X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-23977"

m
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 18:26, 3 July 2014

Well Details

Well ID: 37-125-23977
Loading map...
Operator Name: CONSOL GAS CO
First Permit Date: 2010-01-07
Last Permit Date: 2010-01-07
Spud Date: 2010-06-08
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.081016
Longitude: -79.973846

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 705.94 365.0 0.0 0.0 0.0 0.0
2012-0 1045.0 366.0 0.0 0.0 0.0 0.0
2011-0 1714.0 365.0 0.0 0.0 0.0 0.0
2010-0 2155.0 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 FRACING FLUID WASTE 660.0 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2010-0 FRACING FLUID WASTE 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 DRILLING FLUID WASTE 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 FRACING FLUID WASTE 1100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 PRODUCED FLUID 140.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1892950 2010-06-10 No Violations Noted Rig 19- drilling out shoe on 9 5/8 after cement dry time, site and location good

References