X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-005-21839

Well Details

Well ID: 34-005-21839
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Perry Township
Operator Name: DEEP RESOURCES LLC
Well Pad ID:
Farm/Lease Name: HASTINGS H & G
License Status: Active Injection
License Date: 1976-02-05
Spud Date: 1976-06-10
Spud Drilling Contractor: SHORTS DRLG
Final Drill Date: 1976-06-24
Well Total Depth: 686 ft
Configuration: Vertical
Latitude: 40.895754720
Longitude: -82.15006753

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-02-05 133 QUAKER STATE OIL REF CORP GeoDate 2/5/76
Enhanced Recovery 1976-02-05 Issued Date 2/5/76 Expired Date 2/4/77 Acres 0090000 Tool Type RTAF Proposed Formation BEDFORD Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1976-06-10 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Completed 1976-06-24 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Reached Total Depth 1976-06-24 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Construction Permit Expires 1977-02-04 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Completion Report Received 1977-03-04 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
CO 1995-10-18 182 BELDEN & BLAKE CO GeoDate 2/5/76
Annulus Pressure Monitoring Approved 1998-06-10 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Last Compliance Report 1999-10-05 R.I. & SEC. RECOV., RE-ISSUE 4-23-75
Change of Owner 2002-02-07 Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER
Change of Owner 2008-04-24 Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC
Record Last Modified 2017-02-15 R.I. & SEC. RECOV., RE-ISSUE 4-23-75

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-19 528 684 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 100 Qts 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 DEEP RESOURCES LLC 0 113 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 DEEP RESOURCES LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0018236587 2012-09-11 Enhanced Recovery Project No Violations Inspect Well. Site ok.
0168448924 2014-10-28 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0228760554 2004-11-17 Enhanced Recovery Project No Violations Injection pressure test.
0302362185 2007-05-22 Enhanced Recovery Project Violations Noted Injection and annulus pressure test. Remove oil from inside well box on water by 5-29-2007. Leak is repaired.
0347117278 2012-02-27 Enhanced Recovery Project No Violations inspect well.
0385594620 2013-03-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0400685280 2004-04-22 Enhanced Recovery Project No Violations Injection pressure test. Advised Len Rex to stay under 500psi on annular pressures.
0421729286 2010-12-14 Enhanced Recovery Project No Violations Injection and annulus pressure test. ERP# 12, W-20
0488520438 2005-12-22 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0537383619 2015-03-19 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0553971102 2018-10-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0600971671 2013-10-29 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0740891422 2018-07-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0841951500 2006-11-28 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0854613448 2006-05-10 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0917013171 2009-04-24 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0977209448 2017-07-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1037786513 2014-05-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Pressure test annulus to 400 psi. test held for 15 minutes with no loss in pressure. Tubing has rusted away at the well head and the PVC is visible. Repair is required.
1126802535 2008-04-07 Enhanced Recovery Project No Violations Annulus and injection pressure test.
1218051715 2016-11-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The well head fittings are in poor condition.
1230194444 2016-04-15 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1253298603 2015-08-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Monitor the Injection tubing. The integrity is currently intact, the tubing is showing signs of deterioration.
1307018723 2011-10-18 Enhanced Recovery Project No Violations
1309909726 2017-01-09 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1339348968 2012-05-24 Enhanced Recovery Project No Violations Inspect Well.
1355227638 2012-11-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1400163569 2014-05-06 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The well annulus has equalized with the tubing. This well will be pressure tested for integrity.
1469628440 2016-07-07 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The tubing and well head fittings are in poor condition.
1499075957 2003-11-13 Enhanced Recovery Project No Violations
1523661666 2011-07-12 Enhanced Recovery Project No Violations inspect well.
1633257945 2009-09-30 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1704928578 2014-08-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1750237676 2013-08-29 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1755969666 2015-05-21 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Injector line and injector valve severely deteriorated.
1777284351 2016-01-04 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Well head is in poor condition.
1830886168 2005-04-27 Enhanced Recovery Project No Violations Injection well test.
1850539310 2017-04-24 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1905319978 2017-10-19 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1934941474 2015-11-02 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The well head is in fair condition.
1941966376 2010-04-06 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1987114237 2018-04-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
2019537905 2013-04-04 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Conduct fifteen minute pressure test on well. Passed test.
2060573799 2007-10-04 Enhanced Recovery Project No Violations Injection and annulus presure test. NOV in compliance. Oil has been cleaned up in box.
2087365975 2008-12-11 Enhanced Recovery Project No Violations Injection and annulus pressure test.
2102459124 2014-03-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
2129493427 2018-01-26 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0302362185 US-OH-123139 2007-05-22 Pollution/Contamination

For data sources see[9]

References