X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014082511000

Well Details

Well ID: 0014082511000
Loading map...
Location: 00/11-25-001-08W4/0
Location Alias: 00/11-25-01-08 W4M
Location Alias 2: 00/11-25-001-08 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 25
County/Municipality: County of Forty Mile No. 8
Well Name: CVE COMREY 11-25-1-8
Operator Name: Cenovus Energy Inc.
License Number: 0050509
License Date: 1974-07-18
License Status: Abandoned
Spud Date: 1974-07-22
Final Drill Date: 1974-07-28
Well Total Depth: 1058.30 m
Surface Hole Latitude: 49.067058
Surface Hole Longitude: -110.955165

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-07-18 Obtained License
1974-07-24 Drill Stem Test Performed
1974-07-25 Drill Stem Test Performed
1974-07-28 Drill Stem Test Performed
1974-07-28 Finished Drilling
1974-07-29 Drill Stem Test Performed
1974-07-30 Production Casing Operation Performed
1974-08-07 Perforation Treatment Performed - Jet Perforation
1975-02-28 Well Mode changed to Drilled and Cased
1975-07-24 Well Began Production
1975-07-24 Well Fluid changed to Gas
1975-07-24 Well Mode changed to Flowing
1977-06-26 Perforation Treatment Performed - Cement Squeeze
1977-06-28 Perforation Treatment Performed - Jet Perforation
1977-06-29 Perforation Treatment Performed - Jet Perforation
1977-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-06-30 Perforation Treatment Performed - Jet Perforation
1977-06-30 Well Fluid changed to Gas
1977-06-30 Well Mode changed to Abandoned Zone
1998-09-04 Well Log Performed
1998-09-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-07 Perforation 1030.80 1031.40 7
1977-06-26 Cement Squeeze 1030.80 1031.40 0
1977-06-28 Perforation 1030.20 1030.20 7
1977-06-29 Perforation 1030.50 1030.80 7
1977-06-30 Packing Device Capped w/Cement 983.00 983.00 0
1977-06-30 Perforation 690.40 691.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2369 0.0 0.0 0.0
1976 1521 0.0 0.0 0.0

For data sources see[5]

References