X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28458"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28458
 
| Well ID: 37-129-28458
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.521978, -79.484386 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.521978, -79.484386 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/07/2011
+
| Spud Date: 2011-03-07
 
|-
 
|-
| Permit Date: 11/4/2010
+
| Permit Date: 2010-11-04
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 74: Line 99:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 83: Line 108:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 161: Line 186:
 
| 1957612
 
| 1957612
 
| Primary Facility
 
| Primary Facility
| 03/09/2011
+
| 2011-03-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 168: Line 193:
 
| 1957712
 
| 1957712
 
| Primary Facility
 
| Primary Facility
| 03/10/2011
+
| 2011-03-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 175: Line 200:
 
| 1960778
 
| 1960778
 
| Primary Facility
 
| Primary Facility
| 03/22/2011
+
| 2011-03-22
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 182: Line 207:
 
| 1969376
 
| 1969376
 
| Primary Facility
 
| Primary Facility
| 04/08/2011
+
| 2011-04-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 189: Line 214:
 
| 1969384
 
| 1969384
 
| Primary Facility
 
| Primary Facility
| 04/22/2011
+
| 2011-04-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 196: Line 221:
 
| 1987126
 
| 1987126
 
| Primary Facility
 
| Primary Facility
| 06/30/2011
+
| 2011-06-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 203: Line 228:
 
| 2035133
 
| 2035133
 
| Primary Facility
 
| Primary Facility
| 12/30/2011
+
| 2011-12-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 210: Line 235:
 
| 2047162
 
| 2047162
 
| Primary Facility
 
| Primary Facility
| 03/02/2012
+
| 2012-03-02
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 217: Line 242:
 
| 2053761
 
| 2053761
 
| Primary Facility
 
| Primary Facility
| 03/26/2012
+
| 2012-03-26
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 259: Line 284:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 13:51, 1 August 2019

Well Details

Well ID: 37-129-28458
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Bell Township
Operator Name: US ENERGY EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: SHOEMAKER 1
License Status: Active
Spud Date: 2011-03-07
Permit Date: 2010-11-04
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.521978
Longitude: -79.484386

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0 0.00 0 0.00 0
2012 US ENERGY EXPLORATION CORP 7,851.00 330 0.00 0 0.00 0
2013 US ENERGY EXPLORATION CORP 4,404.00 360 0.00 0 0.00 0
2014 US ENERGY EXPLORATION CORP 3,303.00 365 0.00 0 0.00 0
2015 US ENERGY EXPLORATION CORP 2,792.00 365 0.00 0 0.00 0
2016 US ENERGY EXPLORATION CORP 2,096.00 365 0.00 0 0.00 0
2017 US ENERGY EXPLORATION CORP 1,793.00 365 0.00 0 0.00 0
2018 US ENERGY EXPLORATION CORP 1,147.00 365 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1957612 Primary Facility 2011-03-09 Drilling/Alteration No Violations Noted Tripping back in hole (bit trip) at time of inspection. 6 1/4" hole at 2545' of proposed 3875' TD. Information per drillers log and cement tickets: 21' of 13 3/8" conductor set on 03-07-11. 928' of 20 lb/ft 7" casing set in 943' 8 7/8" hole and cemented with 130 sacks of 50/50 surface POZ containing 3% CACL2 & 1/4# flake & 0.3% FCP (yield=1.07 cu ft/sk); tailed by 50 sacks of "A" containing 3% CACL2 & 1/4# flake & 0.3% FCP (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 10:22 03-08-11. Grouted backside of casing with basket set at 126'.
1957712 Primary Facility 2011-03-10 Drilling/Alteration No Violations Noted Running 4 1/2" production casing at time of inspection. TD = 3875'.
1960778 Primary Facility 2011-03-22 Drilling/Alteration No Violations Noted Water truck filling frack pit at time of inspection. Frack pit lined and freeboard maintained.
1969376 Primary Facility 2011-04-08 Routine/Complete Inspection No Violations Noted Drilled, not equipped for production. Site ID sign and E&S plan located. Pit is on-site / in sound condition. An E&S concern was noted while on-site-
1969384 Primary Facility 2011-04-22 Routine/Complete Inspection No Violations Noted Met with operator representative Harry Mills to check out improvements made to the E&S controls.
1987126 Primary Facility 2011-06-30 Drilling/Alteration Violation(s) Noted Well shut-in on 4 1/2" x 2" swage.
2035133 Primary Facility 2011-12-30 Routine/Complete Inspection Violation(s) Noted Well in operation and properly identified. Well site reclaimed, seeded, and mulched.
2047162 Primary Facility 2012-03-02 Site Restoration No Violations Noted Drilling had been completed on 03/10/11. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been restored and the vegetative cover met the 70% uniform coverage criteria. It was noted that the well was located in a small pasture field.
2053761 Primary Facility 2012-03-26 Site Restoration No Violations Noted Well appears to drilled and equipped for production. Well apparatus and brine tank located on site appear to be in sound condition. No observation of accelerated erosion on the well pad or access road noted. The site has been restored.
2603572 Primary Facility 2017-06-13 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank onsite and appears to be structurally sound. No E&S issues.

For data sources see[5]

References