X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014081901003

Well Details

Well ID: 0014081901003
Loading map...
Location: 00/01-19-001-08W4/3
Location Alias: 00/01-19-01-08 W4M
Location Alias 2: 00/01-19-001-08 W4/03
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 19
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 1-19-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0097808
License Date: 1982-10-07
License Status: Issued
Spud Date: 1982-10-21
Final Drill Date: 1982-10-24
Well Total Depth: 1009.00 m
Surface Hole Latitude: 49.046151
Surface Hole Longitude: -111.057330

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-07 Obtained License
1982-10-24 Finished Drilling
1982-10-24 Well Mode changed to Drilled and Cased
1982-10-25 Drill Stem Test Performed
1982-10-27 Production Casing Operation Performed
1982-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-09 Perforation Treatment Performed - Jet Perforation
1982-11-11 Perforation Treatment Performed - Jet Perforation
1982-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-29 Perforation Treatment Performed - Jet Perforation
1985-04-29 Plug Back Performed
1985-04-30 Perforation Treatment Performed - Jet Perforation
1986-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-21 Perforation Treatment Performed - Jet Perforation
1986-10-21 Plug Back Performed
1987-02-03 Well Began Production
1987-02-03 Well Fluid changed to Gas
1987-02-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-09 Perforation 1007.00 1009.00 14
1982-11-09 Acid Treatment 1007.00 1009.00 0
1982-11-11 Perforation 999.80 1001.30 14
1982-11-12 Acid Treatment 999.80 1001.30 0
1985-04-29 Packing Device Capped w/Cement 987.00 995.00 0
1985-04-29 Perforation 693.00 693.70 13
1985-04-30 Perforation 663.00 663.70 0
1986-10-21 Packing Device Capped w/Cement 647.00 655.00 0
1986-10-21 Perforation 571.50 574.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4964 0.0 0.0 0.0
1988 4707 0.0 0.0 0.0
1989 7955 0.0 0.0 0.0
1990 7891 0.0 0.0 0.0
1991 8230 0.0 0.0 0.0
1992 6890 0.0 0.0 0.0
1993 8440 0.0 0.0 0.0
1994 6771 0.0 0.0 0.0
1995 8393 0.0 0.0 0.0
1996 7834 0.0 0.0 0.0
1997 8382 0.0 0.0 0.0
1998 8722 0.0 0.0 0.0
1999 8758 0.0 0.0 0.0
2000 8692 0.0 0.0 0.0
2001 8628 0.0 0.0 0.0
2002 7996 0.0 0.0 0.0
2003 8538 0.0 0.0 0.0
2004 8430 0.0 0.0 0.0
2005 8451 0.0 0.0 0.0
2006 8537 0.0 0.0 0.0
2007 8514 0.0 0.0 0.0
2008 8639 0.0 0.0 0.0
2009 8371 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8027 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References