X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-25250"

m
m
Line 194: Line 194:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
Line 203: Line 203:
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 573.00
 
| style="text-align: right;" | 573.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 221: Line 221:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 226: Line 227:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2005-A00
+
| 2005
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 220.00 Bbl
 
| style="text-align: right;" | 220.00 Bbl
Line 232: Line 234:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 600.00 Bbl
 
| style="text-align: right;" | 600.00 Bbl
Line 238: Line 241:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 244: Line 248:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 106.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
|-
 
| 2010-A00
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
Line 256: Line 255:
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 5.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
|-
 
| 2010-A00
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 17.00 Bbl
 
| style="text-align: right;" | 17.00 Bbl
Line 268: Line 262:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2010-A00
+
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 13.00 Bbl
+
| style="text-align: right;" | 14.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| PUBLIC SEWAGE TREATMENT PLANT
| PA0095443
+
| PA0026310
 
|-
 
|-
| 2010-A00
+
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
Line 280: Line 276:
 
| PA0026034
 
| PA0026034
 
|-
 
|-
| 2010-A00
+
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 14.00 Bbl
+
| style="text-align: right;" | 106.00 Bbl
| PUBLIC SEWAGE TREATMENT PLANT
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0026310
+
| 301353
 +
|-
 +
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 13.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
|-
 +
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 5.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 21.00 Bbl
 
| style="text-align: right;" | 21.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
| PA0095443
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 57.00 Bbl
 
| style="text-align: right;" | 57.00 Bbl
Line 298: Line 311:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 21.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0026310
 +
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 21.00 Bbl
 
| style="text-align: right;" | 21.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| 301353
 
|-
 
|-
| 2011-A00
+
| 2012
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 21.00 Bbl
+
| style="text-align: right;" | 88.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
| PA0026310
+
| PA0020346
 
|-
 
|-
| 2012-A00
+
| 2012
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 93.00 Bbl
 
| style="text-align: right;" | 93.00 Bbl
Line 316: Line 339:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-A00
+
| 2013
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 88.00 Bbl
+
| style="text-align: right;" | 52.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2013-A00
+
| 2014
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 52.00 Bbl
+
| style="text-align: right;" | 60.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2014-A00
+
| 2014
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 8.00 Bbl
 
| style="text-align: right;" | 8.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
|-
 
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 60.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
 
|-
 
|-
 
|}
 
|}

Revision as of 23:29, 20 August 2019

Well Details

Well ID: 37-129-25250
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: ROSS SEANOR 3
License Status: Active
Spud Date: 2005-08-15
Permit Date: 2004-01-27
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.404292
Longitude: -79.463865

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 PHILLIPS EXPLORATION INC 1,796.00 60 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 5,568.00 365 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 3,288.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 2,615.00 326 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 2,044.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 1,331.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 946.00 292 0.00 0 0.00 0
2012 XTO ENERGY INC 602.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 561.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 772.00 346 0.00 0 0.00 0
2015 XTO ENERGY INC 383.00 362 0.00 0 0.00 0
2016 XTO ENERGY INC 645.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 622.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 573.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2005 PHILLIPS EXPLORATION INC Brine 220.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2006 PHILLIPS EXPLORATION INC Brine 600.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 PHILLIPS EXPLORATION INC Brine 160.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 17.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 14.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 106.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 13.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 5.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 21.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 57.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 21.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 21.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 XTO ENERGY INC Produced Fluid (in Barrels) 88.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2012 XTO ENERGY INC Produced Fluid (in Barrels) 93.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid (in Barrels) 52.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 XTO ENERGY INC Produced Fluid (in Barrels) 60.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 XTO ENERGY INC Produced Fluid (in Barrels) 8.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2448305 Primary Facility 2016-02-09 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. Brine tank OK. E &S OK. Well apparatus appeared to be in sound condition. Annulus closed.
2450266 Primary Facility 2016-02-09 Routine/Complete Inspection No Violations Noted 2/9/2016 - Well tag, annulus closed, produced fluids tank.
2496726 Primary Facility 2016-06-28 Routine/Complete Inspection No Violations Noted 6/28/2016 - Produced fluids tank, annullus closed.
2548632 Primary Facility 2016-12-13 Routine/Complete Inspection No Violations Noted 12/13/2016 - Tag, Tank, Annulus closed.
2635659 Primary Facility 2017-09-13 Routine/Complete Inspection No Violations Noted
2801113 Primary Facility 2018-11-09 Routine/Complete Inspection No Violations Noted Well appears to be in good working condition.

For data sources see[6]

References