If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28935 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.504064,"lon":-79.561006,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 153990 | |
Farm/Lease Name: AIKENS | |
License Status: Active | |
Spud Date: 2017-03-25 | |
Permit Date: 2016-12-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.504064 | |
Longitude: -79.561006 |
Date | Event |
---|---|
2016-12-15 | New Permit Application |
2017-03-05 | Performed Spud Operation |
2017-05-07 | Drilling Completion |
2017-07-14 | Perforation |
2017-09-27 | Perforation |
2017-09-27 | Performed Stage 1 of Stimulation |
2017-09-27 | Performed Stage 2 of Stimulation |
2017-09-28 | Perforation |
2017-09-28 | Performed Stage 3 of Stimulation |
2017-09-28 | Performed Stage 4 of Stimulation |
2017-09-29 | Perforation |
2017-09-29 | Performed Stage 5 of Stimulation |
2017-09-29 | Performed Stage 6 of Stimulation |
2017-09-29 | Performed Stage 7 of Stimulation |
2017-09-30 | Perforation |
2017-09-30 | Performed Stage 10 of Stimulation |
2017-09-30 | Performed Stage 8 of Stimulation |
2017-09-30 | Performed Stage 9 of Stimulation |
2017-10-01 | Perforation |
2017-10-01 | Performed Stage 11 of Stimulation |
2017-10-01 | Performed Stage 12 of Stimulation |
2017-10-01 | Performed Stage 13 of Stimulation |
2017-10-02 | Perforation |
2017-10-02 | Performed Stage 14 of Stimulation |
2017-10-02 | Performed Stage 15 of Stimulation |
2017-10-02 | Performed Stage 16 of Stimulation |
2017-10-03 | Perforation |
2017-10-03 | Performed Stage 17 of Stimulation |
2017-10-03 | Performed Stage 18 of Stimulation |
2017-10-04 | Perforation |
2017-10-04 | Performed Stage 19 of Stimulation |
2017-10-04 | Performed Stage 20 of Stimulation |
2017-10-06 | Perforation |
2017-10-06 | Performed Stage 21 of Stimulation |
2017-10-06 | Performed Stage 22 of Stimulation |
2017-10-07 | Perforation |
2017-10-07 | Performed Stage 23 of Stimulation |
2017-10-07 | Performed Stage 24 of Stimulation |
2017-10-07 | Performed Stage 25 of Stimulation |
2017-10-07 | Performed Stage 26 of Stimulation |
2017-10-08 | Perforation |
2017-10-08 | Performed Stage 27 of Stimulation |
2017-10-08 | Performed Stage 28 of Stimulation |
2017-10-08 | Performed Stage 29 of Stimulation |
2017-10-09 | Perforation |
2017-10-09 | Performed Stage 30 of Stimulation |
2017-10-09 | Performed Stage 31 of Stimulation |
2017-10-09 | Performed Stage 32 of Stimulation |
2017-10-10 | Perforation |
2017-10-10 | Performed Stage 33 of Stimulation |
2017-10-10 | Performed Stage 34 of Stimulation |
2017-10-10 | Performed Stage 35 of Stimulation |
2019-12-04 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-27 | 2017-10-10 | 13,568 | 16,250,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ceramic Proppant | Carbo Ceramics | Proppant | Ceramic materials and wares, chemicals | 66402-68-4 | 100 | 9.75821 | 15,438,600.0 |
Aqucar 714 | UPP | Biocide | Quarternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.0002275 | 359.93 | |
Water | 7732-18-5 | 83 | 0.00755299 | 11949.7 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.001274 | 2015.61 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00002730 | 43.192 | ||||
Unislick ST50 | UPP | Friction reducer | Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00415248 | 6569.7 | |
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00415248 | 6569.7 | ||||
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0249149 | 39418.2 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.0107965 | 17081.2 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00415248 | 6569.7 | ||||
WGA-7 | UPP | Viscosifier | Guar Gum | 9000-30-0 | 55 | 0.0300228 | 47499.5 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.0300228 | 47499.5 | ||||
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00625016 | 9888.47 | |
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 3.45277 | 5,462,670.0 | |
Scale Inhibitor E | UPP | Scale Inhibitor | Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.000465456 | 736.405 | |
DETA phosphonate | 15827-60-8 | 5 | 0.000465456 | 736.405 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.00186182 | 2945.62 | ||||
Water | Consol | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.7123 | 135,607,000.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ammonium acetate | 631-61-8 | 13 | 0.0107965 | 17081.2 | |
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00415248 | 6569.7 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00002730 | 43.192 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000367902 | 582.064 | ||||
Thiourea | 62-56-6 | 1 | 0.00000736 | 11.641 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000736 | 11.641 | ||||
DETA phosphonate | 15827-60-8 | 5 | 0.000465456 | 736.405 | ||||
Methanol | 67-56-1 | 5 | 0.00003679 | 58.206 | ||||
Water | 7732-18-5 | 83 | 0.00755299 | 11949.7 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.0300228 | 47499.5 | ||||
Quarternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.0002275 | 359.93 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.000465456 | 736.405 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00415248 | 6569.7 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00415248 | 6569.7 | ||||
HTL-200 Breaker | UPP | Breaker | Sodium chlorite | 7758-19-2 | 20 | 0.00372007 | 5885.58 | |
Unihib G | UPP | Acid inhibitor | Thiourea | 62-56-6 | 1 | 0.00000736 | 11.641 | |
Formaldehyde | 50-00-0 | 1 | 0.00000736 | 11.641 | ||||
Butyl diglycol | 112-34-5 | 75 | 0.000551854 | 873.096 | ||||
Methanol | 67-56-1 | 5 | 0.00003679 | 58.206 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000367902 | 582.064 | ||||
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0642137 | 101593 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-09-27 | 1 | Ceramic | 13,000,042 | 12,700 | 13,215 |
2017-09-27 | 2 | Ceramic | 13,000,042 | 12,545 | 12,914 |
2017-09-28 | 3 | Ceramic | 13,000,042 | 12,483 | 12,933 |
2017-09-28 | 4 | Ceramic | 13,000,042 | 11,527 | 12,942 |
2017-09-29 | 5 | Ceramic | 13,000,042 | 12,853 | 13,810 |
2017-09-29 | 6 | Ceramic | 13,000,042 | 13,250 | 13,783 |
2017-09-29 | 7 | Ceramic | 13,000,042 | 12,818 | 13,068 |
2017-09-30 | 8 | Ceramic | 13,000,042 | 13,238 | 13,651 |
2017-09-30 | 9 | Ceramic | 13,000,042 | 13,396 | 13,793 |
2017-09-30 | 10 | Ceramic | 13,000,042 | 12,820 | 13,110 |
2017-10-01 | 11 | Ceramic | 13,000,042 | 12,936 | 13,216 |
2017-10-01 | 12 | Ceramic | 13,000,042 | 13,524 | 13,832 |
2017-10-01 | 13 | Ceramic | 13,000,042 | 13,225 | 13,644 |
2017-10-02 | 14 | Ceramic | 13,000,042 | 13,063 | 13,341 |
2017-10-02 | 15 | Ceramic | 13,000,042 | 13,428 | 13,719 |
2017-10-02 | 16 | Ceramic | 13,000,042 | 13,000 | 13,862 |
2017-10-03 | 17 | Ceramic | 13,000,042 | 12,994 | 13,848 |
2017-10-03 | 18 | Ceramic | 13,000,042 | 12,931 | 13,394 |
2017-10-04 | 19 | Ceramic | 13,000,042 | 12,930 | 13,385 |
2017-10-04 | 20 | Ceramic | 13,000,042 | 13,178 | 13,178 |
2017-10-06 | 21 | Ceramic | 13,000,042 | 12,966 | 13,803 |
2017-10-06 | 22 | Ceramic | 13,000,042 | 12,827 | 13,351 |
2017-10-07 | 23 | Ceramic | 13,000,042 | 12,647 | 13,066 |
2017-10-07 | 24 | Ceramic | 13,000,042 | 12,808 | 13,391 |
2017-10-07 | 25 | Ceramic | 13,000,042 | 12,671 | 13,147 |
2017-10-07 | 26 | Ceramic | 13,000,042 | 12,693 | 13,153 |
2017-10-08 | 27 | Ceramic | 13,000,042 | 12,927 | 13,367 |
2017-10-08 | 28 | Ceramic | 13,000,042 | 12,625 | 13,127 |
2017-10-08 | 29 | Ceramic | 13,000,042 | 12,416 | 12,936 |
2017-10-09 | 30 | Ceramic | 13,000,042 | 12,764 | 13,589 |
2017-10-09 | 31 | Ceramic | 13,000,042 | 12,823 | 13,224 |
2017-10-09 | 32 | Ceramic | 13,000,042 | 12,545 | 13,175 |
2017-10-10 | 33 | Ceramic | 13,000,042 | 12,346 | 12,799 |
2017-10-10 | 34 | Ceramic | 13,000,042 | 12,331 | 12,830 |
2017-10-10 | 35 | Ceramic | 13,000,042 | 12,095 | 12,572 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CNX GAS CO LLC | 874,310.43 | 39 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 7,100,675.38 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | CNX GAS CO LLC | 3,554,932.95 | 348 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CNX GAS CO LLC | Drilling Fluid Waste | 3,072.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2017 | CNX GAS CO LLC | Drill Cuttings | 578.89 Tons | LANDFILL | 100280 |
2017 | CNX GAS CO LLC | Drilling Fluid Waste | 2,215.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2017 | CNX GAS CO LLC | Produced Fluid | 657.14 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 112.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 15.77 Tons | LANDFILL | 100663 |
2017 | CNX GAS CO LLC | Drill Cuttings | 2,181.22 Tons | LANDFILL | 100594 |
2017 | CNX GAS CO LLC | Produced Fluid | 2,763.80 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2017 | CNX GAS CO LLC | Produced Fluid | 255.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 695.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2017 | CNX GAS CO LLC | Produced Fluid | 95.45 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 3,165.00 Bbl | INJECTION DISPOSAL WELL
-29445 | |
2017 | CNX GAS CO LLC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2017 | CNX GAS CO LLC | Produced Fluid | 110.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2017 | CNX GAS CO LLC | Produced Fluid | 3,041.29 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017 | CNX GAS CO LLC | Produced Fluid | 1,980.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 145.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | CNX GAS CO LLC | Synthetic Liner Materials | 25.93 Tons | LANDFILL | 100663 |
2017 | CNX GAS CO LLC | Produced Fluid | 210.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017 | CNX GAS CO LLC | Produced Fluid | 140.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 3,165.00 Bbl | INJECTION DISPOSAL WELL | 34–167-29445 |
2018 | CNX GAS CO LLC | Produced Fluid | 252.34 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 39.10 Bbl | REUSE (AT WELL PAD) | |
2018 | CNX GAS CO LLC | Produced Fluid | 5,350.35 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Filter Socks | 2.13 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | CNX GAS CO LLC | Produced Fluid | 922.16 Bbl | REUSE (AT WELL PAD) | |
2018 | CNX GAS CO LLC | Produced Fluid | 352.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2018 | CNX GAS CO LLC | Produced Fluid | 105.02 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CNX GAS CO LLC | Produced Fluid | 644.59 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 44.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Produced Fluid | 60.64 Tons | LANDFILL | CID: 38042 |
2018 | CNX GAS CO LLC | Produced Fluid | 4,976.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | CNX GAS CO LLC | Produced Fluid | 2,561.99 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 8.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CNX GAS CO LLC | Produced Fluid | 152.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Produced Fluid | 726.12 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 70.50 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 20.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 102.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CNX GAS CO LLC | Produced Fluid | 325.59 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Produced Fluid | 37.54 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | CNX GAS CO LLC | Produced Fluid | 1,054.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CNX GAS CO LLC | Produced Fluid | 1.53 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CNX GAS CO LLC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 14.30 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Produced Fluid | 146.66 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Produced Fluid | 1,049.93 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2570437 | Primary Facility | 2017-03-10 | Drilling/Alteration | No Violations Noted | Spudded 3/7/17. Drilled to 100' and set 100' of new 30" conductor-grouted in with 6.5 bbl cement on 3-10-17. On site drilling log book and equipment looked ok. |
2574436 | Primary Facility | 2017-03-22 | Routine/Complete Inspection | No Violations Noted | Inspection performed in response to Operator notification of spudding. At the time of inspection, all BMPs installed in accordance with permit and appears to be functioning as designed. All equipment and materials related to drilling activity on secondary containment. No E&S issues. |
2574684 | Primary Facility | 2017-03-23 | Drilling/Alteration | No Violations Noted | Spudded 3-7-17 and ran 100' of 30"new pipe-grouted to surface. Patterson Rig 801 set up getting ready to drill @ time of inspection. Drilling log book-all on site equipment looked ok. |
2576096 | Primary Facility | 2017-03-27 | Drilling/Alteration | No Violations Noted | Patterson 801 Tripple Rig was fishing for a shanked bit @ 1628' at the time of this inpection. They have 644' of 18 5/8" casing cemented with 218 bbl cement and a 20 bbl return. No H2O encountered. 3' of coal at 339' and 5' of coal at 480'. Drilling log up to date and equipment looked ok. |
2576796 | Primary Facility | 2017-03-29 | Drilling/Alteration | No Violations Noted | Rig removed shanked bit in two pieces, drilled to 2100'-set 13 3/8" casing @ 2056'-cemented with 1380 sks cement-got return of 26 bbl cement and landed plug @ 7:45am on 3-29-17. Rig waiting on cement at time of this inspection. Daily drilling log-equipment looked ok. |
2579924 | Primary Facility | 2017-04-05 | Drilling/Alteration | No Violations Noted | Patterson 801 Tripple Rig was drilling @ 9175' at the time of this inspection. All equipment on site looked ok. |
2580443 | Primary Facility | 2017-04-07 | Drilling/Alteration | No Violations Noted | Rig ran and cemented 9911' of 9 5/8" pipe with 2396 sks cement-saw 50 bbl return. Rig had just finished waiting on cement and was tripping back in hole @ time of inspection. All equipment on site looked ok. |
2581496 | Primary Facility | 2017-04-11 | Drilling/Alteration | No Violations Noted | Rig drilling at 11052' in the vertical section just ahead of the KOP at the lateral curve. Drilling log information-all equipment on site looks ok. |
2582542 | Primary Facility | 2017-04-10 | Drilling/Alteration | No Violations Noted | The Patterson Rig had drilled to 11,531' and was tripping pipe out of hole to check on the worn drill bit at the time of this inspection. Drilling log-on site equipment looked ok. |
2583527 | Primary Facility | 2017-04-17 | Drilling/Alteration | No Violations Noted | Rig tripping out of hole from 11,779' with magnet fishing drill collar slip die pieces out of hole. Drilling log-all equipment on site looked ok. |
2585221 | Primary Facility | 2017-04-20 | Drilling/Alteration | No Violations Noted | Orion Triple Rig #16 tripping in hole at 11,813 to resume drilling at time of inspection. BOP test-drilling log information-all equipment on site looked ok. |
2587280 | Primary Facility | 2017-04-25 | Drilling/Alteration | No Violations Noted | The Rig was drilling @ 17,384' at the time of this inspection. BOP test chart-daily drilling log information and all equipment on site looked ok. |
2588064 | Primary Facility | 2017-04-27 | Drilling/Alteration | No Violations Noted | Patterson Rig tripping out of hole from 18,628' due to failure of down hole steering device at time of this inspection. Drilling log information and all equipment on site looked ok. |
2589315 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection drilling activity ongoing. All drilling equipment and material within secondary containment. No E&S issues. |
2589471 | Primary Facility | 2017-05-01 | Drilling/Alteration | No Violations Noted | Rig has TD'd hole and was cleaning hole up at 20,872' and getting ready to lay down pipe at the time of this inspection. Daily drilling information and all equipment on site looked ok. |
2590313 | Primary Facility | 2017-05-04 | Drilling/Alteration | No Violations Noted | The Rig was still circulating the pipe as they were coming out of the hole at 14,050' at the time of this inspection. Daily drilling information and all equipment on site looked ok. |
2604694 | Primary Facility | 2017-06-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears to be drilled. Well not yet fraced or equipped for production. This is an Utica well. No E&S issues. |
2609228 | Primary Facility | 2017-06-28 | Drilling/Alteration | No Violations Noted | Schlumberger was on site finishing the logging operation of this well at the time of this inspection. Well head casing and all equipment on site looked ok. |
2636801 | Primary Facility | 2017-09-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection work on going in preparation for fracking. All equipment and material stored within secondary containment. No E&S issues. |
2642928 | Primary Facility | 2017-10-03 | Drilling/Alteration | No Violations Noted | This Utica well is being fracked with 35 stages planned at intervals of every 38'. The frac crew had just completed stage 17 and was prepping for stage 18 at the time of this inspection. All equipment on site looked very good. The operator is using a very efficient closed loop sand delivery system and a sound reduction manifold system which I commended them for. |
2647798 | Primary Facility | 2017-10-16 | Routine/Complete Inspection | No Violations Noted | All 35 stages of this planned frac have been successfully completed. All site data and equipment looks ok. |
2679958 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well fracked and appears to be equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues. |
2720529 | Primary Facility | 2018-04-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues. |
2773855 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | 9/12/18 - well producing. |
2836726 | Primary Facility | 2019-02-06 | Routine/Complete Inspection | No Violations Noted | 2/6/19 - Well appears to be in good working condition. |
2842327 | Primary Facility | 2019-02-21 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
2843323 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Ten brine tanks on site. Six frac tanks located on site. |
For data sources see[9]