If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28868 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.381644,"lon":-79.292631,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: CAMPBELL OIL & GAS INC | |
Well Pad ID: 151086 | |
Farm/Lease Name: DUFF 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-05-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.381644 | |
Longitude: -79.292631 |
Date | Event |
---|---|
2014-05-01 | New Permit Application |
2014-10-27 | Performed Spud Operation |
2014-11-27 | Drilling Completion |
2015-08-05 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-05 | 2015-08-10 | 8,355 | 7,251,170 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE-100L | FTSI | Scale Inhibitor | Ethylene glycol | 107-21-1 | 10 | 0.000113696 | 79.54 |
Water | 7732-18-5 | 60 | 0.000682173 | 477.25 | ||||
CS-500 SI | FTSI | Scale inhibitor | Acrylic Polymer | Proprietary | 0 | 0 | 0 | |
Water | 7732-18-5 | 55 | 0.0272158 | 19040.3 | ||||
Sodium chloride | 7647-14-5 | 6 | 0.00296899 | 2077.13 | ||||
Ethylene glycol | 107-21-1 | 10 | 0.00494832 | 3461.88 | ||||
Sodium Polyacrylate | 9003-04-7 | 5 | 0.00247416 | 1730.94 | ||||
100 Mesh Sand | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 10.3043 | 7,208,920.0 | |
NE-100 | FTSI | Non-emulsifier | 2-Butoxyethanol | 111-76-2 | 10 | 0.00003188 | 22.3 | |
Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00001594 | 11.15 | ||||
Benzene, C10-16 Alkyl Derivatives | 68648-87-3 | 0.04 | 0.00000013 | 0.09 | ||||
Sulfur Dioxide | 7446-09-5 | 0 | 0.00000000 | 0 | ||||
2-Propanol | 67-63-0 | 10 | 0.00003188 | 22.3 | ||||
Sulfuric Acid | 7664-93-9 | 0.01 | 0.00000004 | 0.03 | ||||
Water | 7732-18-5 | 90 | 0.000286902 | 200.72 | ||||
Unsulphonated Matter | Proprietary | 0.03 | 0.00000009 | 0.06 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Quaternary ammonium compound | Proprietary | 10 | 0.00006329 | 44.28 | |
Water | 7732-18-5 | 5 | 0.00003165 | 22.14 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00006329 | 44.28 | ||||
Isopropanol | 67-63-0 | 30 | 0.000189878 | 132.84 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00006329 | 44.28 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000189878 | 132.84 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00000633 | 4.43 | ||||
Fatty Acid | Proprietary | 0.1 | 0.00000063 | 0.44 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000189878 | 132.84 | ||||
Fatty Acid Salt | Proprietary | 0.1 | 0.00000063 | 0.44 | ||||
Alkylene Oxide Block Polymer | Proprietary | 10 | 0.00006329 | 44.28 | ||||
Aliphatic alcohol | Proprietary | 0.1 | 0.00000063 | 0.44 | ||||
ICI-3240 | FTSI | Biocide | Sodium Hydroxide | 1310-73-2 | 23 | 0.00646273 | 4521.36 | |
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.00674372 | 4717.94 | ||||
Water | 7732-18-5 | 55 | 0.0154544 | 10812 | ||||
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 37 | 0.132656 | 92807.1 | |
Water | 7732-18-5 | 63 | 0.225874 | 158023 | ||||
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 88.8848 | 62,184,300.0 | |
FRW-600 | FTSI | Friction Reducer | Ammonium acetate | 631-61-8 | 6 | 0.00402677 | 2817.15 | |
Acrylamide Polymer | Trade Secret | 100 | 0.0671128 | 46952.5 | ||||
Hydrotreated light distillate | 64742-47-8 | 30 | 0.0201338 | 14085.8 | ||||
40/70 White | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 2.74915 | 1,923,320.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CAMPBELL OIL & GAS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CAMPBELL OIL & GAS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CAMPBELL OIL & GAS INC | 634,115.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2017 | CAMPBELL OIL & GAS INC | 371,952.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CAMPBELL OIL & GAS INC | 272,592.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CAMPBELL OIL & GAS INC | 207,009.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CAMPBELL OIL & GAS INC | Drill Cuttings | 1,409.55 Tons | LANDFILL | 100277 |
2015 | CAMPBELL OIL & GAS INC | Drilling Fluid Waste | 27,549.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | CAMPBELL OIL & GAS INC | Fracturing Fluid Waste | 39.75 Tons | LANDFILL | 101397 |
2016 | CAMPBELL OIL & GAS INC | Produced Fluid | 650.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | CAMPBELL OIL & GAS INC | Fracturing Fluid Waste | 5,290.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CAMPBELL OIL & GAS INC | Produced Fluid | 36,121.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CAMPBELL OIL & GAS INC | Synthetic Liner Materials | 47.00 Tons | LANDFILL | 100277 |
2017 | CAMPBELL OIL & GAS INC | Waste comment only | 0.00 | ||
2017 | CAMPBELL OIL & GAS INC | Produced Fluid | 27,475.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CAMPBELL OIL & GAS INC | Produced Fluid | 3,090.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CAMPBELL OIL & GAS INC | Produced Fluid | 1,765.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CAMPBELL OIL & GAS INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR706105 |
2019 | CAMPBELL OIL & GAS INC | Produced Fluid | 745.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CAMPBELL OIL & GAS INC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CAMPBELL OIL & GAS INC | Produced Fluid | 2,530.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2306786 | Primary Facility | 2014-09-25 | Preoperation Inspection | No Violations Noted | Pre-Operational inspection at the request of the Operator. This inspection fulfills the requirements set forth by Act 13 Section 32.58. At the time of inspection the site was in the process of being temporarily stabilized and all perimeter E&S controls appear to be in sound condition. The Department notes that the site appears to be constructed as outlined in the ESCGP. No observation of accelerated erosion or sedimentation in relation to the access road or well pad area. The Department suggest that the Operator continue to monitor the site weekly and after significant precipitation events to ensure that the well pad and access road remain in stable condition. |
2310379 | Primary Facility | 2014-09-25 | Drilling/Alteration | No Violations Noted | 9/25/2014 Spudding to set conductor. Cellar already in place. |
2317895 | Primary Facility | 2014-09-25 | Drilling/Alteration | No Violations Noted | 9/25/2014 Spudding to set conductor. Cellar already in place. |
2317915 | Primary Facility | 2014-10-01 | Drilling/Alteration | No Violations Noted | 10/1/2014 First Class Energy drilling at depth of 581’. |
2320584 | Primary Facility | 2014-10-23 | Drilling/Alteration | No Violations Noted | 10/23/2014 First Class Energy set 95/8” csg. At 2099’. |
2320586 | Primary Facility | 2014-10-24 | Drilling/Alteration | No Violations Noted | 10/24/2014 First Class Energy moving off of site. Campbell Rep. said going to plug and skid because they can’t keep ahead of the water. |
2320589 | Primary Facility | 2014-10-30 | Drilling/Alteration | No Violations Noted | 10/30/2014 on 10/25/2014 Campbell set cellar and had First Class Energy Spud the well. |
2320590 | Primary Facility | 2014-11-04 | Drilling/Alteration | No Violations Noted | 11/4/2014 HWD Rig Drilling at depth of 2520’ |
2328068 | Primary Facility | 2014-12-09 | Drilling/Alteration | No Violations Noted | 12/9/2014 Rig is gone, waiting for stimulation. |
2340810 | Primary Facility | 2015-01-27 | Drilling/Alteration | No Violations Noted | 1/27/2015 Waiting for stimulation. |
2417763 | Primary Facility | 2015-10-20 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be operational. |
2452387 | Primary Facility | 2016-01-15 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be operational.
No observation of accelerated erosion or sedimentation in relation to the well pad or access road Perimeter BMPs appeared to be installed correctly and functioning properly. The impoundment located onsite appeared to be in sound condition with the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2474525 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok. |
2553509 | Primary Facility | 2017-01-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Two brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2621647 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
For data sources see[8]