X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-24619

Well Details

Well ID: 37-125-24619
Loading map...
County: Washington
Municipality: West Bethlehem Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147809
Farm/Lease Name: BERCOSKY UNIT 5H-A
First Permit Date: 2011-11-21
Last Permit Date: 2011-11-21
Spud Date: 2012-06-29
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 1
Latitude: 40.046561
Longitude: -80.100972

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 387354.0 102.0 0.0 0.0 0.0 0.0
2014-1 386768.0 125.0 0.0 0.0 0.0 0.0
2014-2 350137.0 184.0 0.0 0.0 0.0 0.0
2015-02 44944.0 28.0 0.0 0.0 0.0 0.0
2015-01 54189.0 31.0 0.0 0.0 0.0 0.0
2015-03 48253.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILLING FLUID WASTE 11.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 184.34 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 DRILLING FLUID WASTE 340.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 DRILLING FLUID WASTE 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 DRILL CUTTINGS 797.06 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2013-1 DRILLING FLUID WASTE 46.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 DRILLING FLUID WASTE 7.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 FRACING FLUID WASTE 504.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 434.31 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 7.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 DRILL CUTTINGS 1.77 Tons LANDFILL 100592 SOUTH HILLS LANDFILL SOUTH HILLS PA
2014-1 FLOWBACK FRACTURING SAND 27.63 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2014-1 FRACING FLUID WASTE 6.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FRACING FLUID WASTE 192.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 17.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 FLOWBACK FRACTURING SAND 1.92 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2014-2 FLOWBACK FRACTURING SAND 24.36 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565 US ECOLOGY DETROIT MI
2014-2 FRACING FLUID WASTE 79.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2052720 2012-03-20 No Violations Noted Location is under construction. Dirt is being moved to level out pad so stone can be hauled in.
2071526 2012-05-16 In Compliance with Policy
2084841 2012-07-02 In Compliance with Policy
2085151 2012-07-17 No Violations Noted
2122321 2012-10-25 No Violations Noted
2164915 2013-05-09 In Compliance with Policy An Administrative Review of this incident revealed the following:

On May 9, 2013, the department received an email report form Nick Staffieri about a small sewage spill at Chevronï¾’s Bercosky 6 site in West Bethlehem Township, Washington County. The email was a follow-up of a report to Vince Yantko on May 7th.

According to the report, a vent overflowed, resulting in a small (6 gallon) sewage spill. The restroom trailer was taken out of service and thesite was cleaned appropriately.

Upon review of this spill incident, Chevron met the reporting requirements and the reported remediation is in compliance with the Departmentï¾’s current Spill Policy.

2172607 2013-06-06 Violation(s) Noted On May 15, 2013, Chevron had a brine spill at its Bercosky site located in West Bethlehem Township, Washington County. According to Chevronメs incident report, a driver spilled about 50 gallons of reuse water during unloading. Although the incident happened at approximately 10:00, Chevron did not notify the Department until 15:30; this is a violation of ᄃ 78.66(b) of the Rules and Regulations.

Chevronï¾’s report indicates that they handled the rest of the incident correctly.

669808 78.66BRINE - Failure to report a reportable release of brine to DEP within 2 hours.

For data sources see[3]

References