - Bullet Perforation
1953-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-12-03 Perforation Treatment Performed - Cement Plug
1953-12-05 Perforation Treatment Performed - Bullet Perforation
1953-12-06 Perforation Treatment Performed - Acid Wash - No Pressure
1953-12-18 Well Mode changed to Drilled and Cased
1954-03-10 Well Began Production
1954-03-10 Well Fluid changed to Crude Oil
1954-03-10 Well Mode changed to Flowing
1956-04-19 Well Fluid changed to Crude Oil
1956-04-19 Well Mode changed to Pumping
1971-12-08 Well Fluid changed to Crude Oil
1971-12-08 Well Mode changed to Suspended
1997-06-20 Well Fluid changed to Crude Oil
1997-06-20 Well Mode changed to Closed
2001-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-03 Perforation Treatment Performed - Jet Perforation
2001-02-04 Perforation Treatment Performed - Remedial Casing
2001-02-06 Well Abandoned
2001-02-06 Well Fluid changed to Crude Oil
2001-02-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-01 Open Hole/Barefoot Completion 1877.60 1938.50 0
1953-12-05 Bullet Perforation 1578.90 1583.10 13
1953-12-05 Bullet Perforation 1583.10 1584.70 20
1953-12-06 Acid Wash 1578.90 1584.70 0
2001-02-03 Packing Device Capped w/Cement 1559.00 1567.00 0
2001-02-03 Perforation 300.00 301.00 13
2001-02-04 Remedial Casing Cementing 300.00 301.00 0
1953-11-01 Acid Treatment 1932.40 1938.50 0
1953-11-01 Acid Wash 1877.60 1877.60 0
1953-11-01 Acid Treatment 1877.60 1932.40 0
1953-11-30 Cement Plug 1876.00 1883.70 0
1953-12-01 Bullet Perforation 1859.90 1873.90 3
1953-12-01 Acid Wash 1859.90 1873.90 0
1953-12-02 Acid Treatment 1859.30 1873.90 0
1953-12-03 Cement Plug 1664.20 1883.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 696 0.0 0.0 0.0
1970 840 0.0 0.0 0.0

For data sources see[5]

References