If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014170911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.022378,"lon":-112.223613,"icon":""}]} |
Location: 00/11-09-001-17W4/0 | |
Location Alias: 00/11-09-01-17 W4M | |
Location Alias 2: 00/11-09-001-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 17 | |
Section: 09 | |
County/Municipality: County of Warner No. 5 | |
Well Name: CPEC COUTTS 11-9-1-17 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0420325 | |
License Date: 2010-05-10 | |
License Status: Issued | |
Spud Date: 2010-05-25 | |
Final Drill Date: 2010-06-16 | |
Well Total Depth: 937.20 m | |
Surface Hole Latitude: 49.022378 | |
Surface Hole Longitude: -112.223613 |
Date | Event |
---|---|
2010-05-10 | Obtained License |
2010-05-26 | Surface Casing Operation Performed |
2010-06-06 | Well Mode changed to Drilled and Cased |
2010-06-07 | Production Casing Operation Performed |
2010-06-07 | Rig Released |
2010-06-16 | Finished Drilling |
2010-06-16 | Perforation Treatment Performed - Open-Hole Completion |
2010-06-16 | Well Log Performed |
2010-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-06-18 | Well Log Performed |
2010-06-26 | Well Began Production |
2010-06-26 | Well Fluid changed to Crude Oil |
2010-06-26 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-06-16 | Open Hole/Barefoot Completion | 923.70 | 937.20 | 0 |
2010-06-17 | Acid Treatment | 923.70 | 937.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 4381 | 0.0 | 0.0 | 0.0 |
2011 | 8609 | 0.0 | 0.0 | 0.0 |
2012 | 8554 | 0.0 | 0.0 | 0.0 |
2013 | 8577 | 0.0 | 0.0 | 0.0 |
2014 | 8661 | 0.0 | 0.0 | 0.0 |
2015 | 8663 | 0.0 | 0.0 | 0.0 |
2016 | 7724 | 0.0 | 0.0 | 0.0 |
2017 | 6982 | 0.0 | 0.0 | 0.0 |
2018 | 5956 | 0.0 | 0.0 | 0.0 |
2019 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]