X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28603

Well Details

Well ID: 37-129-28603
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 144593
Farm/Lease Name: BRADY
License Status: Plugged and Abandoned
Spud Date: 2011-09-12
Permit Date: 2011-05-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.127289
Longitude: -79.384342

For data sources see[1][2][3]

Well History

Date Event
DEVIATED
2011-05-24 New Permit Application
2011-06-11 Performed Spud Operation
2011-10-07 Drilling Completion
2015-12-08 Begin Plugging
2015-12-12 Finished Plugging
2019-05-30 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XPR RESOURCES LLC Drill Cuttings 1,077.08 Tons LANDFILL 101571
2014 XPR RESOURCES LLC Produced Fluid 1,755.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Servicing Fluid 700.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994403 Primary Facility 2011-06-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Spud had been called in and conductor had been drilled.
2004363 Primary Facility 2011-09-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2005149 Primary Facility 2011-09-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2034730 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2043021 Primary Facility 2012-02-10 Routine/Complete Inspection No Violations Noted Site visit was a compliance evaluation for the 1-11-12 violation.
2117323 Primary Facility 2012-11-21 Routine/Complete Inspection No Violations Noted Routie inspection no issues noted.
2121111 Primary Facility 2012-12-06 Routine/Complete Inspection No Violations Noted
2121112 Primary Facility 2012-12-06 Routine/Complete Inspection No Violations Noted
2438629 Primary Facility 2015-12-03 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-2H well. Casing and tubing had 50 psi. Pressure was bleed off. 35 bbl. of production water was pumped into tubing. BOP was tested to 2500 psi. Renegade wireline was set to depth of 7500 feet. On December 3, 2015, WPX pumped cement plug form 7500 ft. to 2700 feet by setting 1000 ft. intervals. The plug was set by using 113 bbl. with 485 sacks of 15.2 # Class A cement (1.25 yields).
2438726 Primary Facility 2015-12-06 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX completed the process of plugging Brady 1-2H well. On December 4, 2015 WPX cleared hole to 2700 feet. Cut 5.5 inch casing to 2690 feet. Ran 2 3/8 inch tubing to 2700 feet. Pumped 54 bbls comprised of 243 sacks of 15.2 # Class A cement (1.25 yields). Plug was set at 2700 feet to 2000 feet. On December 7, 2015, WPX set final cement plug at 1950 to surface using 700sacks (153.5 bbl.) of class A 1.25 yield. .
2438774 Primary Facility 2015-12-10 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-4H well. WPX set cement tubing at 7510 feet. C&J cementers cemented 5.5” casing from 7510 feet to 2100 feet using 122 bbl. comprised of 550 sacks of 15.2 # 1.25 Class A cement. Cement was pumped in plug intervals of 1000 feet and laying down tubing between plugs. On 12/10/15, Casing was cut at 2070 feet. C&J cement set cement plug from 2070 feet to 1780 feet using 22.5 bbl.with 100 sacks of Class A. On 12/11/15, C&J cementing set a plug from 1789 feet to surface with 140 bbl. using 630 sacks of Class A.
2526030 Primary Facility 2016-10-05 Routine/Partial Inspection No Violations Noted Well plugged. See inspection #2525926 for additional observations made during the10/5/2016 site inspection.
2530405 Primary Facility 2016-10-20 Routine/Partial Inspection No Violations Noted Well plugged. See inspection # 2530397 for additional observations made during the10/20/2016 site inspection.
2605912 Primary Facility 2017-06-20 Follow-up Inspection No Violations Noted Well plugged. No monument observed. See inspection report #2605906 for additional observations made on 6/20/2017.

For data sources see[7]

References