37-129-28655

Well Details

Well ID: 42-129-28655
Loading map...
County: Westmoreland
Municipality: Bell Township
Operator Name: CNX GAS CO LLC
Farm/Lease Name: KUHNS 3A
First Permit Date: 2011-08-12
Last Permit Date: 2011-08-12
Spud Date: 2012-04-13
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 40.508005
Longitude: -79.545961

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2059485 2012-04-16 No Violations Noted Inspection in response to a SPUD notice received of Thursday April 12 2012. At the time of inspection the site was being constructed. The E&S plan was on site and was properly implemented. The site was temporary stabilized as outlined in the E&S Plan. The Department notes an unlined pit onsite at the time of inspection. No accelerated erosion observed in relation to the access road or well pad area at the time of the inspection.
2068974 2012-05-14 No Violations Noted Waiting on rig to commence tophole drilling.
2086647 2012-07-23 No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI Supervisor D. Stivanson.
2086648 2012-07-26 No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2086920 2012-07-23 No Violations Noted At the time of inspection the well had not been drilled. The site appeared to be in sound condition. No accelerated or sedimentation observed in relation to the well pad or access road. The site has been temporarily stabilized and all BMP's appear to be properly installed and maintained. THE Department suggest the Operator continue to monitor the site on a weekly basis and after precipitation event to ensure E&S in not leaving the site.
2089849 2012-08-03 No Violations Noted Due to lost cement circulation and inadvertent returns in last well on 20” casing, the following work was done to prep the hole for this particular location:

Falcon drilled 6 ¼” hole to 108’. Hole was cleaned out and circulated; Sub-Technical rigged up to pump 120 gal of Hyperflex material to seal off any potential surface fractures. Hyperflex was run through Baker packer set in hole at 55’ GL. No contamination or inadvertent returns were seen near the springs; Wait on Hyperflex for one hour and Falcon will being drilling 26” hole.

2092776 2012-08-06 No Violations Noted 20” casing ran and cemented during inspection. No inadvertent returns for the duration of the cement job inspection. Closed loop system being utilized. Pit lined and freeboard maintained.
2092856 2012-08-20 No Violations Noted At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2097838 2012-09-05 No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained.
2127552 2013-01-03 No Violations Noted At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2134655 2013-01-25 No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano.
2138179 2013-02-11 No Violations Noted no violations noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILLING FLUID WASTE 870.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 DRILL CUTTINGS 802.21 Tons LANDFILL 100434 WASTE MANAGEMENT, INC - EVERGREEN LANDFILL BLAIRSVILLE PA