X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24583"

m
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24583
 
| Well ID: 37-125-24583
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.178888, -79.976194 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.178889, -79.976194 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Washington County, Pennsylvania|Washington]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Carroll Township, Washington County, Pennsylvania|Carroll Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| County: [[Washington_County,_Pennsylvania|Washington]]
 
|-
 
|-
| First Permit Date: 2011-10-20
+
| Municipality: [[Carroll Township,_Washington_County,_Pennsylvania|Carroll Township]]
 
|-
 
|-
| Last Permit Date: 2011-10-20
+
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
| Spud Date: None
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: Yes
+
| Farm/Lease Name: HAROLD HAYWOOD WAS 1H
 
|-
 
|-
| Horizontal: Yes
+
| License Status:  
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 
|-
 
|-
| Latitude: 40.178888
+
| Permit Date: 2011-10-20
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.178889
 
|-
 
|-
 
| Longitude: -79.976194
 
| Longitude: -79.976194
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-10-20
 +
| New Permit Application
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Period
!scope="col" | DATE
+
!scope="col" | Operator Name
!scope="col" | DESCRIPTION
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | COMMENT
+
!scope="col" | Gas Production Days
!scope="col" | VIOLATION ID
+
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Inspection Category
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Inspection Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Inspection Type
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Inspection Result
!scope="col" | OIL QUANTITY
+
!scope="col" | Inspection Comments
!scope="col" | OIL PRODUCTION DAYS
+
|-
 +
| 2395352
 +
| Primary Facility
 +
| 2015-07-31
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 7/31/15, I inspected the Harold Haywood site as a routine inspection and made the following observations:
 
|-
 
|-
| 2012-1
+
| 2471497
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2015-12-11
| style="text-align:right;" | 0.0
+
| Routine/Partial Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| On 12/11/15, I performed a routine partial inspection of the Harold Haywood Site in response to observed activity on the pad and made the following observations:
| style="text-align:right;" | 0.0
+
 
 
|-
 
|-
 +
| 2549504
 +
| Primary Facility
 +
| 2016-12-06
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| On 12/6/16, I performed a routine partial inspection of the Harold Haywood in response to observed activity on site and made the following observations:
 +
•A drilling rig was being constructed on site at the time of inspection.
 +
•A large panel had been set on the pad near the juncture of the pad and access road with a chemical container, multiple metal drums, and multiple pieces of oil covered equipment.  A small amount of oil had reached the pad surface.  The situation was pointed out to site personnel and was then promptly remediated including removal of all visibly impacted pad material.  No violation.
 +
•A coil of hose was also found off containment dripping oily material to the pad surface and was promptly removed.  No violation.
 
|-
 
|-
| 2011-2
+
| 2553002
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-12-16
| style="text-align:right;" | 0.0
+
| Follow-up Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| On December 16, 2016 I performed a follow up inspection at the Howard Haywood site in response to concerns noted in a previous inspection (ID:  2549486) of the site on 12/6/16 and made the following observations:
| style="text-align:right;" | 0.0
+
•On 12/6/16 multiple issues with containment and minor spills were noted to site personnel and immediately remediated.
 +
•Near the junction of the site access road and the pad a large metal plate had been placed so that it was crushing and compromising the containment around multiple pallets of chemicals marked “AES Drilling Fluids”.  Multiple other empty chemical storage containers were also found without any containment.  This is a violation of 58 Pa. C.S. § 3218.2(d) for failing to provide containment with at least 110% capacity on regulated substances.
 +
•A spill of more than ten gallons of antifreeze was found off of containment near the drill rig.  The situation was immediately communicated to site personnel for remediation.  This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
+
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 11:55, 15 May 2020

Well Details

Well ID: 37-125-24583
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: HAROLD HAYWOOD WAS 1H
License Status:
Spud Date:
Permit Date: 2011-10-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.178889
Longitude: -79.976194

For data sources see[1][2][3]

Well History

Date Event
2011-10-20 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2395352 Primary Facility 2015-07-31 Routine/Complete Inspection No Violations Noted On 7/31/15, I inspected the Harold Haywood site as a routine inspection and made the following observations:
2471497 Primary Facility 2015-12-11 Routine/Partial Inspection No Violations Noted On 12/11/15, I performed a routine partial inspection of the Harold Haywood Site in response to observed activity on the pad and made the following observations:
2549504 Primary Facility 2016-12-06 Routine/Partial Inspection No Violations Noted On 12/6/16, I performed a routine partial inspection of the Harold Haywood in response to observed activity on site and made the following observations:

•A drilling rig was being constructed on site at the time of inspection. •A large panel had been set on the pad near the juncture of the pad and access road with a chemical container, multiple metal drums, and multiple pieces of oil covered equipment. A small amount of oil had reached the pad surface. The situation was pointed out to site personnel and was then promptly remediated including removal of all visibly impacted pad material. No violation. •A coil of hose was also found off containment dripping oily material to the pad surface and was promptly removed. No violation.

2553002 Primary Facility 2016-12-16 Follow-up Inspection No Violations Noted On December 16, 2016 I performed a follow up inspection at the Howard Haywood site in response to concerns noted in a previous inspection (ID: 2549486) of the site on 12/6/16 and made the following observations:

•On 12/6/16 multiple issues with containment and minor spills were noted to site personnel and immediately remediated. •Near the junction of the site access road and the pad a large metal plate had been placed so that it was crushing and compromising the containment around multiple pallets of chemicals marked “AES Drilling Fluids”. Multiple other empty chemical storage containers were also found without any containment. This is a violation of 58 Pa. C.S. § 3218.2(d) for failing to provide containment with at least 110% capacity on regulated substances. •A spill of more than ten gallons of antifreeze was found off of containment near the drill rig. The situation was immediately communicated to site personnel for remediation. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code

For data sources see[6]

References