X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834071302060

Well Details

Well ID: 0834071302060
Loading map...
Location: 06/02-13-083-07W4/0
Location Alias: 06/02-13-83-07 W4M
Location Alias 2: 06/02-13-083-07 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 07
Section: 13
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC 101I18 HZ RESDELN 2-13-83-7
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0400010
License Date: 2008-08-22
License Status: Issued
Spud Date: 2008-09-21
Final Drill Date: 2009-03-05
Well Total Depth: 1752.00 m
Surface Hole Latitude: 56.197204
Surface Hole Longitude: -110.977625

For data sources see[1][2]

Well History

Date Event
2008-08-22 Obtained License
2008-09-21 Surface Casing Operation Performed
2009-02-22 Direction Drilling Operation Performed - Horizontal
2009-02-22 Well Log Performed
2009-02-24 Well Log Performed
2009-02-25 Intermediate Casing Operation Performed
2009-03-05 Finished Drilling
2009-03-05 Well Log Performed
2009-03-05 Well Mode changed to Drilled and Cased
2009-03-06 Liner Casing Operation Performed
2009-03-06 Perforation Treatment Performed - Open-Hole Completion
2009-03-06 Perforation Treatment Performed - Slotted Liner or Casing
2009-03-06 Rig Released
2009-03-29 Well Log Performed
2010-12-03 Perforation Treatment Performed - Jet Perforation
2010-12-05 Perforation Treatment Performed - Remedial Casing
2010-12-06 Perforation Treatment Performed - Jet Perforation
2010-12-09 Perforation Treatment Performed - Jet Perforation
2010-12-09 Perforation Treatment Performed - Remedial Casing
2011-01-19 Perforation Treatment Performed - Remedial Casing
2011-01-26 Well Log Performed
2011-02-12 Well Log Performed
2011-03-08 Well Log Performed
2011-03-19 Well Log Performed
2011-03-20 Well Log Performed
2015-09-26 Well Began Production
2015-09-26 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-22 168.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-06 Slotted Liner 889.30 1748.00 0
2009-03-06 Open Hole/Barefoot Completion 1748.00 1752.00 0
2010-12-03 Perforation 298.00 300.00 17
2010-12-05 Remedial Casing Cementing 298.00 300.00 0
2010-12-06 Perforation 194.00 196.00 17
2010-12-09 Perforation 165.00 167.00 17
2010-12-09 Remedial Casing Cementing 165.00 167.00 0
2011-01-19 Remedial Casing Cementing 194.00 196.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References