X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28806"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28806
 
| Well ID: 37-129-28806
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.213141, -79.706469 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.213142, -79.706469 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Huntingdon Township, Westmoreland County, Pennsylvania|South Huntingdon Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[South Huntingdon Township,_Westmoreland_County,_Pennsylvania|South Huntingdon Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[149234|149234]]
+
| Well Pad ID: [[149234]]
 
|-
 
|-
 
| Farm/Lease Name: SABATINE-SMOUSE UNIT 3H
 
| Farm/Lease Name: SABATINE-SMOUSE UNIT 3H
 
|-
 
|-
| First Permit Date: 2012-09-13
+
| License Status: Active
|-
 
| Last Permit Date: 2012-09-13
 
|-
 
| Spud Date: 2013-01-24
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 01/24/2013
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 9/13/2012
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal Well
 
|-
 
|-
| Latitude: 40.213141
+
| Latitude: 40.213142
 
|-
 
|-
 
| Longitude: -79.706469
 
| Longitude: -79.706469
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2013-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 153358.0
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2014-2
+
| 2013
| style="text-align:right;" | 737879.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 891,237.00
 +
| style="text-align: right;" | 212
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
| 2015
| style="text-align:right;" | 83124.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 921,971.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 621,939.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2017
| style="text-align:right;" | 98736.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 473,049.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 404,731.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
| 2019
| style="text-align:right;" | 91190.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 85,622.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2013-2
+
| 2013-S02
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 983.77
+
| style="text-align: right;" | 983.77 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100592
 
| 100592
| SOUTH HILLS LANDFILL
 
| SOUTH HILLS
 
| PA
 
 
|-
 
|-
 +
| 2013-S02
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 6,202.40 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2013-2
+
| 2013-S02
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,986.40 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2014-S01
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 1.25 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2014-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,961.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 12,468.66 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2014-S01
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 31.33 Tons
 +
| LANDFILL
 +
| 100172
 
|-
 
|-
| 2013-2
+
| 2014-S02
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 2,030.67 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2014-S02
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 25,313.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-1
+
| 2014-S02
| DRILL CUTTINGS
+
| Fracturing Fluid Waste (in Tons)
| style="text-align:right;" | 1.25
+
| style="text-align: right;" | 9.05 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 100592
+
| 100663
| SOUTH HILLS LANDFILL
+
|-
| SOUTH HILLS
+
| 2014-S02
| PA
+
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 86.66 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| MID074259565
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,458.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 678.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 509.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|  
 
|-
 
|-
 +
| 2016-S01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 
|-
 
|-
| 2014-1
+
| 2016-S01
| FLOWBACK FRACTURING SAND
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.33
+
| style="text-align: right;" | 458.33 Bbl
| Tons
+
| REUSE OTHER THAN ROAD SPREADING
| LANDFILL
+
|  
| 100172
 
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
| 2016-S02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 443.02 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 
|-
 
|-
| 2014-1
+
| 2016-S02
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 12.0
+
| style="text-align: right;" | 73.34 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2017-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 78.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 73.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 38.33 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2017-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2017-M06
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2014-1
+
| 2017-M07
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 37.33 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2017-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 38.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 37.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017-M09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 73.33 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2018-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 75.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M02
| FLOWBACK FRACTURING SAND
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 9.05
+
| style="text-align: right;" | 36.67 Bbl
| Tons
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| LANDFILL
+
|  
| 100663
 
| KELLEY RUN LANDFILL
 
| ELIZABETH
 
| PA
 
 
|-
 
|-
 +
| 2018-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M04
| FLOWBACK FRACTURING SAND
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 86.66
+
| style="text-align: right;" | 38.33 Bbl
| Tons
+
| REUSE (AT WELL PAD)
| RESIDUAL WASTE TRANSFER FACILITY
+
|  
| MID074259565
 
| US ECOLOGY
 
| DETROIT
 
| MI
 
 
|-
 
|-
 +
| 2018-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M05
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 25.0
+
| style="text-align: right;" | 33.33 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2018-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 73.33 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 38.33 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 38.33 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M08
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 38.00 Bbl
| Bbl
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
|
| WMGR123SW001
+
|-
| RONCO WASTE PROCESSING FACILITY
+
| 2018-M09
| MASONTOWN
+
| Produced Fluid (in Barrels) RWC 802
| PA
+
| style="text-align: right;" | 73.33 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|  
 
|-
 
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-M12
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 75.00 Bbl
| Bbl
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| REUSE OTHER THAN ROAD SPREADING
+
|
 +
|-
 +
| 2019-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2019-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2019-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 80.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2134614
 
| 2134614
| 2013-01-24
+
| Primary Facility
 +
| 01/24/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Horiaontal Marcellus  
+
| Horiaontal Marcellus
Rocky Mountain Drilling getting set up to spud. 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2134653
 
| 2134653
| 2013-01-25
+
| Primary Facility
 +
| 01/25/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  Horiaontal Marcellus
 
|  Horiaontal Marcellus
Rocky Mountain Drilling setting cellar and conductor.     
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2148867
 
| 2148867
| 2013-03-19
+
| Primary Facility
 +
| 03/19/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine E&S inspection. Blue-White water  found in the drill cuttyings pit
 
| Routine E&S inspection. Blue-White water  found in the drill cuttyings pit
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2164824
 
| 2164824
| 2013-02-23
+
| Primary Facility
 +
| 02/23/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 4/23/2013 Keane rig drilling at depth of 5515'.
 
| 4/23/2013 Keane rig drilling at depth of 5515'.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2166026
 
| 2166026
| 2013-05-13
+
| Primary Facility
 +
| 05/13/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the drill rig was on site and placed on containment.  The erosion and sedimentation plan was on site.  The various pit located onsite appear to be in sound condition and had the required 2' of freeboard.  The Department suggest the Operator continue to inspect the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
| At the time of inspection the drill rig was on site and placed on containment.  The erosion and sedimentation plan was on site.  The various pit located onsite appear to be in sound condition and had the required 2' of freeboard.  The Department suggest the Operator continue to inspect the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2167527
 
| 2167527
| 2013-05-14
+
| Primary Facility
 +
| 05/14/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 5/14/2013 Keane rig skidding to the 1H
 
| 5/14/2013 Keane rig skidding to the 1H
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2183275
 
| 2183275
| 2013-07-10
+
| Primary Facility
 +
| 07/10/2013
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection the result of a complaint received by the Department on 7/10/2013 at approximately 1:00pm. The adjacent landowners issue stems from excessive runoff water on the property after a significant precipitation event.  At the time of inspection the Department observed saturated ground behind the complainant home and garage, also observed were traces of sediment deposits.  Upon further inspection of the well site the Department observed a compromised silt sox BMP directly  behind the complainants home and garage.  The Department notes that this was most likely the reason and source of the excess water.  The Department suggests the Operator submit metrological/rain fall data for July 10 2013.  The Department suggest that the Operator also submit weekly site inspections reports from 6/10/2013 to the date of this incident for the Departments review.
 
| Inspection the result of a complaint received by the Department on 7/10/2013 at approximately 1:00pm. The adjacent landowners issue stems from excessive runoff water on the property after a significant precipitation event.  At the time of inspection the Department observed saturated ground behind the complainant home and garage, also observed were traces of sediment deposits.  Upon further inspection of the well site the Department observed a compromised silt sox BMP directly  behind the complainants home and garage.  The Department notes that this was most likely the reason and source of the excess water.  The Department suggests the Operator submit metrological/rain fall data for July 10 2013.  The Department suggest that the Operator also submit weekly site inspections reports from 6/10/2013 to the date of this incident for the Departments review.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2189372
 
| 2189372
| 2013-07-18
+
| Primary Facility
 +
| 07/18/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 7/18/2013 sidewinder rig drilling on the 2H.
 
| 7/18/2013 sidewinder rig drilling on the 2H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2194953
 
| 2194953
| 2013-08-06
+
| Primary Facility
 +
| 08/06/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 8/6/2013 moving rig off of pad.
 
| 8/6/2013 moving rig off of pad.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2197076
 
| 2197076
| 2013-08-19
+
| Primary Facility
 +
| 08/19/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Follow-up inspection from a complaint filed with the Department on 7/10/2013.  During the inspection the Department observed several areas that the Operator fixed following the precipitation events in July.  The Department notes that the Operator has filed meteorological data supporting the extreme rainfall event on July 10 2013, which resulted in the BMP failure noted in the July 10 2013 inspection.  At the time of inspection the well appeared to be drilled, however the wells donï¾’t appear to be in production.
+
| Follow-up inspection from a complaint filed with the Department on 7/10/2013.  During the inspection the Department observed several areas that the Operator fixed following the precipitation events in July.  The Department notes that the Operator has filed meteorological data supporting the extreme rainfall event on July 10 2013, which resulted in the BMP failure noted in the July 10 2013 inspection.  At the time of inspection the well appeared to be drilled, however the wells don’t appear to be in production.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2216370
 
| 2216370
| 2013-10-24
+
| Primary Facility
 +
| 10/24/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well was in the process of bring stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department notes that the drill pit located onsite has been back filled and the stock pile from which the material came to backfill the pit has been hydro seeded and appears to be stable.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
| At the time of inspection the well was in the process of bring stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department notes that the drill pit located onsite has been back filled and the stock pile from which the material came to backfill the pit has been hydro seeded and appears to be stable.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228551
 
| 2228551
| 2013-11-11
+
| Primary Facility
 +
| 11/11/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well was  stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department also suggests the Operator add the approved OG071 to the mail box on site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
| At the time of inspection the well was  stimulated.  The E&S plan was onsite and appeared to be installed as  outlined in the plan.  No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department also suggests the Operator add the approved OG071 to the mail box on site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2272552
 +
| Primary Facility
 +
| 05/21/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 
|-
 
|-
 
| 2326220
 
| 2326220
| 2014-11-25
+
| Primary Facility
 +
| 11/25/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well appeared to be drilled
+
| At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The Operator appeared to be in the process of backfilling the flow back pit located onsite. The perimeter E&S BMPs appear to properly installed and functioning properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
|  
+
|-
|  
+
| 2377834
|  
+
| Primary Facility
 +
| 06/10/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 6/10/2015 Reclaiming pad, produced fluids tanks diked and GPU's.
 +
|-
 +
| 2378638
 +
| Primary Facility
 +
| 06/11/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  Operator was in the process of restoring the site. Perimeter controls appear to be functioning properly.
 +
|-
 +
| 2501334
 +
| Primary Facility
 +
| 2016-07-14
 +
| Site Restoration
 +
| No Violations Noted
 +
| Inspection in response to a "Well Site Restoration Report" received by the Department on 3/14/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
 +
|-
 +
| 2516784
 +
| Primary Facility
 +
| 2016-08-31
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516776 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2521150
 +
| Primary Facility
 +
| 2016-09-20
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2521146 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2538195
 +
| Primary Facility
 +
| 2016-11-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  Also see inspection # 2538185 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2543528
 +
| Primary Facility
 +
| 2016-12-08
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  Also see inspection # 2543509 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2642999
 +
| Primary Facility
 +
| 2017-10-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. No evidence that suggests a release of production fluid.
 +
|-
 +
| 2772308
 +
| Primary Facility
 +
| 2018-08-21
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Inspection in response to complaint. At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. Inspection conducted during and following a precipitation event. Precipitation runoff appears to be flowing into designated basin on site. Basin appears to be functioning as designed. Areas surrounding well site permanently stabilized with no evidence of erosion. No E&S issues were observed on site and/or on access road. - Invalid Complaint Id. - 0
 +
|-
 +
| 2845748
 +
| Primary Facility
 +
| 2019-02-22
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Multi-well site (photo #2).
 +
At time of inspection well appears equipped for production. Well pad surrounded by security fence. Two brine tanks on site.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 10/11/2013
 +
| 10/16/2013
 +
| style="text-align: right;" | 8088
 +
| style="text-align: right;" | 4,239,450.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="11"| 1
 +
| rowspan="1"| Clean Volume
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Carrier/Base Fluid
 +
| H20
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 92.72
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00007089
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST 50
 +
| rowspan="1"| CESI
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00031497
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| GBL
 +
| rowspan="1"| Clearwater
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00000045
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC 6116a
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| 1, 1-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00015329
 +
| style="text-align: right;" | 0
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00001277
 +
| style="text-align: right;" | 0
 +
|-
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00015329
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| CMHPG
 +
| rowspan="1"| Ashland
 +
| rowspan="1"| Water Viscosifier
 +
| Carboxymethyl Hydroxporoyl Guar Blend
 +
| 68130-15-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00002919
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Hcl Acid
 +
| rowspan="1"| Reagent/PPG
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.0008626
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Scale Inhibitor A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00007571
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| US Sand Co
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 8.66
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 00:15, 18 July 2019

Well Details

Well ID: 37-129-28806
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149234
Farm/Lease Name: SABATINE-SMOUSE UNIT 3H
License Status: Active
Spud Date: 01/24/2013
Permit Date: 9/13/2012
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.213142
Longitude: -79.706469

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 891,237.00 212 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 921,971.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 621,939.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 473,049.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 404,731.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 85,622.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2013-S02 Drill Cuttings (in Tons) 983.77 Tons LANDFILL 100592
2013-S02 Fracing Fluid Waste (in Barrels) 6,202.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-S02 Fracing Fluid Waste (in Barrels) 1,986.40 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Drill Cuttings (in Tons) 1.25 Tons LANDFILL 100592
2014-S01 Fracing Fluid Waste (in Barrels) 1,961.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-S01 Fracing Fluid Waste (in Barrels) 12,468.66 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Fracturing Fluid Waste (in Tons) 31.33 Tons LANDFILL 100172
2014-S02 Fracing Fluid Waste (in Barrels) 2,030.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-S02 Fracing Fluid Waste (in Barrels) 25,313.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracturing Fluid Waste (in Tons) 9.05 Tons LANDFILL 100663
2014-S02 Fracturing Fluid Waste (in Tons) 86.66 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2014-S02 Produced Fluid (in Barrels) 1,458.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 678.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 509.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S01 Produced Fluid (in Barrels) RWC 802 458.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 443.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 73.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 78.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M02 Produced Fluid (in Barrels) RWC 802 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M04 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M06 Drilling Fluid Waste (in Barrels) RWC 803 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M07 Produced Fluid (in Barrels) RWC 802 37.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M07 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 38.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M08 Produced Fluid (in Barrels) RWC 802 37.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 40.67 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 73.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M12 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M01 Produced Fluid (in Barrels) RWC 802 75.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M03 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M05 Produced Fluid (in Barrels) RWC 802 33.33 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 73.33 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M08 Produced Fluid (in Barrels) RWC 802 38.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M09 Produced Fluid (in Barrels) RWC 802 73.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M12 Produced Fluid (in Barrels) RWC 802 75.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 80.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2134614 Primary Facility 01/24/2013 Drilling/Alteration No Violations Noted Horiaontal Marcellus
2134653 Primary Facility 01/25/2013 Routine/Complete Inspection No Violations Noted Horiaontal Marcellus
2148867 Primary Facility 03/19/2013 Routine/Complete Inspection No Violations Noted Routine E&S inspection. Blue-White water found in the drill cuttyings pit
2164824 Primary Facility 02/23/2013 Drilling/Alteration No Violations Noted 4/23/2013 Keane rig drilling at depth of 5515'.
2166026 Primary Facility 05/13/2013 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was on site and placed on containment. The erosion and sedimentation plan was on site. The various pit located onsite appear to be in sound condition and had the required 2' of freeboard. The Department suggest the Operator continue to inspect the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2167527 Primary Facility 05/14/2013 Drilling/Alteration No Violations Noted 5/14/2013 Keane rig skidding to the 1H
2183275 Primary Facility 07/10/2013 Complaint Inspection No Violations Noted Inspection the result of a complaint received by the Department on 7/10/2013 at approximately 1:00pm. The adjacent landowners issue stems from excessive runoff water on the property after a significant precipitation event. At the time of inspection the Department observed saturated ground behind the complainant home and garage, also observed were traces of sediment deposits. Upon further inspection of the well site the Department observed a compromised silt sox BMP directly behind the complainants home and garage. The Department notes that this was most likely the reason and source of the excess water. The Department suggests the Operator submit metrological/rain fall data for July 10 2013. The Department suggest that the Operator also submit weekly site inspections reports from 6/10/2013 to the date of this incident for the Departments review.
2189372 Primary Facility 07/18/2013 Drilling/Alteration No Violations Noted 7/18/2013 sidewinder rig drilling on the 2H.
2194953 Primary Facility 08/06/2013 Drilling/Alteration No Violations Noted 8/6/2013 moving rig off of pad.
2197076 Primary Facility 08/19/2013 Routine/Complete Inspection No Violations Noted Follow-up inspection from a complaint filed with the Department on 7/10/2013. During the inspection the Department observed several areas that the Operator fixed following the precipitation events in July. The Department notes that the Operator has filed meteorological data supporting the extreme rainfall event on July 10 2013, which resulted in the BMP failure noted in the July 10 2013 inspection. At the time of inspection the well appeared to be drilled, however the wells don’t appear to be in production.
2216370 Primary Facility 10/24/2013 Routine/Complete Inspection No Violations Noted At the time of inspection the well was in the process of bring stimulated. The E&S plan was onsite and appeared to be installed as outlined in the plan. No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department notes that the drill pit located onsite has been back filled and the stock pile from which the material came to backfill the pit has been hydro seeded and appears to be stable. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228551 Primary Facility 11/11/2013 Routine/Complete Inspection No Violations Noted At the time of inspection the well was stimulated. The E&S plan was onsite and appeared to be installed as outlined in the plan. No sign of accelerated erosion and sedimentation in relation to the well pad or access road at the time of inspection. The Department also suggests the Operator add the approved OG071 to the mail box on site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2272552 Primary Facility 05/21/2014 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2326220 Primary Facility 11/25/2014 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The Operator appeared to be in the process of backfilling the flow back pit located onsite. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2377834 Primary Facility 06/10/2015 Routine/Complete Inspection No Violations Noted 6/10/2015 Reclaiming pad, produced fluids tanks diked and GPU's.
2378638 Primary Facility 06/11/2015 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. Operator was in the process of restoring the site. Perimeter controls appear to be functioning properly.
2501334 Primary Facility 2016-07-14 Site Restoration No Violations Noted Inspection in response to a "Well Site Restoration Report" received by the Department on 3/14/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
2516784 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516776 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2521150 Primary Facility 2016-09-20 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2521146 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2538195 Primary Facility 2016-11-08 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2538185 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2543528 Primary Facility 2016-12-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2543509 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2642999 Primary Facility 2017-10-03 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. No evidence that suggests a release of production fluid.
2772308 Primary Facility 2018-08-21 Complaint Inspection No Violations Noted Inspection in response to complaint. At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. Inspection conducted during and following a precipitation event. Precipitation runoff appears to be flowing into designated basin on site. Basin appears to be functioning as designed. Areas surrounding well site permanently stabilized with no evidence of erosion. No E&S issues were observed on site and/or on access road. - Invalid Complaint Id. - 0
2845748 Primary Facility 2019-02-22 Complaint Inspection No Violations Noted Multi-well site (photo #2).

At time of inspection well appears equipped for production. Well pad surrounded by security fence. Two brine tanks on site.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/11/2013 10/16/2013 8088 4,239,450.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 92.72 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00007089 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.00031497 0
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00000045 0
EC 6116a Nalco Biocide 1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00015329 0
Dibromoacetonitrile 3252-43-5 5 0.00001277 0
Polyethylene Glycol 25322-68-3 60 0.00015329 0
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00002919 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.0008626 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00007571 0
Proppant US Sand Co Proppant Crystalline Silica 14808-60-7 100 8.66 0

For data sources see[7]