X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between pages "34-043-20121" and "0144143607002"

m
 
m
 
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
| Well ID: 34-043-20121
+
| Well ID: 0144143607002
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.305210530, -82.44052032 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.216035, -111.790587 | width=100% | height=100% }}
 
|-
 
|-
| Country: United States
+
| Location: 00/07-36-014-14W4/2
 
|-
 
|-
| State: Ohio
+
| Location Alias: 00/07-36-14-14 W4M
 
|-
 
|-
| County: [[Erie_County,_Ohio|Erie]]
+
| Location Alias 2: 00/07-36-014-14 W4/02
 
|-
 
|-
| Municipality: [[Florence_Township,_Erie_County,_Ohio|Florence Township]]
+
| Country: Canada
 
|-
 
|-
| Operator Name: [[SCHMIDT BURDETTE]]
+
| Province: Alberta
 
|-
 
|-
| Well Pad ID:  
+
| Township: 014
 
|-
 
|-
| Farm/Lease Name: SCHMIDT MARGARET
+
| Meridian: 4
 
|-
 
|-
| License Status: Final Restoration
+
| Range: 14
 
|-
 
|-
| License Date: 2001-11-29
+
| Section: 36
 
|-
 
|-
| Spud Date: 1986-01-20
+
| County/Municipality: [[County of Newell,_Alberta|County of Newell]]
 
|-
 
|-
| Spud Drilling Contractor: [[BOB HUWER DRLG]]
+
| Well Name: CVE 7A ALDSON 7-36-14-14
 
|-
 
|-
| Final Drill Date: 1986-01-23
+
| Operator Name: [[Cenovus Energy Inc.]]
 
|-
 
|-
| Well Total Depth: 786 ft
+
| License Number: 0249738
 
|-
 
|-
| Configuration: Vertical
+
| License Date: 2001-01-25
 
|-
 
|-
| Latitude: 41.305210530
+
| License Status: RecCertified
 
|-
 
|-
| Longitude: -82.44052032
+
| Spud Date: 2001-02-27
 +
|-
 +
| Final Drill Date: 2001-03-03
 +
|-
 +
| Well Total Depth: 1259.00 m
 +
|-
 +
| Surface Hole Latitude: 50.216035
 +
|-
 +
| Surface Hole Longitude: -111.790587
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
+
  | title = General Well Data File - Licensing Data
|publisher = [[Ohio Department of Natural Resources]]
+
|publisher = [[Alberta Energy Regulator]]
| date =  2019-05-07  
+
| date = 2020-04-22
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-05-07 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Well Status
+
!scope="col" | Date
!scope="col" style="width: 15%;text-align: center"| Well Status Date
+
!scope="col" | Event
!scope="col" style="text-align: center"| Comment
+
|-
 +
| 2001-01-25
 +
| Obtained License
 +
|-
 +
| 2001-02-28
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2001-02-28
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2001-03-03
 +
| Finished Drilling
 +
|-
 +
| 2001-03-03
 +
| Well Log Performed
 +
|-
 +
| 2001-03-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-03-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 2001-03-04
 +
| Rig Released
 +
|-
 +
| 2001-03-04
 +
| Well Log Performed
 +
|-
 +
| 2001-03-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-19
 +
| Well Log Performed
 +
|-
 +
| 2001-03-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| CO
+
| 2001-03-25
| 1985-12-31
+
| Perforation Treatment Performed - Jet Perforation
| 33  VICTOR PETROLEUM CORP  GeoDate  12/31/85
 
 
|-
 
|-
| Oil and Gas
+
| 2001-03-25
| 1985-12-31
+
| Plug Back Performed
| Issued Date 12/31/85 Expired Date 12/31/86 Acres 0055500 Tool Type CRAF Proposed Formation 829 Proposed Depth 00786 Proposed Drill Depth 00786
 
 
|-
 
|-
| Original Spud
+
| 2001-03-25
| 1986-01-20
+
| Well Log Performed
| DD 8-30-86
 
 
|-
 
|-
| Completed
+
| 2001-03-29
| 1986-01-23
+
| Well Began Production
| DD 8-30-86
 
 
|-
 
|-
| Reached Total Depth
+
| 2001-03-29
| 1986-01-23
+
| Well Fluid changed to Crude Oil
| DD 8-30-86
 
 
|-
 
|-
| Completion Report Received
+
| 2001-03-29
| 1986-04-07
+
| Well Mode changed to Flowing
| DD 8-30-86
 
 
|-
 
|-
| CO
+
| 2001-03-31
| 1990-09-14
+
| Well Fluid changed to Crude Oil
| 33  VICTOR PETROLEUM CORP  GeoDate  9/14/90
 
 
|-
 
|-
| Unknown
+
| 2001-03-31
| 1990-09-14
+
| Well Mode changed to Suspended
| Issued Date 9/14/90 Expired Date 9/14/90 Proposed Purpose OG Was Plug Supervised  Who Superivsed Plug and Abandon Date
 
 
|-
 
|-
| APP
+
| 2006-02-22
| 2001-11-29
+
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
| Proposed Formations:BIG LIME, Issued Date:11/29/2001, Expired Date:11/29/2002 6:00:00 AM, Drilling unit acres:55, Proposed Well Type:OG, Proposed Well Class:
 
 
|-
 
|-
| Change of Owner
+
| 2006-02-22
| 2001-11-29
+
| Plug Back Performed
| Operator changed from 33, VICTOR PETROLEUM CORP to 7112, SCHMIDT BURDETTE
 
 
|-
 
|-
| Plugged by Orphan Well Program
+
| 2006-02-22
| 2002-06-10
+
| Well Fluid changed to Crude Oil
| Plugged by Orphan Well Program
 
 
|-
 
|-
| Plugged/Abandoned
+
| 2006-02-22
| 2002-06-10
+
| Well Log Performed
| DD 8-30-86
 
 
|-
 
|-
| Construction Permit Expires
+
| 2006-02-22
| 2002-11-29
+
| Well Mode changed to Abandoned Zone
| DD 8-30-86
 
 
|-
 
|-
| Record Last Modified
+
| 2006-02-26
| 2017-02-15
+
| Well Log Performed
| DD 8-30-86
+
|-
 +
| 2006-03-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-03-07
 +
| Well Log Performed
 +
|-
 +
| 2006-03-08
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-03-08
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-05-11
 +
| Well Abandoned
 +
|-
 +
| 2007-05-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2007-05-11
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Risk Based Data Management System - Well and WellHistry Tables
+
  | title = General Well Data File
|publisher = [[Ohio Department of Natural Resources]]
+
|publisher = [[Alberta Energy Regulator]]
| date = 2019-05-07
+
| date = 2020-04-22
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
== Perforation Treatments ==
+
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Perforation Date
+
!scope="col" | Spud Date
!scope="col" style="text-align: center"| Interval Top (ft)
+
!scope="col" | Contractor
!scope="col" style="text-align: center"| Interval Base (ft)
+
!scope="col" style="text-align: right;" | Rig Number
!scope="col" style="text-align: center"| Number of Shots
+
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| 1997-06-29
+
|}-->
| style="text-align: right;" | 0
+
 
| style="text-align: right;" |  
+
== Directional Drilling ==
| style="text-align: right;" | 0
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| 2006-09-11
+
| 2001-02-28
| style="text-align: right;" | 645
+
| style="text-align: right;" | 198.00
| style="text-align: right;" | 720
+
| Deviate (5 - 79 degrees)
| style="text-align: right;" | 12
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Risk Based Data Management System - Perfs Table
+
  | title = General Well Data File - Tour-Direction Drilling Data
|publisher = [[Ohio Department of Natural Resources]]
+
|publisher = [[Alberta Energy Regulator]]
| date = 2019-05-07
+
| date = 2020-04-22
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Fracking Activities ==
+
== Perforation Treatments ==
==== Fracking Jobs ====
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Job Number
+
!scope="col" | Perforation Date
!scope="col" style="text-align: center"| Job Start Date
+
!scope="col" | Perforation Type
!scope="col" style="text-align: center"| Job End Date
+
!scope="col" style="text-align: right;" | Interval Top (m)
!scope="col" style="text-align: center"| True Vertical Depth (ft)
+
!scope="col" style="text-align: right;" | Interval Base (m)
!scope="col" style="text-align: center"| Total Water Volume (gal)
+
!scope="col" style="text-align: right;" | Number of Shots
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
 
|-
 
|-
|}-->
+
| 2001-03-19
<!--==== Fluid Composition Data ====
+
| Perforation
{| class="wikitable sortable" style="width: 100%"
+
| style="text-align: right;" | 1217.80
!scope="col" style="text-align: center"| Job Number
+
| style="text-align: right;" | 1220.80
!scope="col" style="text-align: center"| Trade Name
+
| style="text-align: right;" | 17
!scope="col" style="text-align: center"| Supplier
+
|-
!scope="col" style="text-align: center"| Purpose
+
| 2001-03-25
!scope="col" style="text-align: center"| Ingredient Name
+
| Packing Device Capped w/Cement
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
+
| style="text-align: right;" | 1214.00
!scope="col" style="text-align: center"| Additive Percentage by Mass
+
| style="text-align: right;" | 1217.00
!scope="col" style="text-align: center"| Job Percentage by Mass
+
| style="text-align: right;" | 0
!scope="col" style="text-align: center"| Mass Used (lb)
 
 
|-
 
|-
|}-->
+
| 2001-03-25
== Stimulations Data ==
+
| Perforation
{| class="wikitable sortable" width="95%"
+
| style="text-align: right;" | 1196.00
!scope="col" style="text-align: center"| Stimulation Date
+
| style="text-align: right;" | 1203.60
!scope="col" style="text-align: center"| Chemical Agent
+
| style="text-align: right;" | 17
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 
!scope="col" style="text-align: center"| Fracking Fluid Volume
 
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 
!scope="col" style="text-align: center"| Fracking Company
 
!scope="col" style="text-align: center"| Comments
 
 
|-
 
|-
|  
+
| 2006-02-22
| ACID
+
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1184.80
 +
| style="text-align: right;" | 1192.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 500 Gal
+
|-
 +
| 2006-03-07
 +
| Perforation
 +
| style="text-align: right;" | 233.00
 +
| style="text-align: right;" | 233.60
 +
| style="text-align: right;" | 80
 +
|-
 +
| 2006-03-07
 +
| Perforation
 +
| style="text-align: right;" | 218.00
 +
| style="text-align: right;" | 218.60
 +
| style="text-align: right;" | 80
 +
|-
 +
| 2006-03-08
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 233.00
 +
| style="text-align: right;" | 233.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
|
 
| FRAC;H2O,N2
 
 
|-
 
|-
|  
+
| 2006-03-08
| H2O
+
| Remedial Casing Cementing
 +
| style="text-align: right;" | 218.00
 +
| style="text-align: right;" | 218.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 90 Bbl
 
| style="text-align: right;" | 0
 
|
 
|
 
 
|-
 
|-
|  
+
| 2006-03-08
| N2
+
| Cement Plug
| style="text-align: right;" | 0
+
| style="text-align: right;" | 145.00
| style="text-align: right;" | 40 Mscf
+
| style="text-align: right;" | 245.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Risk Based Data Management System - tblStimulation Table
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
|publisher = [[Ohio Department of Natural Resources]]
+
|publisher = [[Alberta Energy Regulator]]
| date = 2019-05-07
+
| date = 2020-04-22
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Production Data ==
+
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Period
+
!scope="col" | Job Number
!scope="col" style="text-align: center"| Operator Name
+
!scope="col" | Trade Name
!scope="col" style="text-align: center"| Gas Quantity (mcf)
+
!scope="col" | Supplier
!scope="col" style="text-align: center"| Oil Quantity (bbl)
+
!scope="col" | Purpose
!scope="col" style="text-align: center"| Production Days
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 
|}-->
 
|}-->
<!--== Waste Data ==
+
 
{| class="wikitable sortable"
+
<!--== Water Sources ==
!scope="col" style="text-align: center"| Period
+
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Operator Name
+
!scope="col" | Water Diversion Start Date
!scope="col" style="text-align: center"| Waste Type
+
!scope="col" | Water Diversion End Date
!scope="col" style="text-align: center"| Quantity (bbl)
+
!scope="col" | Water Source Type
!scope="col" style="text-align: center"| Production Days
+
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 
|-
 
|-
 
|}-->
 
|}-->
== Inspection Data ==
+
==== Inspections Performed ====
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Inspection ID
+
!scope="col" | Period
!scope="col" style="text-align: center"| Inspection Date
+
!scope="col" style="text-align: right;" | Total Production Hours
!scope="col" style="text-align: center"| Inspection Type
+
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
!scope="col" style="text-align: center"| Inspection Result
+
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
!scope="col" style="text-align: center"| Inspection Comments
+
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
| 0788123910
+
| 2001
| 2003-01-16
+
| style="text-align: right;" | 24
| Final Restoration
+
| style="text-align: right;" | 0.0
| No Violations
+
| style="text-align: right;" | 0.0
| final restoration.
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
<!--==== Violations Commited ====
+
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Inspection ID
+
!scope="col" | Occurence Date
!scope="col" style="text-align: center"| Violation ID
+
!scope="col" | Occurence Type
!scope="col" style="text-align: center"| Violation Date
+
!scope="col" style="text-align: right;" | Occurence Depth (m)
!scope="col" style="text-align: center"| Violation Code
+
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
!scope="col" style="text-align: center"| Violation Comments
 
 
|-
 
|-
 
|}-->
 
|}-->
For data sources see<ref>{{cite web
+
 
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
|publisher = [[Ohio Department of Natural Resources]]
 
| date =  2019-05-07
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Ohio Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 02:16, 11 July 2020

Well Details

Well ID: 0144143607002
Loading map...
Location: 00/07-36-014-14W4/2
Location Alias: 00/07-36-14-14 W4M
Location Alias 2: 00/07-36-014-14 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 14
Section: 36
County/Municipality: County of Newell
Well Name: CVE 7A ALDSON 7-36-14-14
Operator Name: Cenovus Energy Inc.
License Number: 0249738
License Date: 2001-01-25
License Status: RecCertified
Spud Date: 2001-02-27
Final Drill Date: 2001-03-03
Well Total Depth: 1259.00 m
Surface Hole Latitude: 50.216035
Surface Hole Longitude: -111.790587

For data sources see[1][2]

Well History

Date Event
2001-01-25 Obtained License
2001-02-28 Direction Drilling Operation Performed - Deviate
2001-02-28 Surface Casing Operation Performed
2001-03-03 Finished Drilling
2001-03-03 Well Log Performed
2001-03-03 Well Mode changed to Drilled and Cased
2001-03-04 Production Casing Operation Performed
2001-03-04 Rig Released
2001-03-04 Well Log Performed
2001-03-19 Perforation Treatment Performed - Jet Perforation
2001-03-19 Well Log Performed
2001-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-25 Perforation Treatment Performed - Jet Perforation
2001-03-25 Plug Back Performed
2001-03-25 Well Log Performed
2001-03-29 Well Began Production
2001-03-29 Well Fluid changed to Crude Oil
2001-03-29 Well Mode changed to Flowing
2001-03-31 Well Fluid changed to Crude Oil
2001-03-31 Well Mode changed to Suspended
2006-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-22 Plug Back Performed
2006-02-22 Well Fluid changed to Crude Oil
2006-02-22 Well Log Performed
2006-02-22 Well Mode changed to Abandoned Zone
2006-02-26 Well Log Performed
2006-03-07 Perforation Treatment Performed - Jet Perforation
2006-03-07 Well Log Performed
2006-03-08 Perforation Treatment Performed - Cement Plug
2006-03-08 Perforation Treatment Performed - Remedial Casing
2007-05-11 Well Abandoned
2007-05-11 Well Fluid changed to Crude Oil
2007-05-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-02-28 198.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-19 Perforation 1217.80 1220.80 17
2001-03-25 Packing Device Capped w/Cement 1214.00 1217.00 0
2001-03-25 Perforation 1196.00 1203.60 17
2006-02-22 Packing Device Capped w/Cement 1184.80 1192.80 0
2006-03-07 Perforation 233.00 233.60 80
2006-03-07 Perforation 218.00 218.60 80
2006-03-08 Remedial Casing Cementing 233.00 233.60 0
2006-03-08 Remedial Casing Cementing 218.00 218.60 0
2006-03-08 Cement Plug 145.00 245.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 24 0.0 0.0 0.0

For data sources see[6]

References