If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014090411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.00831,"lon":-111.1555,"icon":""}]} |
Location: 00/11-04-001-09W4/0 | |
Location Alias: 00/11-04-01-09 W4M | |
Location Alias 2: 00/11-04-001-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 09 | |
Section: 04 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF ADEN 11-4-1-9 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0019797 | |
License Date: 1960-10-03 | |
License Status: Issued | |
Spud Date: 1960-10-20 | |
Final Drill Date: 1960-11-15 | |
Well Total Depth: 1029.60 m | |
Surface Hole Latitude: 49.008310 | |
Surface Hole Longitude: -111.155500 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-10-03 | Obtained License |
1960-10-23 | Drill Stem Test Performed |
1960-10-25 | Drill Stem Test Performed |
1960-10-26 | Drill Stem Test Performed |
1960-10-27 | Lost Circulation Occurred |
1960-10-29 | Drill Stem Test Performed |
1960-10-31 | Drill Stem Test Performed |
1960-11-05 | Drill Stem Test Performed |
1960-11-06 | Drill Stem Test Performed |
1960-11-10 | Drill Stem Test Performed |
1960-11-15 | Drill Stem Test Performed |
1960-11-15 | Finished Drilling |
1960-11-16 | Production Casing Operation Performed |
1960-11-19 | Perforation Treatment Performed - Jet Perforation |
1960-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-12-12 | Well Mode changed to Drilled and Cased |
1961-10-04 | Perforation Treatment Performed - Jet Perforation |
1961-10-06 | Well Mode changed to Drilled and Cased |
1961-12-04 | Well Began Production |
1961-12-04 | Well Fluid changed to Gas |
1961-12-04 | Well Mode changed to Flowing |
1962-09-14 | Perforation Treatment Performed - Cement Squeeze |
1962-09-19 | Perforation Treatment Performed - Jet Perforation |
1981-12-31 | Well Fluid changed to Gas |
1981-12-31 | Well Mode changed to Suspended |
1987-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-02-03 | Plug Back Performed |
1987-02-03 | Well Fluid changed to Gas |
1987-02-03 | Well Mode changed to Abandoned Zone |
1987-02-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-02-04 | Perforation Treatment Performed - Jet Perforation |
1987-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-02-06 | Perforation Treatment Performed - Jet Perforation |
1987-02-06 | Plug Back Performed |
1987-02-07 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-11-19 | Perforation | 858.00 | 862.60 | 7 |
1987-02-04 | Perforation | 753.80 | 755.30 | 13 |
1987-02-06 | Packing Device Capped w/Cement | 737.00 | 745.00 | 0 |
1987-02-06 | Perforation | 680.30 | 685.80 | 13 |
1987-02-06 | Perforation | 677.90 | 679.10 | 13 |
1987-02-06 | Perforation | 674.20 | 676.00 | 13 |
1987-02-07 | Perforation | 655.30 | 657.50 | 13 |
1987-02-07 | Perforation | 651.70 | 653.20 | 13 |
1987-02-07 | Perforation | 643.30 | 644.60 | 13 |
1987-02-07 | Perforation | 634.60 | 636.40 | 13 |
1960-11-19 | Perforation | 868.70 | 871.70 | 7 |
1960-11-19 | Perforation | 880.90 | 885.40 | 7 |
1960-11-20 | Acid Treatment | 858.00 | 885.40 | 0 |
1961-10-04 | Perforation | 681.20 | 684.30 | 13 |
1962-09-14 | Cement Squeeze | 681.20 | 684.30 | 0 |
1962-09-19 | Perforation | 753.80 | 755.30 | 13 |
1987-02-03 | Packing Device Capped w/Cement | 822.00 | 830.00 | 0 |
1987-02-04 | Acid Wash | 753.80 | 755.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1463 | 0.0 | 0.0 | 0.0 |
1969 | 8389 | 0.0 | 0.0 | 0.0 |
1970 | 7877 | 0.0 | 0.0 | 0.0 |
1971 | 7672 | 0.0 | 0.0 | 0.0 |
1972 | 7800 | 0.0 | 0.0 | 0.0 |
1973 | 7713 | 0.0 | 0.0 | 0.0 |
1974 | 6244 | 0.0 | 0.0 | 0.0 |
1975 | 7005 | 0.0 | 0.0 | 0.0 |
1976 | 1480 | 0.0 | 0.0 | 0.0 |
1977 | 5564 | 0.0 | 0.0 | 0.0 |
1978 | 4416 | 0.0 | 0.0 | 0.0 |
1979 | 5990 | 0.0 | 0.0 | 0.0 |
1980 | 7530 | 0.0 | 0.0 | 0.0 |
1981 | 3384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1960-10-27 | Lost Circulation | 832.10 | 972.30 |
For data sources see[6]