X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014081711002

Well Details

Well ID: 0014081711002
Loading map...
Location: 00/11-17-001-08W4/2
Location Alias: 00/11-17-01-08 W4M
Location Alias 2: 00/11-17-001-08 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 11-17-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0018909
License Date: 1960-04-06
License Status: Issued
Spud Date: 1960-04-17
Final Drill Date: 1960-04-21
Well Total Depth: 810.80 m
Surface Hole Latitude: 49.037832
Surface Hole Longitude: -111.044022

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-04-06 Obtained License
1960-04-21 Finished Drilling
1960-04-23 Production Casing Operation Performed
1960-05-22 Drill Stem Test Performed
1960-07-29 Perforation Treatment Performed - Jet Perforation
1960-07-31 Perforation Treatment Performed - Jet Perforation
1960-07-31 Well Mode changed to Drilled and Cased
1960-10-05 Well Began Production
1960-10-05 Well Fluid changed to Gas
1960-10-05 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
2002-08-19 Perforation Treatment Performed - Jet Perforation
2002-08-20 Well Log Performed
2003-09-01 Well Fluid changed to Gas
2003-09-01 Well Mode changed to Suspended
2008-08-01 Well Fluid changed to Gas
2008-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-29 Perforation 670.30 671.80 13
1960-07-29 Perforation 648.60 650.10 13
1960-07-31 Perforation 765.00 766.60 13
1960-07-31 Perforation 772.40 773.90 13
2002-08-19 Perforation 772.40 775.40 14
2002-08-19 Perforation 764.70 768.70 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1460 0.0 0.0 0.0
1969 7647 0.0 0.0 0.0
1970 6907 0.0 0.0 0.0
1971 6921 0.0 0.0 0.0
1972 8687 0.0 0.0 0.0
1973 7670 0.0 0.0 0.0
1974 7283 0.0 0.0 0.0
1975 4143 0.0 0.0 0.0
1976 5851 0.0 0.0 0.0
1977 7663 0.0 0.0 0.0
1978 3758 0.0 0.0 0.0
1979 8557 0.0 0.0 0.0
1980 5215 0.0 0.0 0.0
1981 2825 0.0 0.0 0.0
1983 1028 0.0 0.0 0.0
1984 8563 0.0 0.0 0.0
1985 8451 0.0 0.0 0.0
1986 8097 0.0 0.0 0.0
1987 5879 0.0 0.0 0.0
1988 4624 0.0 0.0 0.0
1989 7856 0.0 0.0 0.0
1990 7835 0.0 0.0 0.0
1991 8014 0.0 0.0 0.0
1992 6477 0.0 0.0 0.0
1993 8081 0.0 0.0 0.0
1994 6357 0.0 0.0 0.0
1995 8333 0.0 0.0 0.0
1996 7559 0.0 0.0 0.0
1997 8186 0.0 0.0 0.0
1998 8715 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8706 0.0 0.0 0.0
2001 8753 0.0 0.0 0.0
2002 5472 0.0 0.0 0.0
2008 2185 0.0 0.0 0.0
2009 5495 0.0 0.0 0.0
2010 7799 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 6779 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References