X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014091910000

Well Details

Well ID: 0014091910000
Loading map...
Location: 00/10-19-001-09W4/0
Location Alias: 00/10-19-01-09 W4M
Location Alias 2: 00/10-19-001-09 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 19
County/Municipality: County of Forty Mile No. 8
Well Name: ECA LAIT 10-19-1-9
Operator Name: Cenovus Energy Inc.
License Number: 0036991
License Date: 1969-10-08
License Status: Abandoned
Spud Date: 1969-11-28
Final Drill Date: 1969-12-03
Well Total Depth: 929.60 m
Surface Hole Latitude: 49.053313
Surface Hole Longitude: -111.192141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-10-08 Obtained License
1969-12-02 Drill Stem Test Performed
1969-12-03 Drill Stem Test Performed
1969-12-03 Finished Drilling
1969-12-03 Well Mode changed to Drilled and Cased
1969-12-04 Production Casing Operation Performed
1969-12-08 Perforation Treatment Performed - Bullet Perforation
1970-02-03 Well Began Production
1970-02-03 Well Fluid changed to Gas
1970-02-03 Well Mode changed to Flowing
1979-09-10 Well Fluid changed to Gas
1979-09-10 Well Mode changed to Suspended
1980-04-19 Well Fluid changed to Gas
1980-04-19 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-10-15 Well Fluid changed to Gas
1983-10-15 Well Mode changed to Flowing
1995-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-20 Perforation Treatment Performed - Jet Perforation
1995-09-20 Plug Back Performed
1995-09-20 Well Fluid changed to Gas
1995-09-20 Well Mode changed to Abandoned Zone
1995-10-07 Well Abandoned
1995-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-12-08 Bullet Perforation 859.50 861.40 10
1969-12-08 Bullet Perforation 863.20 864.40 10
1995-09-20 Packing Device Capped w/Cement 844.00 852.00 0
1995-09-20 Perforation 526.40 527.40 13
1995-09-20 Perforation 524.00 524.50 13
1995-09-20 Perforation 522.40 523.40 13
1995-09-20 Perforation 518.20 519.20 13
1995-09-20 Perforation 516.20 517.50 13
1995-10-08 Packing Device Capped w/Cement 502.00 510.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 6298 0.0 0.0 0.0
1971 6924 0.0 0.0 0.0
1972 4829 0.0 0.0 0.0
1973 7218 0.0 0.0 0.0
1974 7569 0.0 0.0 0.0
1975 3815 0.0 0.0 0.0
1976 335 0.0 0.0 0.0
1977 6457 0.0 0.0 0.0
1978 1961 0.0 0.0 0.0
1980 3628 0.0 0.0 0.0
1981 1585 0.0 0.0 0.0
1983 2104 0.0 0.0 0.0
1984 3774 0.0 0.0 0.0
1985 4008 0.0 0.0 0.0
1986 7934 0.0 0.0 0.0
1987 5331 0.0 0.0 0.0
1988 3437 0.0 0.0 0.0
1989 1019 0.0 0.0 0.0
1990 2605 0.0 0.0 0.0
1991 1039 0.0 0.0 0.0
1992 844 0.0 0.0 0.0

For data sources see[5]

References