If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445023314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.837155,"lon":-114.230654,"icon":""}]} |
Location: 00/14-33-044-02W5/0 | |
Location Alias: 00/14-33-44-02 W5M | |
Location Alias 2: 00/14-33-044-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Ponoka County | |
Well Name: BONAVISTA WROSES 14-33-44-2 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0330765 | |
License Date: 2005-05-10 | |
License Status: Abandoned | |
Spud Date: 2005-06-29 | |
Final Drill Date: 2005-06-30 | |
Well Total Depth: 947.00 m | |
Surface Hole Latitude: 52.837155 | |
Surface Hole Longitude: -114.230654 |
Date | Event |
---|---|
2005-05-10 | Obtained License |
2005-06-29 | Direction Drilling Operation Performed - Deviate |
2005-06-30 | Finished Drilling |
2005-06-30 | Surface Casing Operation Performed |
2005-06-30 | Well Mode changed to Drilled and Cased |
2005-07-01 | Production Casing Operation Performed |
2005-07-01 | Well Log Performed |
2005-07-02 | Rig Released |
2005-08-31 | Perforation Treatment Performed - Jet Perforation |
2005-08-31 | Well Log Performed |
2005-09-01 | Perforation Treatment Performed - Fractured |
2007-09-27 | Perforation Treatment Performed - Cement Squeeze |
2007-09-27 | Plug Back Performed |
2007-09-27 | Well Mode changed to Abandoned Zone |
2007-10-11 | Perforation Treatment Performed - Jet Perforation |
2007-10-11 | Well Log Performed |
2007-10-17 | Perforation Treatment Performed - Fractured |
2008-01-21 | Well Log Performed |
2008-05-14 | Well Log Performed |
2009-06-27 | Well Log Performed |
2013-02-18 | Well Log Performed |
2013-09-17 | Well Log Performed |
2014-09-03 | Well Log Performed |
2015-10-23 | Well Log Performed |
2018-06-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-06-28 | Plug Back Performed |
2018-08-24 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-06-29 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-31 | Perforation | 370.30 | 371.30 | 13 |
2005-09-01 | Fracture | 370.30 | 371.30 | 0 |
2007-09-27 | Cement Squeeze | 370.30 | 371.30 | 0 |
2007-10-11 | Perforation | 772.50 | 773.00 | 13 |
2007-10-11 | Perforation | 764.00 | 764.50 | 13 |
2007-10-11 | Perforation | 755.80 | 756.80 | 13 |
2007-10-11 | Perforation | 709.00 | 709.50 | 13 |
2007-10-11 | Perforation | 634.40 | 634.90 | 13 |
2007-10-11 | Perforation | 612.90 | 613.40 | 13 |
2007-10-11 | Perforation | 498.40 | 498.90 | 13 |
2007-10-11 | Perforation | 485.60 | 486.10 | 13 |
2007-10-11 | Perforation | 472.50 | 473.00 | 13 |
2007-10-11 | Perforation | 470.20 | 470.70 | 13 |
2007-10-11 | Perforation | 463.30 | 463.80 | 13 |
2007-10-17 | Fracture | 755.80 | 773.00 | 0 |
2007-10-17 | Fracture | 709.00 | 709.50 | 0 |
2007-10-17 | Fracture | 612.90 | 634.90 | 0 |
2007-10-17 | Fracture | 463.30 | 498.90 | 0 |
2018-06-28 | Packing Device Capped w/Cement | 439.50 | 450.00 | 0 |
2018-06-28 | Packing Device Capped w/Cement | 349.50 | 360.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-06-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]