X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24303"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24303
 
| Well ID: 37-125-24303
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.466861, -80.351416 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.466861, -80.351417 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Washington County, Pennsylvania|Washington]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Robinson Township, Washington County, Pennsylvania|Robinson Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[Robinson Township,_Washington_County,_Pennsylvania|Robinson Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[147136|147136]]
+
| Well Pad ID: [[147136]]
 
|-
 
|-
 
| Farm/Lease Name: ROBINHILL 21H
 
| Farm/Lease Name: ROBINHILL 21H
 
|-
 
|-
| First Permit Date: 2010-10-19
+
| License Status: Regulatory Inactive Status
 
|-
 
|-
| Last Permit Date: 2010-10-19
+
| Spud Date: 12/14/2010
 
|-
 
|-
| Spud Date: 2010-12-14
+
| Permit Date: 10/19/2010
 
|-
 
|-
| Unconventional: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Horizontal: Yes
+
| Configuration: Horizontal Well
|-
 
| Well Status: ACTIVE
 
|-
 
| Violations: 0
 
 
|-
 
|-
 
| Latitude: 40.466861
 
| Latitude: 40.466861
 
|-
 
|-
| Longitude: -80.351416
+
| Longitude: -80.351417
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 43316.0
 
| style="text-align:right;" | 17.0
 
| style="text-align:right;" | 724.73
 
| style="text-align:right;" | 17.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 332414.0
 
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 1339.45
 
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 186975.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 232.8
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2011
| style="text-align:right;" | 188494.0
+
| [[ATLAS RESOURCES LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 43,316.00
| style="text-align:right;" | 291.28
+
| style="text-align: right;" | 17
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 724.73
 +
| style="text-align: right;" | 17
 
|-
 
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 519,389.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,572.25
 +
| style="text-align: right;" | 366
 
|-
 
|-
| 2013-2
+
| 2013
| style="text-align:right;" | 108118.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 296,612.00
| style="text-align:right;" | 154.88
+
| style="text-align: right;" | 365
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 446.16
 +
| style="text-align: right;" | 365
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 345,234.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 114.51
 +
| style="text-align: right;" | 184
 +
| style="text-align: right;" | 1,229.70
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-1
+
| 2015
| style="text-align:right;" | 193436.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 217,390.00
| style="text-align:right;" | 452.7
+
| style="text-align: right;" | 281
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 331.58
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 130
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2017
| style="text-align:right;" | 151798.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 777.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 114.51
+
| style="text-align: right;" | 0
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2015-02
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 20228.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 25569.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 2.93
 
| style="text-align:right;" | 31.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 26418.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 65.9
 
| style="text-align:right;" | 31.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 8.0
+
| style="text-align: right;" | 8,534.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2011-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 440.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 100.0
+
| style="text-align: right;" | 100.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-007-24355
 
| 34-007-24355
| MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 340.0
+
| style="text-align: right;" | 340.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 7.0
+
| style="text-align: right;" | 440.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| PA0101508
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 85.0
+
| style="text-align: right;" | 7,820.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| 301353
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 4,305.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-007-24355
 
| 34-007-24355
| MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2011-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 345.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 85.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| PA0095273
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 345.0
+
| style="text-align: right;" | 1,035.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| WMGR123SW001
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,300.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 615.0
+
| style="text-align: right;" | 615.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-007-24355
 
| 34-007-24355
| MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 78.0
+
| style="text-align: right;" | 78.00 Bbl
| Bbl
 
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
| 34-167-29359
 
| 34-167-29359
| WEST VIRGINIA OIL GATHERING
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 537.0
+
| style="text-align: right;" | 537.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-2-3995
 
| 34-121-2-3995
| HUNTERS  SWIW #5
 
| RENO
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 3,621.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,744.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 774.0
+
| style="text-align: right;" | 774.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 310.0
+
| style="text-align: right;" | 310.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,593.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 
|-
 
|-
| 2014-1
+
| 2014-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 777.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 525.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 
|-
 
|-
| 2014-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 777.0
+
| style="text-align: right;" | 370.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1938168
 
| 1938168
| 2010-12-16
+
| Primary Facility
 +
| 12/16/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Randsom - Well spud, site still under construction , E&S in place on main pad,
 
| Randsom - Well spud, site still under construction , E&S in place on main pad,
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1944794
 
| 1944794
| 2010-11-16
+
| Primary Facility
 +
| 11/16/2010
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1951144
 
| 1951144
| 2011-01-13
+
| Primary Facility
 +
| 01/13/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 13th, 2011 I conducted an inspection of the above site.  A portion of the fill side of the pad had sliped during construction.  I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site.  The fill side was still an estimated 14' below the proposed finished elevation.  Multiple scarp faces were evident with a vetical separation of over 20' at the greatest.  All material that moved stayed within the limit of disturbance.  Some material had entered the interceptor channel at the base of the slope.  No streams or watercourses are in close proximity to the base of the slope.  The material that slid appeared dry and no springs or seeps were observed.  The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed.
 
| On January 13th, 2011 I conducted an inspection of the above site.  A portion of the fill side of the pad had sliped during construction.  I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site.  The fill side was still an estimated 14' below the proposed finished elevation.  Multiple scarp faces were evident with a vetical separation of over 20' at the greatest.  All material that moved stayed within the limit of disturbance.  Some material had entered the interceptor channel at the base of the slope.  No streams or watercourses are in close proximity to the base of the slope.  The material that slid appeared dry and no springs or seeps were observed.  The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1953092
 
| 1953092
| 2011-01-25
+
| Primary Facility
 +
| 01/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011.  Additioanl E&S controls were installed on the lower edge at the toe of the slip.  During excavation and reconstruction the material began to move again.  A scarp face of approximately 4' had developed.  Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation.
 
| On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011.  Additioanl E&S controls were installed on the lower edge at the toe of the slip.  During excavation and reconstruction the material began to move again.  A scarp face of approximately 4' had developed.  Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1957864
 
| 1957864
| 2011-02-04
+
| Primary Facility
 +
| 02/04/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th  and 25th, 2011.  The lower side of the pad continues to slip during excavation.  Construction efforts had been stopped.  Temporary E&S controls put in place will remain in place until drilling is completed.  After drilling is completed reclamation procedures are to start immediately,  The rig was moving onsite today.  A Site ID and E&S plan were posted onsite.  The access road was in good condition.  No spills/ leaks were observed at the time of inspection.    
+
| On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th  and 25th, 2011.  The lower side of the pad continues to slip during excavation.  Construction efforts had been stopped.  Temporary E&S controls put in place will remain in place until drilling is completed.  After drilling is completed reclamation procedures are to start immediately,  The rig was moving onsite today.  A Site ID and E&S plan were posted onsite.  The access road was in good condition.  No spills/ leaks were observed at the time of inspection.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1958492
 
| 1958492
| 2011-02-09
+
| Primary Facility
 +
| 02/09/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th  and 25th, 2011.  No new movement was observed.  Construction efforts had been stopped.  Temporary E&S controls put in place will remain in place until drilling is completed.  After drilling is completed reclamation procedures are to start immediately.  Drilling was started.  A Site ID and E&S plan were posted onsite.  The access road was in good condition.  The pit appeared to be in good condition.  No spills/ leaks were observed at the time of inspection.
 
| On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th  and 25th, 2011.  No new movement was observed.  Construction efforts had been stopped.  Temporary E&S controls put in place will remain in place until drilling is completed.  After drilling is completed reclamation procedures are to start immediately.  Drilling was started.  A Site ID and E&S plan were posted onsite.  The access road was in good condition.  The pit appeared to be in good condition.  No spills/ leaks were observed at the time of inspection.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1961856
 
| 1961856
| 2011-03-10
+
| Primary Facility
 +
| 03/10/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On March 10th 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig had moved offsite.  The drill cuttings were being removed with an excavator and being hauled offsite.  No additional movement was observed on the slide.  The access road was in good condition.  A site ID and E&S plan were posted on site.  Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap.  Some material upslope of the sediment trap had slid into the trap.  Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200﾿.  No streams or watercourses close.  Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock.
+
| On March 10th 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig had moved offsite.  The drill cuttings were being removed with an excavator and being hauled offsite.  No additional movement was observed on the slide.  The access road was in good condition.  A site ID and E&S plan were posted on site.  Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap.  Some material upslope of the sediment trap had slid into the trap.  Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200¿.  No streams or watercourses close.  Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1961858
 
| 1961858
| 2011-03-11
+
| Primary Facility
 +
| 03/11/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap.  Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap.  No more erosion was evident.  All activities were within the limit of disturbance
 
| On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap.  Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap.  No more erosion was evident.  All activities were within the limit of disturbance
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1992019
 
| 1992019
| 2011-06-27
+
| Primary Facility
 +
| 06/27/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 27th 2011 I conducted a routine inspection of the above site.  Drilling was completed and production units were being installed.  The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site.  The access road was in good condition, Site ID and E&S plan were posted on site.  No erosion was leaving site and was contained within the E&S controls.  The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established.
 
| On June 27th 2011 I conducted a routine inspection of the above site.  Drilling was completed and production units were being installed.  The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site.  The access road was in good condition, Site ID and E&S plan were posted on site.  No erosion was leaving site and was contained within the E&S controls.  The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2083597
 
| 2083597
| 2012-07-12
+
| Primary Facility
 +
| 07/12/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Looked at small slide on Robinhill #21.  Small enough that they don't need a ESCPG-01.  I will continue to monitor.
 
| Looked at small slide on Robinhill #21.  Small enough that they don't need a ESCPG-01.  I will continue to monitor.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2085188
 
| 2085188
| 2012-07-20
+
| Primary Facility
 +
| 07/20/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2094821
 
| 2094821
| 2012-08-22
+
| Primary Facility
 +
| 08/22/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On August 22, 2012, I stopped for a routine inspection at Chevronï¾’s Robinhill #21; I met with Blake Loke, Matthew Barch and others.
+
| On August 22, 2012, I stopped for a routine inspection at Chevron’s Robinhill #21; I met with Blake Loke, Matthew Barch and others.
 
 
Chevron is still planning on fixing this slide before the end of this growing season and is finalizing the plans.  They have also talked to Robinson Township about permitting.
 
 
 
The slide itself appears unchanged since my last visit.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2163803
 
| 2163803
| 2013-04-16
+
| Primary Facility
 +
| 04/16/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2212401
 +
| Primary Facility
 +
| 10/09/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2300600
 +
| Primary Facility
 +
| 07/29/2014
 +
| Site Restoration
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2353960
 +
| Primary Facility
 +
| 03/19/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
| 2212401
+
|}-->
| 2013-10-09
+
<!--==== Penalties Applied ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 04/13/2011
 +
| 04/13/2011
 +
| style="text-align: right;" | 5840.00
 +
| style="text-align: right;" | 3,611,396.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="9"| 1
 +
| rowspan="1"| Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 10.48
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Used to open perfs
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Scale Inhibitor
 +
|- valign="top"
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 89.52
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Biocide
 +
|- valign="top"
 +
| rowspan="6"|
 +
| rowspan="6"|
 +
| rowspan="6"| Water Viscosifier
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 32.00
 +
| style="text-align: right;" | 1.31
 +
| style="text-align: right;" |
 
|-
 
|-
| 2353960
+
| Carboxymethylhydroxyporoyl guar bln
| 2015-03-19
 
| No Violations Noted
 
|
 
|
 
|
 
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00600000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00600000
 +
| style="text-align: right;" |
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00100000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Iron Control Agent
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 12:00, 15 July 2019

Well Details

Well ID: 37-125-24303
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Robinson Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147136
Farm/Lease Name: ROBINHILL 21H
License Status: Regulatory Inactive Status
Spud Date: 12/14/2010
Permit Date: 10/19/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.466861
Longitude: -80.351417

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 43,316.00 17 0.00 0 724.73 17
2012 CHEVRON APPALACHIA LLC 519,389.00 366 0.00 0 1,572.25 366
2013 CHEVRON APPALACHIA LLC 296,612.00 365 0.00 0 446.16 365
2014 CHEVRON APPALACHIA LLC 345,234.00 365 114.51 184 1,229.70 365
2015 CHEVRON APPALACHIA LLC 217,390.00 281 331.58 130 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-1 Drilling Fluid Waste (in Barrels) 8,534.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Drilling Fluid Waste (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011-1 Drilling Fluid Waste (in Barrels) 340.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-1 Drilling Fluid Waste (in Barrels) 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-1 Fracing Fluid Waste (in Barrels) 7,820.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Fracing Fluid Waste (in Barrels) 4,305.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011-1 Fracing Fluid Waste (in Barrels) 345.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-1 Fracing Fluid Waste (in Barrels) 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-1 Fracing Fluid Waste (in Barrels) 1,035.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-1 Produced Fluid (in Barrels) 1,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Produced Fluid (in Barrels) 615.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011-1 Produced Fluid (in Barrels) 78.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2011-2 Produced Fluid (in Barrels) 537.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012-1 Produced Fluid (in Barrels) 3,621.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012-2 Produced Fluid (in Barrels) 1,744.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-1 Produced Fluid (in Barrels) 774.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-2 Produced Fluid (in Barrels) 310.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-1 Produced Fluid (in Barrels) 1,593.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-2 Produced Fluid (in Barrels) 777.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015-1 Produced Fluid (in Barrels) 525.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015-2 Produced Fluid (in Barrels) 370.00 Bbl INJECTION DISPOSAL WELL 34-121-23995

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1938168 Primary Facility 12/16/2010 Drilling/Alteration No Violations Noted Randsom - Well spud, site still under construction , E&S in place on main pad,
1944794 Primary Facility 11/16/2010 Complaint Inspection No Violations Noted
1951144 Primary Facility 01/13/2011 Routine/Complete Inspection No Violations Noted On January 13th, 2011 I conducted an inspection of the above site. A portion of the fill side of the pad had sliped during construction. I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site. The fill side was still an estimated 14' below the proposed finished elevation. Multiple scarp faces were evident with a vetical separation of over 20' at the greatest. All material that moved stayed within the limit of disturbance. Some material had entered the interceptor channel at the base of the slope. No streams or watercourses are in close proximity to the base of the slope. The material that slid appeared dry and no springs or seeps were observed. The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed.
1953092 Primary Facility 01/25/2011 Routine/Complete Inspection No Violations Noted On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011. Additioanl E&S controls were installed on the lower edge at the toe of the slip. During excavation and reconstruction the material began to move again. A scarp face of approximately 4' had developed. Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation.
1957864 Primary Facility 02/04/2011 Routine/Complete Inspection No Violations Noted On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th and 25th, 2011. The lower side of the pad continues to slip during excavation. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately, The rig was moving onsite today. A Site ID and E&S plan were posted onsite. The access road was in good condition. No spills/ leaks were observed at the time of inspection.
1958492 Primary Facility 02/09/2011 Routine/Complete Inspection No Violations Noted On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th and 25th, 2011. No new movement was observed. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately. Drilling was started. A Site ID and E&S plan were posted onsite. The access road was in good condition. The pit appeared to be in good condition. No spills/ leaks were observed at the time of inspection.
1961856 Primary Facility 03/10/2011 Routine/Complete Inspection No Violations Noted On March 10th 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig had moved offsite. The drill cuttings were being removed with an excavator and being hauled offsite. No additional movement was observed on the slide. The access road was in good condition. A site ID and E&S plan were posted on site. Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap. Some material upslope of the sediment trap had slid into the trap. Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200¿. No streams or watercourses close. Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock.
1961858 Primary Facility 03/11/2011 Routine/Complete Inspection No Violations Noted On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap. Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap. No more erosion was evident. All activities were within the limit of disturbance
1992019 Primary Facility 06/27/2011 Routine/Complete Inspection No Violations Noted On June 27th 2011 I conducted a routine inspection of the above site. Drilling was completed and production units were being installed. The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site. The access road was in good condition, Site ID and E&S plan were posted on site. No erosion was leaving site and was contained within the E&S controls. The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established.
2083597 Primary Facility 07/12/2012 Routine/Complete Inspection No Violations Noted Looked at small slide on Robinhill #21. Small enough that they don't need a ESCPG-01. I will continue to monitor.
2085188 Primary Facility 07/20/2012 Routine/Complete Inspection No Violations Noted
2094821 Primary Facility 08/22/2012 Routine/Complete Inspection No Violations Noted On August 22, 2012, I stopped for a routine inspection at Chevron’s Robinhill #21; I met with Blake Loke, Matthew Barch and others.
2163803 Primary Facility 04/16/2013 Routine/Complete Inspection No Violations Noted
2212401 Primary Facility 10/09/2013 Routine/Complete Inspection No Violations Noted
2300600 Primary Facility 07/29/2014 Site Restoration No Violations Noted
2353960 Primary Facility 03/19/2015 Routine/Complete Inspection No Violations Noted

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/13/2011 04/13/2011 5840.00 3,611,396.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Proppant 100.00 10.48
Used to open perfs
Scale Inhibitor
Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Water Carrier/Base Fluid 100.00 89.52
Biocide
Water Viscosifier Hydrochloric acid 7647-01-0 32.00 1.31
Carboxymethylhydroxyporoyl guar bln 100.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00600000
Polyethylene glycol 25322-68-3 60.00 0.01
Ethylene glycol 107-21-1 30.00 0.00600000
Dibromoacetonitrile 3252-43-5 5.00 0.00100000
Iron Control Agent

For data sources see[7]

References