X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28729"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28729
 
| Well ID: 37-129-28729
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.223363, -79.695944 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.223364, -79.695944 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Sewickley Township, Westmoreland County, Pennsylvania|Sewickley Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Sewickley Township,_Westmoreland_County,_Pennsylvania|Sewickley Township]]
 +
|-
 +
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
 
| Well Pad ID: [[149631]]
 
| Well Pad ID: [[149631]]
Line 14: Line 19:
 
| Farm/Lease Name: ZOROSAK UNIT 2H
 
| Farm/Lease Name: ZOROSAK UNIT 2H
 
|-
 
|-
| First Permit Date: 2012-01-11
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2012-10-18
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2012-07-20
+
| Permit Date: 2012-01-11
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
| Latitude: 40.223363
+
| Latitude: 40.223364
 
|-
 
|-
 
| Longitude: -79.695944
 
| Longitude: -79.695944
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-01-11
 +
| New Permit Application
 +
|-
 +
| 2012-07-20
 +
| Performed Spud Operation
 +
|-
 +
| 2012-10-18
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-05-13
 +
| 2013-05-25
 +
| style="text-align: right;" | 8,050
 +
| style="text-align: right;" | 5,965,530
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="12"| 1
 +
| rowspan="1"| GBL
 +
| rowspan="1"| Clearwater
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00005000
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Proppant
 +
| Crystalline Sillica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 9.07
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Hcl Acid
 +
| rowspan="1"| Reagent/PPG
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.08635
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| CMHPG
 +
| rowspan="1"| Ashland
 +
| rowspan="1"| Water Viscosifier
 +
| Carboxymethyl Hydroxporoyl Guar Blend
 +
| 68130-15-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00328
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST 50
 +
| rowspan="1"| CESI
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0341
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Scale Inhibitor A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00754
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC 6116a
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.01548
 +
| style="text-align: right;" | 0
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00129
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1, 1-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00774
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium Sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Carrier/Base Fluid
 +
| H20
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 90.93
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00722
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 396,480.00
 +
| style="text-align: right;" | 121
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 990,150.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 653,983.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 488,448.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 397,082.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 345,853.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 291,388.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 382.55 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 4,150.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,455.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,254.50 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 15,784.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 431.52 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 30.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 5,762.50 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 158.37 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 45,229.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,394.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 1.43 Tons
 +
| LANDFILL
 +
| 073 114 654
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 935.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 255.01 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 445.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 45.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 219.62 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 64.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 112.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 436.50 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 305.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 120.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2085309
 
| 2085309
 +
| Primary Facility
 
| 2012-07-23
 
| 2012-07-23
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection sediment laden later went off of the LOD.
 
| Routine inspection sediment laden later went off of the LOD.
|
 
|-
 
 
|-
 
|-
 
| 2089543
 
| 2089543
 +
| Primary Facility
 
| 2012-07-24
 
| 2012-07-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 7/24/2012 Cellar and conductor in place.  Waiting on rig to drill top hole portion of well.
 
| 7/24/2012 Cellar and conductor in place.  Waiting on rig to drill top hole portion of well.
|
 
|-
 
 
|-
 
|-
 
| 2093602
 
| 2093602
 +
| Primary Facility
 
| 2012-08-13
 
| 2012-08-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 8/13/2012  Cellar and conductor in place.  Waiting on rig to drill top hole portion of well.  Site is still being constructed.
 
| 8/13/2012  Cellar and conductor in place.  Waiting on rig to drill top hole portion of well.  Site is still being constructed.
|
 
|-
 
 
|-
 
|-
 
| 2100998
 
| 2100998
 +
| Primary Facility
 
| 2012-08-27
 
| 2012-08-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 8/27/2012 Keane drilling the 3H bore hole.
 
| 8/27/2012 Keane drilling the 3H bore hole.
|
 
|-
 
 
|-
 
|-
 
| 2101067
 
| 2101067
 +
| Primary Facility
 
| 2012-09-07
 
| 2012-09-07
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 9/7/2012 Keane drilling the 2H bore hole, depth of 406'.
 
| 9/7/2012 Keane drilling the 2H bore hole, depth of 406'.
|
 
|-
 
 
|-
 
|-
 
| 2120876
 
| 2120876
 +
| Primary Facility
 
| 2012-11-19
 
| 2012-11-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 11/19/12 Top hole rig gone, waiting on rig to drill lateral.
 
| 11/19/12 Top hole rig gone, waiting on rig to drill lateral.
|
 
|-
 
 
|-
 
|-
 
| 2123130
 
| 2123130
 +
| Primary Facility
 
| 2012-12-12
 
| 2012-12-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 12/12/2012 Top hole rig gone, waiting on rig to drill lateral.
 
| 12/12/2012 Top hole rig gone, waiting on rig to drill lateral.
|
 
|-
 
 
|-
 
|-
 
| 2127517
 
| 2127517
 +
| Primary Facility
 
| 2013-01-03
 
| 2013-01-03
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 01/03/2013 Top hole rig gone, waiting on rig to drill lateral.
 
| 01/03/2013 Top hole rig gone, waiting on rig to drill lateral.
|
 
|-
 
 
|-
 
|-
 
| 2128559
 
| 2128559
 +
| Primary Facility
 
| 2013-01-09
 
| 2013-01-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 01/09/2013 Nabors rig 789 rigging up to drill lateral.
 
| 01/09/2013 Nabors rig 789 rigging up to drill lateral.
|
 
|-
 
 
|-
 
|-
 
| 2136839
 
| 2136839
 +
| Primary Facility
 
| 2013-02-05
 
| 2013-02-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 2/5/2012 Nabors rig 789 finished lateral @ 13,309.
 
| 2/5/2012 Nabors rig 789 finished lateral @ 13,309.
 +
|-
 +
| 2162886
 +
| Primary Facility
 +
| 2013-04-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drill, however the Operator indicated the well was not stimulated or equipped for production. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2189084
 +
| Primary Facility
 +
| 2013-08-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drill and equipped for production. The well apparatus, brine tanks and gas production units appear to be in sound condition. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2248593
 +
| Primary Facility
 +
| 2014-02-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 2/12/2014 produced fluid tanks diked and GPU's. Inspected w/OGI P. Wyrwas.
 +
|-
 +
| 2248616
 +
| Primary Facility
 +
| 2014-02-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 2/12/2014 Produced fluid tanks and GPU's.  Inspected w/OGI P. Wyrwas.
 +
|-
 +
| 2248626
 +
| Primary Facility
 +
| 2014-02-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 2/26/2014 Produced fluid tanks and GPU's.
 +
|-
 +
| 2272150
 +
| Primary Facility
 +
| 2014-05-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drill and equipped for production. The well apparatus, brine tanks and gas production units appear to be in sound condition. The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2363432
 +
| Primary Facility
 +
| 2015-04-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
|}
+
| 2378635
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2015-06-11
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| At the time of inspection the well appeared to be drilled and equipped for production.  The site was recently hydro seeded and showed signs of growth.  The perimeter controls appeared to be sound condition and functioning properly.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2501351
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-07-14
| style="text-align:right;" | 0.0
+
| Site Restoration
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Inspection in response to a "Well Site Restoration Report" received by the Department on 2/22/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|-
+
| 2683851
| 2012-1
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2018-01-18
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. Ground snow covered, no E&S issues observed.
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
|}-->
| DRILLING FLUID WASTE
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 4150.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0253723
+
!scope="col" | Penalty Code
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
!scope="col" | Penalty Status
| MASONTOWN
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:40, 16 May 2020

Well Details

Well ID: 37-129-28729
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149631
Farm/Lease Name: ZOROSAK UNIT 2H
License Status:
Spud Date:
Permit Date: 2012-01-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.223364
Longitude: -79.695944

For data sources see[1][2][3]

Well History

Date Event
2012-01-11 New Permit Application
2012-07-20 Performed Spud Operation
2012-10-18 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-13 2013-05-25 8,050 5,965,530

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00005000 0
Proppant Chevron Applachia, LLC Proppant Crystalline Sillica 14808-60-7 100 9.07 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.08635 0
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00328 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.0341 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00754 0
EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.01548 0
Dibromoacetonitrile 3252-43-5 5 0.00129 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00774 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 90.93 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00722 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 396,480.00 121 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 990,150.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 653,983.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 488,448.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 397,082.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 345,853.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 291,388.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 382.55 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 4,150.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 2,455.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,254.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 15,784.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 431.52 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,762.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 158.37 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 45,229.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 2,394.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 1.43 Tons LANDFILL 073 114 654
2015 CHEVRON APPALACHIA LLC Produced Fluid 65.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 CHEVRON APPALACHIA LLC Produced Fluid 935.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 255.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 445.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 45.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 219.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 64.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 115.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 112.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 436.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 305.00 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 120.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2085309 Primary Facility 2012-07-23 Routine/Complete Inspection No Violations Noted Routine inspection sediment laden later went off of the LOD.
2089543 Primary Facility 2012-07-24 Drilling/Alteration No Violations Noted 7/24/2012 Cellar and conductor in place. Waiting on rig to drill top hole portion of well.
2093602 Primary Facility 2012-08-13 Drilling/Alteration No Violations Noted 8/13/2012 Cellar and conductor in place. Waiting on rig to drill top hole portion of well. Site is still being constructed.
2100998 Primary Facility 2012-08-27 Drilling/Alteration No Violations Noted 8/27/2012 Keane drilling the 3H bore hole.
2101067 Primary Facility 2012-09-07 Drilling/Alteration No Violations Noted 9/7/2012 Keane drilling the 2H bore hole, depth of 406'.
2120876 Primary Facility 2012-11-19 Drilling/Alteration No Violations Noted 11/19/12 Top hole rig gone, waiting on rig to drill lateral.
2123130 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted 12/12/2012 Top hole rig gone, waiting on rig to drill lateral.
2127517 Primary Facility 2013-01-03 Drilling/Alteration No Violations Noted 01/03/2013 Top hole rig gone, waiting on rig to drill lateral.
2128559 Primary Facility 2013-01-09 Drilling/Alteration No Violations Noted 01/09/2013 Nabors rig 789 rigging up to drill lateral.
2136839 Primary Facility 2013-02-05 Drilling/Alteration No Violations Noted 2/5/2012 Nabors rig 789 finished lateral @ 13,309.
2162886 Primary Facility 2013-04-30 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drill, however the Operator indicated the well was not stimulated or equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2189084 Primary Facility 2013-08-05 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drill and equipped for production. The well apparatus, brine tanks and gas production units appear to be in sound condition. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2248593 Primary Facility 2014-02-12 Routine/Complete Inspection No Violations Noted 2/12/2014 produced fluid tanks diked and GPU's. Inspected w/OGI P. Wyrwas.
2248616 Primary Facility 2014-02-12 Routine/Complete Inspection No Violations Noted 2/12/2014 Produced fluid tanks and GPU's. Inspected w/OGI P. Wyrwas.
2248626 Primary Facility 2014-02-26 Routine/Complete Inspection No Violations Noted 2/26/2014 Produced fluid tanks and GPU's.
2272150 Primary Facility 2014-05-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drill and equipped for production. The well apparatus, brine tanks and gas production units appear to be in sound condition. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2363432 Primary Facility 2015-04-07 Routine/Complete Inspection No Violations Noted
2378635 Primary Facility 2015-06-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The site was recently hydro seeded and showed signs of growth. The perimeter controls appeared to be sound condition and functioning properly.
2501351 Primary Facility 2016-07-14 Site Restoration No Violations Noted Inspection in response to a "Well Site Restoration Report" received by the Department on 2/22/2016, at the time of inspection all earth disturbance activities were complete, PCSM BMP’s installed and functioning.
2683851 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. Ground snow covered, no E&S issues observed.

For data sources see[8]

References