X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-27935"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-27935
 
| Well ID: 37-125-27935
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.124581, -80.133831 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.124581, -80.133831 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: TRINIDAD SCORPION 5H
 
| Farm/Lease Name: TRINIDAD SCORPION 5H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 05/01/2017
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/20/2016
+
| Permit Date: 2016-07-20
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.124581
 
| Latitude: 40.124581
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Production Data ==
+
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Period
+
!scope="col" | Date
!scope="col" | Operator Name
+
!scope="col" | Event
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2017
 
| [[RICE DRILLING B LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018
 
| [[RICE DRILLING B LLC]]
 
| style="text-align: right;" | 2,635,394.00
 
| style="text-align: right;" | 209
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2019
+
| 2016-07-20
| [[RICE DRILLING B LLC]]
+
| New Permit Application
| style="text-align: right;" | 1,053,974.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
|}
+
| 2017-05-01
For data sources see<ref>{{cite web
+
| Performed Spud Operation
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2017-05
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 59.06 Tons
 
| LANDFILL
 
| 06-08438
 
|-
 
| 2017-05
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 17.92 Tons
 
| LANDFILL
 
| 100620
 
|-
 
| 2017-05
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 0.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-05
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 19.17 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 36.24 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 0.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-05
 
| Other Oil & Gas Wastes (in Tons) RWC 899
 
| style="text-align: right;" | 0.51 Tons
 
| LANDFILL
 
| 06-08438
 
|-
 
| 2017-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 25.87 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2017-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 6.48 Tons
 
| LANDFILL
 
| 100620
 
|-
 
| 2017-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 7.30 Tons
 
| LANDFILL
 
| 100663
 
|-
 
| 2017-06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 121.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 16.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 325.32 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 37.11 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 15.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 35.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-07
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 6.55 Tons
 
| LANDFILL
 
| 06-08438
 
|-
 
| 2017-07
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 49.40 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2017-07
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 6.59 Tons
 
| LANDFILL
 
| 100620
 
|-
 
| 2017-07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 20.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW001
 
|-
 
| 2017-07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 229.08 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 8.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 128.31 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 17.85 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 54.24 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-08
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 2.59 Tons
 
| LANDFILL
 
| 06-08438
 
|-
 
| 2017-08
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 55.26 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2017-08
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 3.31 Tons
 
| LANDFILL
 
| 100620
 
|-
 
| 2017-08
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 2.53 Tons
 
| LANDFILL
 
| 100663
 
|-
 
| 2017-08
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 62.35 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 149.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 28.75 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 65.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-09
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 14.56 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2017-09
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 3.10 Tons
 
| LANDFILL
 
| 100620
 
|-
 
| 2017-09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 1.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 194.47 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 10.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-09
 
| Other Oil & Gas Wastes (in Tons) RWC 899
 
| style="text-align: right;" | 1.32 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-511
 
|-
 
| 2017-09
 
| Servicing Fluid (in Tons) RWC 808
 
| style="text-align: right;" | 1.66 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-511
 
|-
 
| 2017-09
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 1.03 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2017-09
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 3.28 Tons
 
| LANDFILL
 
| 100663
 
|-
 
| 2018-03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 10.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 6.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-04
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 226.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-04
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 8.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-05
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 0.75 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 2014-541
 
|-
 
| 2018-06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 544.17 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 108.13 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 63.72 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-06
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 83.69 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 2014-541
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.38 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 242.76 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.48 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 40.83 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 320.19 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 58.85 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.04 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.54 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.04 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.15 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 422.76 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 1.41 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 2014-541
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.40 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 173.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.30 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,578.52 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 145.57 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| N/A
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.66 Bbl
 
| INJECTION DISPOSAL WELL
 
| 2D0859721
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 151.17 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-105-23619
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 288.34 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-167-29543
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.53 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,069.73 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2019-03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 75.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 84.32 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 745.73 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2547461
 
| Primary Facility
 
| 2016-12-02
 
| Preoperation Inspection
 
| No Violations Noted
 
| Preoperational inspection conducted at the request of the operator.
 
|-
 
| 2590269
 
| Primary Facility
 
| 2017-05-03
 
| Drilling/Alteration
 
| No Violations Noted
 
| Butch’s Rathole Service auger rig
 
Drilled a 36” wellbore and set 26” conductor casing at 40 ft. on 5/1/17.
 
|-
 
| 2614766
 
| Primary Facility
 
| 2017-07-07
 
| Drilling/Alteration
 
| No Violations Noted
 
| Falcon Drilling Rig #29
 
Moved onto this well on 7/5/17 and resumed drilling at 52 ft. KB.  The 20” casing was set at 250 ft. on 7/5/17 and cemented to surface with 8 bbls returned.  The 13 3/8” casing was set at 581 ft. on 7/6/17 and cemented to surface with 10 bbls returned.  Coal was found from 537 ft. to 544 ft.  A basket was set at 517 ft.  Currently at 394 ft. and nippling up BOP’s prior to TIH.
 
|-
 
| 2631442
 
| Primary Facility
 
| 2017-08-29
 
| Drilling/Alteration
 
| No Violations Noted
 
| Falcon Drilling Rig #29
 
Moved onto this well on 8/16/17 and resumed drilling at 6840 ft. KB.  KOP was at 6936 ft.  EOB was at 8078 ft. MD (7468.91 ft. TVD).  TD was at 15,730 ft. MD (7521.49 ft. TVD) on 8/19/17.  The 5 ½” casing was set at 15,720 ft.  Estimated TOC at 2072 ft.
 
|-
 
| 2748443
 
| Primary Facility
 
| 2018-07-03
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well has been completed and is producing.  Large water tank on site.  There is also some soft containment and miscellaneous equipment on site.
 
 
|-
 
|-
 
|}
 
|}
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title =Oil and Gas Compliance Report
+
  | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2020-02-27
| date = 2019-05-20
 
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 690: Line 81:
 
|-
 
|-
 
| 1
 
| 1
| 04/26/2018
+
| 2018-04-26
| 05/15/2018
+
| 2018-05-15
| style="text-align: right;" | 7521.49
+
| style="text-align: right;" | 7,521
| style="text-align: right;" | 16,212,300.0
+
| style="text-align: right;" | 16,212,300
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 920: Line 311:
 
| style="text-align: right;" | 22839.4
 
| style="text-align: right;" | 22839.4
 
|-
 
|-
| Contains no hazardous substances in concentrations above cut-off values according to the competent authoriy
+
| Contains no hazardous substances<br/> in concentrations above<br/> cut-off values according to the competent authoriy
 
| Proprietary
 
| Proprietary
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 100
Line 972: Line 363:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 2,635,394.00
 +
| style="text-align: right;" | 209
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 3,016,881.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 20.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 37.40 Tons
 +
| LANDFILL
 +
| 100620
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 108.83 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 65.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 1.32 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-511
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 834.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 68.20 Tons
 +
| LANDFILL
 +
| 06-08438
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 27.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 53.51 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 9.83 Tons
 +
| LANDFILL
 +
| 100663
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.24 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Servicing Fluid
 +
| style="text-align: right;" | 1.66 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-511
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 1.03 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 115.34 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 16.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.51 Tons
 +
| LANDFILL
 +
| 06-08438
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 3.28 Tons
 +
| LANDFILL
 +
| 100663
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 415.76 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 156.66 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,867.37 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 245.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 320.19 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 85.85 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 422.76 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 424.30 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 75.52 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 151.17 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-105-23619
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 117.24 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 145.57 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| N/A
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 288.34 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-167-29543
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 18.66 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 2D0859721
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 129.06 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 85.83 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,702.03 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,135.59 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 104.51 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2547461
 +
| Primary Facility
 +
| 2016-12-02
 +
| Preoperation Inspection
 +
| No Violations Noted
 +
| Preoperational inspection conducted at the request of the operator.
 +
|-
 +
| 2590269
 +
| Primary Facility
 +
| 2017-05-03
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Butch’s Rathole Service auger rig
 +
Drilled a 36” wellbore and set 26” conductor casing at 40 ft. on 5/1/17.
 +
|-
 +
| 2614766
 +
| Primary Facility
 +
| 2017-07-07
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Falcon Drilling Rig #29
 +
Moved onto this well on 7/5/17 and resumed drilling at 52 ft. KB.  The 20” casing was set at 250 ft. on 7/5/17 and cemented to surface with 8 bbls returned.  The 13 3/8” casing was set at 581 ft. on 7/6/17 and cemented to surface with 10 bbls returned.  Coal was found from 537 ft. to 544 ft.  A basket was set at 517 ft.  Currently at 394 ft. and nippling up BOP’s prior to TIH.
 +
|-
 +
| 2631442
 +
| Primary Facility
 +
| 2017-08-29
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Falcon Drilling Rig #29
 +
Moved onto this well on 8/16/17 and resumed drilling at 6840 ft. KB.  KOP was at 6936 ft.  EOB was at 8078 ft. MD (7468.91 ft. TVD).  TD was at 15,730 ft. MD (7521.49 ft. TVD) on 8/19/17.  The 5 ½” casing was set at 15,720 ft.  Estimated TOC at 2072 ft.
 +
|-
 +
| 2748443
 +
| Primary Facility
 +
| 2018-07-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well has been completed and is producing.  Large water tank on site.  There is also some soft containment and miscellaneous equipment on site.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 14:54, 15 May 2020

Well Details

Well ID: 37-125-27935
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Bethlehem Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 153534
Farm/Lease Name: TRINIDAD SCORPION 5H
License Status:
Spud Date:
Permit Date: 2016-07-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.124581
Longitude: -80.133831

For data sources see[1][2][3]

Well History

Date Event
2016-07-20 New Permit Application
2017-05-01 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-26 2018-05-15 7,521 16,212,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Universal Carrier/Base Fluid Listed Below
MX 5-3886 Multi-Chem Bacteria Treatment Listed Below
MX 8-4543 Multi-Chem Bacteria Treatment Listed Below
Sand (Proppant) Universal Proppant Listed Below
Silver FR-931 Silverback Chemical Friction Reducer Listed Below
Methanol 0000067-56-1 5 0.00000138 2.112
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.00000689 10.561
Hydrotreated Distillate 64742-47-8 20 0.011375 17445.5
Hydrochloric Acid 7647-01-0 15 0.0238677 36605.1
Silica Substrate 14808-60-7 100 11.4732 17,596,000.0
Oleic Acid Diethanolamide 93-83-4 2 0.0011375 1744.55
Calcium Nitrate.4H2O 13477-34-4 100 0.0389762 59776.6
Thiourea 0000062-56-6 1 0.011375 17445.5
Butyl Diglycol 0000112-34-5 75 0.0180928 27748.3
Water 7732-18-5 50 0.0284376 43613.8
Proprietary Polymers Proprietary 60 0.00006886 105.612
Proprietary Polymers Proprietary 60 0.00006886 105.612
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.0011375 1744.55
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.00000689 10.561
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.0011375 1744.55
Water 7732-18-5 50 0.0284376 43613.8
Formaldehyde 0000050-00-0 1 0.00000138 2.112
Oleic Acid Diethanolamide 93-83-4 2 0.0011375 1744.55
Copolymer of 2-Propenamide Proprietary 20 0.000103294 158.418
Hydrotreated Distillate 64742-47-8 20 0.011375 17445.5
Thiourea 0000062-56-6 1 0.011375 17445.5
Water 7732-18-5 100 88.2142 135,291,000.0
Formaldehyde 0000050-00-0 1 0.00000138 2.112
Methanol 0000067-56-1 5 0.00000138 2.112
Petroleum Distillates, Hydrotreated Light Naphthenic 64742-53-6 60 0.0180928 27748.3
Ethylene Glycol 107-21-1 60 0.014892 22839.4
Contains no hazardous substances
in concentrations above
cut-off values according to the competent authoriy
Proprietary 100 0.00255233 3914.43
MC S-2510T Multi-Chem Scale Inhibitor Listed Below
Plexslick 930 Universal Friction Reducer Listed Below
Hydrochloric Acid (15%) Universal Acidizing Listed Below
Unihib G Universal Acid Corrosion Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2018 RICE DRILLING B LLC 2,635,394.00 209 0.00 0 0.00 0
2019 RICE DRILLING B LLC 3,016,881.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RICE DRILLING B LLC Drilling Fluid Waste 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 RICE DRILLING B LLC Drill Cuttings 37.40 Tons LANDFILL 100620
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 108.83 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 65.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 1.32 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 834.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 68.20 Tons LANDFILL 06-08438
2017 RICE DRILLING B LLC Drilling Fluid Waste 27.50 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 53.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 9.83 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 54.24 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Servicing Fluid 1.66 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Synthetic Liner Materials 1.03 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Drill Cuttings 115.34 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Drilling Fluid Waste 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 0.51 Tons LANDFILL 06-08438
2017 RICE DRILLING B LLC Synthetic Liner Materials 3.28 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Drilling Fluid Waste 415.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 156.66 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 1,867.37 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 245.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 320.19 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 RICE DRILLING B LLC Produced Fluid 85.85 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 RICE DRILLING B LLC Produced Fluid 422.76 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 424.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 75.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 RICE DRILLING B LLC Produced Fluid 151.17 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 RICE DRILLING B LLC Produced Fluid 117.24 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 145.57 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE N/A
2019 RICE DRILLING B LLC Produced Fluid 288.34 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 RICE DRILLING B LLC Produced Fluid 18.66 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 RICE DRILLING B LLC Produced Fluid 129.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 85.83 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 6,702.03 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 2,135.59 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Produced Fluid 104.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2547461 Primary Facility 2016-12-02 Preoperation Inspection No Violations Noted Preoperational inspection conducted at the request of the operator.
2590269 Primary Facility 2017-05-03 Drilling/Alteration No Violations Noted Butch’s Rathole Service auger rig

Drilled a 36” wellbore and set 26” conductor casing at 40 ft. on 5/1/17.

2614766 Primary Facility 2017-07-07 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29

Moved onto this well on 7/5/17 and resumed drilling at 52 ft. KB. The 20” casing was set at 250 ft. on 7/5/17 and cemented to surface with 8 bbls returned. The 13 3/8” casing was set at 581 ft. on 7/6/17 and cemented to surface with 10 bbls returned. Coal was found from 537 ft. to 544 ft. A basket was set at 517 ft. Currently at 394 ft. and nippling up BOP’s prior to TIH.

2631442 Primary Facility 2017-08-29 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29

Moved onto this well on 8/16/17 and resumed drilling at 6840 ft. KB. KOP was at 6936 ft. EOB was at 8078 ft. MD (7468.91 ft. TVD). TD was at 15,730 ft. MD (7521.49 ft. TVD) on 8/19/17. The 5 ½” casing was set at 15,720 ft. Estimated TOC at 2072 ft.

2748443 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Large water tank on site. There is also some soft containment and miscellaneous equipment on site.

For data sources see[8]

References