If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-46154 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.610367,"lon":-79.560464,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Allegheny Township | |
Operator Name: PENNFIELD ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: HICKMAN 1772 | |
License Status: Active | |
Spud Date: 2017-10-12 | |
Permit Date: 2017-08-07 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.610367 | |
Longitude: -79.560464 |
Date | Event |
---|---|
2017-08-07 | New Permit Application |
2017-10-13 | Performed Spud Operation |
2017-10-16 | Drilling Completion |
2017-11-13 | Perforation |
2017-11-15 | Performed Stage 1 of Stimulation |
2017-11-15 | Performed Stage 2 of Stimulation |
2017-11-15 | Performed Stage 3 of Stimulation |
2017-11-15 | Performed Stage 4 of Stimulation |
2017-11-15 | Performed Stage 5 of Stimulation |
2017-11-15 | Performed Stage 6 of Stimulation |
2019-06-04 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-11-15 | 1 | Sand | 0 | 1,350 | 1,350 |
2017-11-15 | 2 | Sand | 0 | 1,550 | 1,650 |
2017-11-15 | 3 | Sand | 0 | 1,250 | 2,250 |
2017-11-15 | 4 | Sand | 0 | 1,350 | 2,575 |
2017-11-15 | 5 | Sand | 0 | 1,350 | 1,200 |
2017-11-15 | 6 | Sand | 0 | 1,550 | 2,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | PENNFIELD ENERGY LLC | 0.00 | 0 | 343.25 | 75 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | PENNFIELD ENERGY LLC | Produced Fluid | 18.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | PENNFIELD ENERGY LLC | Drilling Fluid Waste | 367.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2640284 | Primary Facility | 2017-09-26 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. I met with Matt Duckett onsite to discuss changes to the construction of the well pad. The changes need made on the E&S plan. The site needs temporarily stabilized. |
2647515 | Primary Facility | 2017-10-16 | Drilling/Alteration | No Violations Noted | Electronic spud notification received for 10/13/17. Rig currently 780ft and anticipating TD at 1015ft. Fluids and cuttings contained in a lined 20ml pit with adequate freeboard space. |
2649478 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled pit is lined with greater than two feet of freeboard. The site is stable. There are no E&S issues. |
2659453 | Primary Facility | 2017-11-13 | Drilling/Alteration | No Violations Noted | Inspection shows Howards on site preparing to notching. |
2660379 | Primary Facility | 2017-11-15 | Drilling/Alteration | No Violations Noted | Howards on site to stimulate six stages. Containment constructed around the well bore with fluids contained in a lined 20ml pit.
Notches: 591ft 60sks 5400gal fluid. S/I pres 800lbs 637ft 50sks 4000gal fluid. S/I pres 800lbs Pump truck broke down. Following stages scheduled for 11/16/17. 644ft 648ft 775ft 779ft |
2661132 | Primary Facility | 2017-11-16 | Drilling/Alteration | No Violations Noted | Howards on site to stimulate six stages. Containment constructed around the well bore with fluids contained in a lined 20ml pit.
Notches: 591ft 60sks 5400gal fluid. S/I pres 800lbs 637ft 50sks 4000gal fluid. S/I pres 800lbs Pump truck broke down. Following stages scheduled for 11/16/17. Above information gathered on 11/15/17. 644ft 60sks. 5200gal fluid. S/I pres 650lbs 648ft 60sks. 4300gal fluid. S/I pres 550lbs 775ft. 60sks. 4100gal fluid. S/I pres 550lbs 779ft. 60sks. 4400gal fluid. S/I pres 550lbs |
2662286 | Primary Facility | 2017-11-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The rig is onsite currently shut down. There is a breakdown with equipment. The pit is lined with greater than two feet of freeboard. The site is stable. There are no E&S issues. |
2662332 | Primary Facility | 2017-11-14 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently notching the well. The pit is lined with greater than two feet of freeboard. The site is stable. There are no E&S issues. |
2664963 | Primary Facility | 2017-11-20 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is completed, producing, not labeled, and the annulus is plumbed to produce gas. The pit remains open and is approaching two feet of freeboard. The site is soft and rutted. There is surface water running down the access road across the location. The site should be graded to control the surface water. |
2668090 | Primary Facility | 2017-12-07 | Administrative/File Review | Violation(s) Noted | Records show well was spudded on 10/13/17. Operator failed to submit the Well Record within 30 days of cessation of drilling. |
2671112 | Primary Facility | 2017-12-07 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is plumbed to produce gas. The site has been mulched. The access roads have been graded and are stable. There are no E&S issues. |
2672393 | Primary Facility | 2017-12-18 | Administrative/File Review | No Violations Noted | Records show NOV issued on 12/7/17 for 78.122(a), failure to submit well record within 30 day of cessation of drilling. Well record received December 12, 2017. Violation has been corrected. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2668090 | 803444 | 2017-12-07 | 2017-12-18 | 78.122(A) | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
803444 | 360092 | NOV - Notice of Violation | 2017-12-18 | ||||
803444 | 375242 | CPA - Civil Penalty Assessment | Comply/Closed | 2020-01-31 | $16,285.00 | $0.00 | |
803444 | 383502 | CACP - Consent Assessment of Civil Penalty | $10,000.00 | $5,000.00 |
For data sources see[8]