If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-24639 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.486238,"lon":-79.493249,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Bell Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: RICHARD CYPHER 3 | |
License Status: Active | |
Spud Date: 2003-06-13 | |
Permit Date: 2001-12-10 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.486238 | |
Longitude: -79.493249 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2003 | PHILLIPS EXPLORATION INC | 2,458.00 | 58 | 0.00 | 0 | 0.00 | 0 |
2004 | PHILLIPS EXPLORATION INC | 12,203.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS EXPLORATION INC | 8,490.00 | 341 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS EXPLORATION INC | 7,304.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS EXPLORATION INC | 6,822.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 7,078.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 6,406.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 5,540.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 4,866.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 3,922.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 3,795.00 | 365 | 24.00 | 365 | 0.00 | 0 |
2014 | XTO ENERGY INC | 2,783.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,778.10 | 296 | 3.84 | 296 | 0.00 | 0 |
2016 | XTO ENERGY INC | 2,674.30 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETROLEUM CO LLC | 2,896.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETROLEUM CO LLC | 2,465.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2003-A00 | Brine | 75.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2004-A00 | Brine | 135.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2005-A00 | Brine | 140.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2008-A00 | Brine | 65.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2013-A00 | Produced Fluid (in Barrels) | 6.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2365426 | Primary Facility | 2015-04-29 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. Well site restored no sign of accelerated erosion or sedimentation in relation to the access road or well site. |
2394913 | Primary Facility | 2015-07-28 | Routine/Complete Inspection | No Violations Noted | Access road shared with private property and field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Site permanently stabilized. No E&S issues in relation to site and/or access road. Brine tank located on site within earthen dyke and appears structurally sound. |
For data sources see[6]