X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014161515000

Well Details

Well ID: 0014161515000
Loading map...
Location: 00/15-15-001-16W4/0
Location Alias: 00/15-15-01-16 W4M
Location Alias 2: 00/15-15-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 15
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 15-15-1-16
Operator Name: Crescent Point Energy Corp.
License Number: 0061061
License Date: 1976-11-09
License Status: Abandoned
Spud Date: 1976-12-05
Final Drill Date: 1976-12-09
Well Total Depth: 783.30 m
Surface Hole Latitude: 49.040666
Surface Hole Longitude: -112.062081

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-09 Obtained License
1976-12-09 Finished Drilling
1976-12-09 Well Mode changed to Drilled and Cased
1976-12-10 Drill Stem Test Performed
1976-12-11 Production Casing Operation Performed
1976-12-18 Perforation Treatment Performed - Jet Perforation
1976-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-29 Perforation Treatment Performed - Fractured
1977-02-11 Well Began Production
1977-02-11 Well Fluid changed to Crude Oil
1977-02-11 Well Mode changed to Pumping
1977-10-31 Well Fluid changed to Crude Oil
1977-10-31 Well Mode changed to Suspended
1978-05-04 Well Fluid changed to Crude Oil
1978-05-04 Well Mode changed to Pumping
1980-12-31 Well Fluid changed to Crude Oil
1980-12-31 Well Mode changed to Suspended
1999-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-07 Plug Back Performed
1999-05-07 Well Fluid changed to Crude Oil
1999-05-07 Well Mode changed to Abandoned Zone
1999-05-26 Well Abandoned
1999-05-26 Well Fluid changed to Crude Oil
1999-05-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-18 Perforation 755.90 759.00 7
1976-12-18 Perforation 759.60 760.80 7
1976-12-18 Perforation 763.80 764.40 7
1976-12-21 Acid Treatment 755.90 764.40 0
1976-12-29 Fracture 755.90 764.40 0
1999-05-07 Packing Device Capped w/Cement 735.00 743.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4017 0.0 0.0 0.0
1978 2467 0.0 0.0 0.0
1979 1632 0.0 0.0 0.0

For data sources see[5]

References