X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014063205003

Well Details

Well ID: 0014063205003
Loading map...
Location: 00/05-32-001-06W4/3
Location Alias: 00/05-32-01-06 W4M
Location Alias 2: 00/05-32-001-06 W4/03
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 06
Section: 32
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF COMREY 5-32-1-6
Operator Name: Pine Cliff Energy Ltd.
License Number: 0262321
License Date: 2001-11-22
License Status: Issued
Spud Date: 2002-01-10
Final Drill Date: 2002-01-13
Well Total Depth: 1066.00 m
Surface Hole Latitude: 49.079643
Surface Hole Longitude: -110.779288

For data sources see[1][2]

Well History

Date Event
2001-11-22 Obtained License
2002-01-11 Direction Drilling Operation Performed - Deviate
2002-01-11 Surface Casing Operation Performed
2002-01-13 Finished Drilling
2002-01-13 Production Casing Operation Performed
2002-01-13 Rig Released
2002-01-13 Well Log Performed
2002-01-13 Well Mode changed to Drilled and Cased
2002-01-20 Well Log Performed
2002-01-23 Perforation Treatment Performed - Jet Perforation
2002-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-30 Perforation Treatment Performed - Jet Perforation
2002-01-30 Plug Back Performed
2002-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-09 Perforation Treatment Performed - Jet Perforation
2002-02-09 Plug Back Performed
2002-02-13 Perforation Treatment Performed - Fractured
2002-05-17 Well Began Production
2002-05-17 Well Fluid changed to Gas
2002-05-17 Well Mode changed to Flowing
2005-06-24 Perforation Treatment Performed - Jet Perforation
2005-06-24 Well Log Performed
2005-07-09 Perforation Treatment Performed - Fractured
2005-07-14 Perforation Treatment Performed - Jet Perforation
2005-07-14 Well Log Performed
2005-07-20 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-01-11 458.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-23 Perforation 770.00 771.00 13
2005-07-20 Fracture 427.00 430.00 0
2002-01-30 Packing Device Capped w/Cement 764.00 767.00 0
2002-01-30 Perforation 743.00 744.00 13
2002-02-09 Packing Device Capped w/Cement 733.00 741.00 0
2002-02-09 Perforation 626.00 629.00 13
2002-02-13 Fracture 626.00 629.00 0
2005-06-24 Perforation 463.00 466.00 14
2005-07-09 Fracture 463.00 466.00 0
2005-07-14 Perforation 427.00 430.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5409 0.0 0.0 0.0
2003 8626 0.0 0.0 0.0
2004 8080 0.0 0.0 0.0
2005 8338 0.0 0.0 0.0
2006 8666 0.0 0.0 0.0
2007 8435 0.0 0.0 0.0
2008 8447 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References